UCL DEPARTMENT OF SPACE & CLIMATE PHYSICS
SPACE PLASMA PHYSICS GROUP
UCL

Group research
    Research
    Missions
About us
    People
    Contact Us
    Meetings
Know our science
Opportunities
    MSSL Jobs


Dec 2004 Sc1 Calendar sc2 sc3 sc4

Power on / Start

Mode

Power off

Orbit #

Planning period

date

time

date

time

30.12.04

02:40

At L=6 all power on into 88m28-72m12-cplr (-cprl on sc2)

   

694

241

 

11:25

At M+ o/b all change to 88h58-72m12-cplr (-cprl on sc2) and MCP levels are lowered to gain of around 0.5

   

694

241

 

13:41

Sc 1,2,3 power off at M- o/b

   

694

241

 

21:25

Sc4 power cycles to single sensor mode off-76m16-cpls, LEEA MCPstill at gain of as close to 0.5 as possible at BS o/b

   

694

241

31.12.04

20:10

Sc4 HEEA powers on and instrument changes to 88h58-72m12-cplr,
MCPs still set to gain of as close to 0.5 as possible at BS i/b

   

694

241

01.01.05

02:15

Sc 1,2,3 power on into 88h58-72m12-cplr (-cprl on sc2), MCPs set to gain of as close to 0.5 as possible at M- i/b

   

694

241

 

04:05

All change to 88m28-72m12-cplr (-cprl on sc2) and MCPs are returned to operational levels at M+ i/b and all power off at L=6

01.01.05

09:45

694

241

   

ASPOC not operational on pp242

       

01.01.05

11:28

At L=6 all power on into 88m28-72m12-cplr (-cprl on sc2)

   

695

242

 

20:30

Sc1,3 change to 88m28-72m12-cplxt-apl-64w12, sc 2,4 to 88m28-72m12-cplxy-apl-nw-aph-nw and all MCPs lowered to gain of around 0.5 for BM through MP o/b

   

695

242

 

22:00

Sc1 changes to 88h58-72m12-cplr; sc 2,3,4 power off at end of BM

   

695

242

02.01.05

05:50

Sc1 power cycles to single sensor mode off-76m16-cpls, LEEA MCPstill at gain of as close to 0.5 as possible at BS o/b

   

695

242

03.01.05

05:30

Sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr,
MCPs still set to gain of as close to 0.5 as possible at BS i/b

   

695

242

 

11:40

Sc 2,3,4 power on into 88h58-72m12-cplr (-cprl on sc2), MCPs set to gain of as close to 0.5 as possible at M- i/b

   

695

242

 

13:10

All change to 88m28-72m12-cplr (-cprl on sc2) and MCPs are returned to operational levels at M+ i/b

   

695

242

 

14:30

MCP op level test performed, sensors in 68h38-68h38, performed at same time on all sc 4hrs 45 mins before sc1 L=6 

   

695

242

 

15:15

All change back to 88m28-72m12-cplr (-cprl on sc2) at end of test and all power off at L=6

03.01.05

19:20

695

242

03.01.05

21:00

At L=6 all power on into 88m28-72m12-cplr (-cprl on sc2)

   

696

242

04.01.05

06:05

At end of o/b cusp all change to 88h58-72m12-cplr (-cprl on sc2) and MCP levels are lowered to gain of around 0.5

   

696

242

 

07:05

Sc 2,3,4 power off at M- o/b

   

696

242

 

14:10

Sc1 power cycles to single sensor mode off-76m16-cpls, LEEA MCPstill at gain of as close to 0.5 as possible at BS o/b

   

696

242

05.01.05

14:50

Sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr,
MCPs still set to gain of as close to 0.5 as possible at BS i/b

   

696

242

 

20:45

Sc 2,3,4 power on into 88h58-72m12-cplr (-cprl on sc2), MCPs set to gain of as close to 0.5 as possible at M- i/b

   

696

242

 

21:35

All change to 88m28-72m12-cplr (-cprl on sc2) and MCPs are returned to operational levels at start of i/b cusp and all power off at L=6

06.01.05

04:25

696

242

06.01.05

05:40

At L=6 all power on into 88m28-72m12-cplr (-cprl on sc2)

   

697

242

 

