PEACE Real Time Operations


Spacecraft 1

Date Time Ops carried out
04.05.01 11:25 - 11:51 Instrument powered on and run for short while to check no problems after CTU reset
25.06.01 09:35 - 11:00 LEEA MCP commissioning
27.06.01 09:33 - 11:50 LEEA, then HEEA MCP commissioning
11.09.01 12:37 - 13:08 Uplink of energy efficiencies, geometric factors and FGM calibration factors
09.04.02 14:23 - 15:33 LEEA MCP commissioning
10.04.02 11:09 - 12:24 HEEA MCP commissioning
04.03.03 12:45 - 14:40 HEEA, then LEEA MCP commissioning
14.08.03 13:09 - 14:28 LEEA MCP commissioning
18.08.03 13:30 - 14:15 HEEA MCP commissioning
20.07.04 15:43 - 16:49 LEEA, then HEEA MCP commissioning
29.03.06 13:00 - 15:00 Uplink of all calibration factors after complete power down in eclipse
30.05.07 12:09 - 12:40 RA3 test
13.06.07 12:41 - 13:19 PRESET patch test
04.12.07 15:52 - 17:30 LEEA, then HEEA MCP commissioning
13.12.07 17:15 - 19:10 LEEA, then HEEA MCP commissioning
07.02.08 15:45 - 17:00 PRESET patch test
04.09.08 16:11 - 17:50 HEEA, then LEEA MCP commissioning
13.11.08 13:41 - 14:55 LEEA MCP commissioning
04.03.10 14:30 - 16:11 LEEA MCP commissioning
14.09.11 15:49 - 17:11 HEEA, then LEEA MCP commissioning


Spacecraft 2

Date Time Ops carried out
02.07.01 08:40 - 10:41 LEEA, then HEEA MCP commissioning
11.09.01 13:09 - 13:37 Uplink of energy efficiencies, geometric factors and FGM calibration factors
10.04.02 08:18 - 10:23 HEEA, then LEEA MCP commissioning
04.03.03 09:00 - 11:40 HEEA, then LEEA MCP commissioning
30.06.03 11:11 - 12:25 LEEA MCP commissioning
07.08.03 12:44 - 13:50 HEEA MCP commissioning
14.07.04 10:45 - 12:33 HEEA MCP commissioning
19.07.04 09:00 - 10:30 LEEA MCP commissioning
18.08.05 14:00 - 15:04 HEEA MCP commissioning
09.05.07 09:30 - 10:30 PRESET patch test
13.06.07 10:06 - 11:36 PRESET patch test
23.10.07 12:57 - 13:43 Uplink of geometric factors
29.10.07 17:02 - 18:13 Re-uplink of geometric factors
20.11.07 07:21 - 07:26 Uplink of FGM calibration factors
11.12.07 15:10 - 17:22 HEEA, then LEEA MCP commissioning
07.02.08 11:40 - 14:30 PAD and PRESET patch test
14.09.11 14:29 - 14:53 Stim test to investigate low anode 1 counts
02.05.13 11:51 - 12:25 Test of TM map change to allow PEACE more data in BM2 and BM3. New TM map left in place after this


Spacecraft 3

Date Time Ops carried out
04.05.01 12:55 - 13:29 Instrument powered on and run for short while to check no problems after CTU reset. No commands sent after boot up though
08.05.01 11:33 - 11:57 Instrument again powered on and run for short while to check no problems after CTU reset. This time runs ok
25.06.01 07:20 - 08:43 LEEA MCP commissioning
02.07.01 06:30 - 08:00 HEEA MCP commissioning
28.08.01 10:47 - 12:30 Investigative work after a couple of DPU-sensor communications failures
11.09.01 13:54 - 14:28 Uplink of energy efficiencies, geometric factors and FGM calibration factors
09.04.02 06:59 - 11:53 HEEA, then LEEA MCP commissioning
27.02.03 14:00 - 17:15 HEEA, then LEEA MCP commissioning
01.07.03 07:45 - 09:38 HEEA MCP commissioning
07.08.03 10:00 - 12:13 LEEA MCP commissioning
23.09.03 09:20 - 11:43 HEEA, then LEEA MCP commissioning
15.07.04 08:00 - 10:11 HEEA, then LEEA MCP commissioning
13.08.05 13:30 - 16:00 Investigative work after 36V problem, carried out at CSSAR
22.08.05 10:30 - 12:15 LEEA, then HEEA MCP commissioning
13.10.05 08:35 - 09:10 Stim test to investigate low anode 2 counts
27.10.06 13:13 - 14:38 PRESET patch test
02.11.06 10:00 - 11:43 PAD and PRESET patch test
10.05.07 16:43 - 17:58 PRESET patch test
29.06.07 13:20 - 15:45 PRESET patch test
25.10.07 11:35 - 11:56 Uplink of FGM calibration factors
29.04.13 09:52 - 10:27 Test of TM map change to allow PEACE more data in BM2 and BM3. New TM map left in place after this
03.05.13 14:40 - 16:30 Investigation of sc3 anomaly and operational capability
07.05.13 14:40 - 17:08 Investigation of sc3 anomaly and operational capability
08.05.13 10:10 - 12:15 Investigation of sc3 anomaly and operational capability
10.05.13 09:00 - 10:48 Investigation of sc3 anomaly and operational capability
14.05.13 08:40 - 10:08 Investigation of sc3 anomaly and operational capability
14.06.13 15:00 - 23:59 Investigation of sc3 anomaly and operational capability - SP test
15.06.13 00:00 - 12:24 Investigation of sc3 anomaly and operational capability - SP test
28.06.13 11:45 - 13:19 Investigation of sc3 anomaly and operational capability - IP test


Spacecraft 4

Date Time Ops carried out
04.05.01 09:45 - 10:16 Instrument powered on and run for short while to check no problems after CTU reset
27.06.01 12:30 - 14:20 LEEA, then HEEA MCP commissioning
11.09.01 14:47 - 17:00 Uplink of energy efficiencies, geometric factors and FGM calibration factors
09.04.02 12:00 - 14:08 HEEA, then LEEA MCP commissioning
27.02.03 09:00 - 12:05 LEEA, then HEEA MCP commissioning
14.05.03 11:16 - 11:29 Powering on after anomaly
12.08.03 07:30 - 09:00 HEEA MCP commissioning
18.08.03 11:50 - 13:07 HEEA MCP commissioning
14.07.04 08:30 - 10:30 LEEA MCP commissioning
09.09.04 15:32 - 17:41 LEEA, then HEEA MCP commissioning
21.02.05 10:15 - 11:37 LEEA MCP commissioning
09.09.05 15:25 - 18:39 LEEA, then HEEA MCP commissioning
10.02.06 15:30 - 16:57 LEEA, then HEEA MCP commissioning
15.06.07 16:00 - 17:25 HEEA, then LEEA MCP commissioning
07.09.07 13:08 - 14:47 Uplink of new calibration factors
11.09.07 14:02 - 14:47 Recover instrument and uplink all calibration factors
25.10.07 16:02 - 16:31 Uplink of new calibration factors
08.09.09 08:50 - 09:56 LEEA MCP commissioning
14.09.11 12:06 - 13:31 LEEA MCP commissioning
30.04.13 13:21 - 13:56 Test of TM map change to allow PEACE more data in BM2 and BM3. New TM map left in place after this