Feb 2005 Sc1 Calendar sc2 sc3 sc4
Apr 2005

Power on / Start

Mode

Power off

Orbit #

Planning period

date

time

date

time

27.02.05

13:30

At end of eclipse sc2 changes back to 88m28-68m08-cpx-aph-88w60 with external sunpulse

   

719

250

27.02.05

13:54

Sc3 powers on 16 mins before L=6 into 88m28-72m12-cplr for WBD ops

   

719

250

 

13:55

Sc 1,2,4 change to 88m28-72m12-cplr (-cprl on sc2) and MCPs are returned to operational levels at L=6 o/b

   

719

250

 

14:19

Sc 1,2,4 power cycle to 88m28-72m12-cplr (-cprl on sc2) at end of WBD ops

   

719

250

 

20:35

At end of o/b cusp all change to 88h58-72m12-cplr (-cprl on sc2); MCPs at gain of as close to 0.5 as possible

   

719

250

 

21:30

Sc 1,2,3 power off at M- o/b

   

719

250

 

23:55

Sc 4 powers off 12 mins before, then sc 1,3 power on into single sensor mode off-72m12-cpxy-apl-64w12-tnl-nw and sc 2,4 into off-72m12-cplx-anl-nw for BM through BS, MCPs at gain of as close to 0.5 as possible

   

719

250

28.02.05

02:25

At end of BM sc4 changes to off-76m16-cpls; sc 1,2,3 power off 

   

719

250

01.03.05

08:30

Sc 1,2,3 power on into single sensor mode off-76m16-cpls (-cpsl on sc2), MCPs still at gain of as close to 0.5 as possible at B- i/b

   

719

250

 

10:10

Sc 1,2,3 power off; sc4 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs still set to gain of as close to 0.5 as possible at B+ i/b

   

719

250

 

13:25

Sc 1,3,4 power on into 88h58-72m12-cplr (-cprl on sc2), MCPs set to gain of as close to 0.5 as possible at M- i/b

   

719

250

 

14:20

All change to 88m28-72m12-cplr (-cprl on sc2) and MCPs are returned to operational levels at start of i/b cusp

   

719

250

 

16:44

MCP op level test performed, sensors in 68h38-68h38, performed at same time on all sc 4hrs 31 mins before sc1 L=6 

   

719

250

 

17:15

All change back to 88m28-72m12-cplr (-cprl on sc2) at end of test and all power off at L=6 i/b

01.03.05

21:15

719

250

 

22:50

At L=6 o/b sc 1,2,4 power on into 88m28-72m12-cplr (-cprl on sc2), sc3 into 88m28-68m08-cplr for ASPOC ops

   

720

250

02.03.05

04:25

At end of o/b cusp sc 1,2,4 change to 88h58-72m12-cplr (-cprl on sc2), 88h58-68m08-cplr on sc3; MCPs at gain of as close to 0.5 as possible

   

720

250

 

06:10

At end of ASPOC ops sc3 changes to 88h58-72m12-cplr

   

720

250

 

06:30

Sc 1,2,3 power off at M- o/b

   

720

250

 

08:50

Sc4 power cycles to, and sc 1,2,3 power on into, single sensor mode off-76m16-cpls (-cpsl on sc2), MCPs still at gain of as close to 0.5 as possible at B+ o/b

   

720

250

 

10:40

Sc 1,2,3 power off at B- o/b

   

720

250

03.03.05

17:35

Sc 1,2,3 power on into single sensor mode off-76m16-cpls (-cpsl on sc2), MCPs still at gain of as close to 0.5 as possible at B- i/b

   

720

250

 

19:10

Sc 1,2,3 power off; sc4 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs still set to gain of as close to 0.5 as possible at B+ i/b

   

720

250

 

22:30

Sc 1,2 power on into 88h58-72m12-cplr (-cprl on sc2), sc3 into 88h58-68m08-cplr for ASPOC ops, MCPs set to gain of as close to 0.5 as possible at M- i/b

   

720

250

04.03.05

00:00

Sc 1,2,4 change to 88m28-72m12-cplr (-cprl on sc2), sc3 to 88m28-68m08-cplr  and MCPs are returned to operational levels at M+ i/b

   

720

250

 

05:55

At L=6 sc 3 powers off; sc1 changes to 88m28-68m08-cplr, and sc 2,4 to 88m28-68m08-cpx-aph-88w60;  MCPs are set to gain of as close to 0.5 as possible, for perigee pass in conjunction with WBD ops

   

720

250

 

06:45

6 minutes before start of eclipse sc1 changes to 88m28-60m00-cplr with internal sunpulse; sc 2,4 change to 88m28-60m00-cpx-aph-88w60 with internal sunpulse

   

720

250

 

07:29

At end of eclipse sc1 changes back to 88m28-68m08-cplr with external sunpulse; sc 2,4 change to 88m28-68m08-cpx-aph-88w60 with external sunpulse

   

720

250

 

07:40

Sc3 powers on into, and sc 1,2,4 change to 88m28-72m12-cplr (-cprl on sc2) and MCPs are returned to operational levels at L=6 o/b

   

721

250

 

07:50

Sc 1,2,4 power cycle to 88m28-72m12-cplr (-cprl on sc2) at end of WBD ops

   