13:55

Sc1,3 change to 88m28-72m12-cplxt-apl-64w12, sc 2,4 to 88m28-72m12-cplxy-apl-nw-aph-nw and all MCPs lowered to gain of around 0.5 for BM through MP o/b

   

697

242

 

16:55

Sc1 changes to 88h58-72m12-cplr; sc 2,3,4 power off at end of BM

   

697

242

 

22:35

Sc1 power cycles to single sensor mode off-76m16-cpls, LEEA MCPstill at gain of as close to 0.5 as possible at BS o/b

   

697

242

08.01.05

00:10

Sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr,
MCPs still set to gain of as close to 0.5 as possible at BS i/b

   

697

242

 

05:55

Sc 2,3,4 power on into 88h58-72m12-cplr (-cprl on sc2), MCPs set to gain of as close to 0.5 as possible at M- i/b

   

697

242

 

07:20

All change to 88m28-72m12-cplr (-cprl on sc2) and MCPs are returned to operational levels at M+ i/b and all power off at L=6

08.01.05

13:05

697

242

   

ASPOC not operational on pp243

       

08.01.05

14:55

At L=6 all power on into 88m28-72m12-cplr (-cprl on sc2)

   

698

243

 

21:45

Sc1,3 change to 88m28-72m12-cplxt-apl-64w12, sc 2,4 to 88m28-72m12-cplxy-apl-nw-aph-nw and all MCPs lowered to gain of around 0.5 for BM just before MP o/b

   

698

243

 

23:15

All change to 88h58-72m12-cplr (-cprl on sc2) at end of BM

   

698

243

09.01.05

00:45

Sc 1,3,4 power off at M- o/b

   

698

243

 

06:50

Sc2 power cycles to single sensor mode off-76m16-cpls, LEEA MCPstill at gain of as close to 0.5 as possible at BS o/b

   

698

243

10.01.05

09:50

Sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr,
MCPs still set to gain of as close to 0.5 as possible at BS i/b

   

698

243

 

14:45

Sc 1,3,4 power on into 88h58-72m12-cplr (-cprl on sc2), MCPs set to gain of as close to 0.5 as possible at M- i/b

   

698

243

 

16:25

All change to 88m28-72m12-cplr (-cprl on sc2) and MCPs are returned to operational levels at M+ or start of i/b cusp

   

698

243

 

17:40

MCP op level test performed, sensors in 68h38-68h38, performed at same time on all sc 4hrs 45 mins before sc1 L=6 

   

698

243

 

18:25

All change back to 88m28-72m12-cplr (-cprl on sc2) at end of test and all power off at L=6

10.01.05

22:25

698

243

11.01.05

00:05

At L=6 all power on into 88m28-72m12-cplr (-cprl on sc2)

   

699

243

 

07:50

At M+ o/b all change to 88h58-72m12-cplr (-cprl on sc2) and MCP levels are lowered to gain of around 0.5

   

699

243

 

09:35

Sc 1,3,4 power off at M- o/b

   

699

243

 

14:00

Sc 2 powers off 12 mins before, then sc 1,3 power on into single sensor mode off-72m12-cpxy-apl-64w12-tnl-nw and sc 2,4 into off-72m12-cplx-anl-nw for BM through BS, MCPs at gain of as close to 0.5 as possible

   

699

243

 

17:00

Sc2 changes to off-76m16-cpls, LEEA MCPstill at gain of as close to 0.5 as possible; sc 1,3,4 power off at end of BM

   

699

243

12.01.05

19:10

Sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr,
MCPs still set to gain of as close to 0.5 as possible at BS i/b

   

699

243

 

23:50

Sc 1,3,4 power on into 88h58-72m12-cplr (-cprl on sc2), MCPs set to gain of as close to 0.5 as possible at M- i/b

   

699

243

 

00:50

All change to 88m28-72m12-cplr (-cprl on sc2) and MCPs are returned to operational levels at M+ or start of i/b cusp and all power off at L=6

13.01.05

07:05

699

243

13.01.05

08:45

At L=6 all power on into 88m28-72m12-cplr (-cprl on sc2)

   

700

243

 

17:35

At end of  o/b cusp all change to 88h58-72m12-cplr (-cprl on sc2) and MCP levels are lowered to gain of around 0.5

   

700

243

 

18:30

Sc 1,3,4 power off at M- o/b

   

700

243

14.01.05

00:00

Sc2 power cycles to single sensor mode off-76m16-cpls, LEEA MCPstill at gain of as close to 0.5 as possible at BS o/b

   

700

243

15.01.05

04:30

Sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr,
MCPs still set to gain of as close to 0.5 as possible at BS i/b

   

700

243

 

09:00

Sc 1,3,4 power on into 88h58-72m12-cplr (-cprl on sc2), MCPs set to gain of as close to 0.5 as possible at M- i/b

   

700

243

 

10:40

All change to 88m28-72m12-cplr (-cprl on sc2) and MCPs are returned to operational levels at M+ i/b

15.01.05

16:35

700

243

   

ASPOC not operational on pp244

       

15.01.05

18:25

At L=6 all power on into 88m28-72m12-cplr (-cprl on sc2)

   

701

244

 

22:40

Sc1,3 change to 88m28-72m12-cplxt-apl-64w12, sc 2,4 to 88m28-72m12-cplxy-apl-nw-aph-nw and all MCPs lowered to gain of around 0.5 for BM through o/b cusp

   

701

244

16.01.05

00:30

All change back to 88m28-72m12-cplr (-cprl on sc2) at end of BM

   

701

244

 

02:30

All change to 88h58-72m12-cplr (-cprl on sc2) at end of cusp

   

701

244

 

03:25

Sc 1,2,3 power off at M- o/b

   

701

244

 

08:50

Sc4 power cycles to single sensor mode off-76m16-cpls, LEEA MCPstill at gain of as close to 0.5 as possible at BS o/b

   

701

244

17.01.05

13:35

Sc4 HEEA powers on and instrument changes to 88h58-72m12-cplr,
MCPs still set to gain of as close to 0.5 as possible at BS i/b

   

701

244

 

18:05

Sc 1,2,3 power on into 88h58-72m12-cplr (-cprl on sc2), MCPs set to gain of as close to 0.5 as possible at M- i/b

   

701

244

 

19:05

All change to 88m28-72m12-cplr (-cprl on sc2) and MCPs are returned to operational levels at start of i/b cusp

   

701

244

 

20:50

MCP op level test performed, sensors in 68h38-68h38, performed at same time on all sc 4hrs 45 mins before sc1 L=6 

   

701

244

 

21:35

All change back to 88m28-72m12-cplr (-cprl on sc2) at end of test and all power off at L=6

18.01.05

01:40

701

244

18.01.05

03:15

At L=6 all power on into 88m28-72m12-cplr (-cprl on sc2)

   

702

244

 

11:25

All change to 88h58-72m12-cplr (-cprl on sc2) at end of cusp

   

702

244

 

12:20

Sc 1,2,3 power off at M- o/b

   

702

244

 

16:55

Sc 4 powers off 12 mins before, then sc 1,3 power on into single sensor mode off-72m12-cpxy-apl-64w12-tnl-nw and sc 2 into off-72m12-cplx-anl-nw for BM through BS, MCPs at gain of as close to 0.5 as possible

   

702

244

 

17:55

Sc4 changes to off-76m16-cpls, LEEA MCPstill at gain of as close to 0.5 as possible; sc 1,2,3 power off at end of BM

   

702

244

19.01.05

22:45

Sc4 HEEA powers on and instrument changes to 88h58-72m12-cplr,
MCPs still set to gain of as close to 0.5 as possible at BS i/b

   

702

244

20.01.05

03:10

Sc 1,2,3 power on into 88h58-72m12-cplr (-cprl on sc2), MCPs set to gain of as close to 0.5 as possible at M- i/b

   

702

244

 

04:50

All change to 88m28-72m12-cplr (-cprl on sc2) and MCPs are returned to operational levels at start of i/b cusp, and all power off at L=6

20.01.05

10:25

702

244

20.01.05

12:10

At L=6 all power on into 88m28-72m12-cplr (-cprl on sc2)

   

703

244

 

19:00

Sc1,3 change to 88m28-72m12-cplxt-apl-64w12, sc 2,4 to 88m28-72m12-cplxy-apl-nw-aph-nw and all MCPs lowered to gain of around 0.5 for BM through o/b MP

   

703

244

 

20:30

All change to 88h58-72m12-cplr (-cprl on sc2) at end of BM

   

703

244

 

21:15

Sc 1,2,3 power off at M- o/b

   

703

244

21.01.05

02:10

Sc4 power cycles to single sensor mode off-76m16-cpls, LEEA MCPstill at gain of as close to 0.5 as possible at BS o/b

   

703

244

22.01.05

07:55

Sc4 HEEA powers on and instrument changes to 88h58-72m12-cplr,
MCPs still set to gain of as close to 0.5 as possible at BS i/b

   

703

244

 

12:15

Sc 1,2,3 power on into 88h58-72m12-cplr (-cprl on sc2), MCPs set to gain of as close to 0.5 as possible at M- i/b

   

703

244

 

13:50

All change to 88m28-72m12-cplr (-cprl on sc2) and MCPs are returned to operational levels at start of i/b cusp, and all power off at L=6

22.01.05

19:55

703

244

   

ASPOC not operational on pp245

       

22.01.05

21:35

At L=6 sc 1,3 power on in 88m28-68m08-cplxs-aph-80w28, sc 2,4 in 88m28-68m08-cplxy-apl-nw-aph-nw for BM through cusp

   

704

245

 

22:05

All change to 88m28-72m12-cplr (-cprl on sc2) at end of BM

   

704

245

23.01.05

05:20

All change to 88h58-72m12-cplr (-cprl on sc2) at end of cusp

   

704

245

 

06:10

Sc 2,3,4 power off at M- o/b

   

704

245

 

10:00

Sc1 power cycles to, and sc 2,3,4 power on into, single sensor mode off-76m16-cpls (-cpsl on sc2), MCPs still at gain of as close to 0.5 as possible at B+ o/b

   

704

245

 

11:55

Sc 2,3,4 power off at B- o/b

   

704

245

24.01.05

16:10

Sc 2,3,4 power on into single sensor mode off-76m16-cpls (-cpsl on sc2), MCPs still at gain of as close to 0.5 as possible at B- i/b

   

704

245

 

17:45

Sc 2,3,4 power off; sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs still set to gain of as close to 0.5 as possible at B+ i/b

   

704

245

 

21:35

Sc 2,3,4 power on into 88h58-72m12-cplr (-cprl on sc2), MCPs set to gain of as close to 0.5 as possible at M- i/b

   

704

245

 

22:20

All change to 88m28-72m12-cplr (-cprl on sc2) and MCPs are returned to operational levels at start of i/b cusp

   

704

245

 

23:50

MCP op level test performed, sensors in 68h38-68h38, performed at same time on all sc 4hrs 45 mins before sc1 L=6 

   

704

245

25.01.05

00:35

All change back to 88m28-72m12-cplr (-cprl on sc2) at end of test and all power off at L=6

25.01.05

04:35

704

245

25.01.05

06:10

At L=6 all power on into 88m28-72m12-cplr (-cprl on sc2)

   

705

245

 

13:15

Sc1,3 change to 88m28-72m12-cplxt-apl-64w12, sc 2,4 to 88m28-72m12-cplxy-apl-nw-aph-nw and all MCPs lowered to gain of around 0.5 for BM through o/b MP

   

705

245

 

16:15

Sc1 changes to 88h58-72m12-cplr, sc 2,3,4 power off at end of BM

   

705

245

 

18:55

Sc1 power cycles to, and sc 2,3,4 power on into, single sensor mode off-76m16-cpls (-cpsl on sc2), MCPs still at gain of as close to 0.5 as possible at B+ o/b

   

705

245

 

20:40

Sc 2,3,4 power off at B- o/b

   

705

245

27.01.05

01:20

Sc 2,3,4 power on into single sensor mode off-76m16-cpls (-cpsl on sc2), MCPs still at gain of as close to 0.5 as possible at B- i/b

   

705

245

 

03:00

Sc 2,3,4 power off; sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs still set to gain of as close to 0.5 as possible at B+ i/b

   

705

245

 

06:40

Sc 2,3,4 power on into 88h58-72m12-cplr (-cprl on sc2), MCPs set to gain of as close to 0.5 as possible at M- i/b

   

705

245

 

08:00

All change to 88m28-72m12-cplr (-cprl on sc2) and MCPs are returned to operational levels at M+ i/b, and all power off at L=6

27.01.05

13:50

705

245

27.01.05

15:40

At L=6 all power on into 88m28-72m12-cplr (-cprl on sc2)

   

706

245

 

21:25

Sc1,3 change to 88m28-72m12-cplxt-apl-64w12, sc 2,4 to 88m28-72m12-cplxy-apl-nw-aph-nw for BM through o/b cusp

   

706

245

 

22:25

All change back to 88m28-72m12-cplr (-cprl on sc2) at end of BM

   

706

245

 

23:15

At end of  o/b cusp all change to 88h58-72m12-cplr (-cprl on sc2) and MCP levels are lowered to gain of around 0.5

   

706

245

28.01.05

00:10

Sc 2,3,4 power off at M- o/b

   

706

245

 

03:40

Sc1 power cycles to, and sc 2,3,4 power on into, single sensor mode off-76m16-cpls (-cpsl on sc2), MCPs still at gain of as close to 0.5 as possible at B+ o/b

   

706

245

 

05:35

Sc 2,3,4 power off at B- o/b

   

706

245

29.01.05

10:20

Sc 2,3,4 power on into single sensor mode off-76m16-cpls (-cpsl on sc2), MCPs still at gain of as close to 0.5 as possible at B- i/b

   

706

245

 

12:10

Sc 2,3,4 power off; sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs still set to gain of as close to 0.5 as possible at B+ i/b

   

706

245

 

15:50

Sc 2,3,4 power on into 88h58-72m12-cplr (-cprl on sc2), MCPs set to gain of as close to 0.5 as possible at M- i/b

   

706

245

 

16:30

All change to 88m28-72m12-cplr (-cprl on sc2) and MCPs are returned to operational levels at start of i/b cusp, and all power off at L=6

29.01.05

23:05

706

245

   

ASPOC on trial operations on sc3 in pp246

       

30.01.05

00:45

At L=6 all power on into 88m28-72m12-cplr (-cprl on sc2)

   

707

246

 

05:55

Sc1,3 change to 88m28-72m12-cplxt-apl-64w12, sc 2,4 to 88m28-72m12-cplxy-apl-nw-aph-nw for BM through o/b cusp

   

707

246

 

08:25

All change to 88h58-72m12-cplr (-cprl on sc2) and MCPs are set to gain of as close to 0.5 as possible at end of BM

   

707

246

 

09:10

Sc 1,3,4 power off at M- o/b

   

707

246

 

12:30

Sc2 power cycles to, and sc 1,3,4 power on into, single sensor mode off-76m16-cpls (-cpsl on sc2), MCPs still at gain of as close to 0.5 as possible at B+ o/b

   

707

246

 

14:20

Sc 1,3,4 power off at B- o/b

   

707

246

31.01.05

19:30

Sc 1,3,4 power on into single sensor mode off-76m16-cpls (-cpsl on sc2), MCPs still at gain of as close to 0.5 as possible at B- i/b

   

707

246

 

21:20

Sc 1,3,4 power off; sc2 HEEA powers on and instrument changes to 88h58-72m12-cprl, MCPs still set to gain of as close to 0.5 as possible at B+ i/b

   

707

246

01.02.05

00:40

Sc 1,3,4 power on into 88h58-72m12-cplr (-cprl on sc2), MCPs set to gain of as close to 0.5 as possible at M- i/b

   

707

246

 

02:10

All change to 88m28-72m12-cplr (-cprl on sc2) and MCPs are returned to operational levels at M+ i/b

   

707

246

 

03:00

MCP op level test performed, sensors in 68h38-68h38, performed at same time on all sc 4hrs 45 mins before sc1 L=6 

   

707

246

 

03:45

All change back to 88m28-72m12-cplr (-cprl on sc2) at end of test

   

707

246

 

07:45

At L=6 sc 3 powers off and on again into single sensor ops mode off-88m28-cpls, sc1 changes to 88m28-68m08-cplr, and sc 2,4 to 88m28-68m08-cpx-aph-88w60;  MCPs are set to gain of as close to 0.5 as possible, for perigee pass in conjunction with WBD ops

   

707

246


Mullard Space Science Laboratory - Holmbury St. Mary - Dorking - Surrey - RH5 6NT - Telephone: +44 (0)1483 204100 - Copyright © 1999-2009 UCL


Search by Google