721

250

 

14:40

At end of o/b cusp all change to 88h58-72m12-cplr (-cprl on sc2); MCPs at gain of as close to 0.5 as possible

   

721

250

 

15:35

Sc 1,2,3 power off at M- o/b

   

721

250

 

17:50

Sc4 power cycles to, and sc 1,2,3 power on into, single sensor mode off-76m16-cpls (-cpsl on sc2), MCPs still at gain of as close to 0.5 as possible at B+ o/b

   

721

250

 

19:40

Sc 1,2,3 power off at B- o/b

   

721

250

05.03.05

09:37

Sc4 changes to, and sc 2 powers on into, off-72m12-cplx-anl-nw; sc 1,3 power on into off-72m12-cpxy-apl-64w12-tnl-nw for BM at apogee, MCPs at gain of as close to 0.5 as possible

   

721

250

 

11:37

At end of BM sc4 changes to off-76m16-cpls; sc 1,2,3 power off 

   

721

250

06.03.05

02:35

Sc 1,2,3 power on into single sensor mode off-76m16-cpls (-cpsl on sc2), MCPs still at gain of as close to 0.5 as possible at B- i/b

   

721

250

 

04:10

Sc 1,2,3 power off; sc4 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs still set to gain of as close to 0.5 as possible at B+ i/b

   

721

250

 

07:35

Sc 1,3,4 power on into 88h58-72m12-cplr (-cprl on sc2), MCPs set to gain of as close to 0.5 as possible at M- i/b

   

721

250

 

09:00

All change to 88m28-72m12-cplr (-cprl on sc2) and MCPs are returned to operational levels at M+ i/b and all power off at L=6

06.03.05

15:25

721

250

   

ASPOC not operational in pp251

       

06.03.05

17:10

At L=6 all power on into 88m28-72m12-cplr (-cprl on sc2)

   

722

251

 

23:45

At end of o/b cusp all change to 88h58-72m12-cplr (-cprl on sc2); MCPs at gain of as close to 0.5 as possible

   

722

251

07.03.05

00:35

Sc 2,3,4 power off at M- o/b

   

722

251

 

02:55

Sc1 power cycles to, and sc 2,3,4 power on into, single sensor mode off-76m16-cpls (-cpsl on sc2), MCPs still at gain of as close to 0.5 as possible at B+ o/b

   

722

251

 

04:45

Sc 2,3,4 power off at B- o/b

   

722

251

08.03.05

11:35

Sc 2,3,4 power on into single sensor mode off-76m16-cpls (-cpsl on sc2), MCPs still at gain of as close to 0.5 as possible at B- i/b

   

722

251

 

13:15

Sc 2,3,4 power off; sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs still set to gain of as close to 0.5 as possible at B+ i/b

   

722

251

 

16:35

Sc 2,3,4 power on into 88h58-72m12-cplr (-cprl on sc2), MCPs set to gain of as close to 0.5 as possible at M- i/b

   

722

251

 

17:30

All change to 88m28-72m12-cplr (-cprl on sc2) and MCPs are returned to operational levels at start of i/b cusp

   

722

251

 

19:44

MCP op level test performed, sensors in 68h38-68h38, performed at same time on all sc 4hrs 31 mins before sc1 L=6 

   

722

251

 

20:15

All change back to 88m28-72m12-cplr (-cprl on sc2) at end of test and all power off at L=6 i/b

09.03.05

00:15

722

251

09.03.05

01:55

At L=6 all power on into 88m28-72m12-cplr (-cprl on sc2)

   

723

251

 

04:50

Sc 1,3 change to 88m28-72m12-cplxt-apl-64w12, sc 2,4 to 88m28-72m12-cplxy-apl-nw-aph-nw for BM through o/b cusp

   

723

251

 

07:20

At end of BM all change back to 88m28-72m12-cplr (-cprl on sc2)

   

723

251

 

08:50

At end of o/b cusp all change to 88h58-72m12-cplr; MCPs at gain of as close to 0.5 as possible (-cprl on sc2)

   

723

251

 

09:40

Sc 2,3,4 power off at M- o/b

   

723

251

 

11:55

Sc1 power cycles to, and sc 2,3,4 power on into, single sensor mode off-76m16-cpls (-cpsl on sc2), MCPs still at gain of as close to 0.5 as possible at B+ o/b

   

723

251

 

13:45

Sc 2,3,4 power off at B- o/b

   

723

251

10.03.05

20:40

Sc 2,3,4 power on into single sensor mode off-76m16-cpls (-cpsl on sc2), MCPs still at gain of as close to 0.5 as possible at B- i/b

   

723

251

 

22:15

Sc 2,3,4 power off; sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs still set to gain of as close to 0.5 as possible at B+ i/b

   

723

251

11.03.05

01:40

Sc 2,3,4 power on into 88h58-72m12-cplr (-cprl on sc2), MCPs set to gain of as close to 0.5 as possible at M- i/b

   

723

251

 

03:10

All change to 88m28-72m12-cplr (-cprl on sc2) and MCPs are returned to operational levels at M+ i/b and all power off at L=6

11.03.05

09:20

723

251

11.03.05

11:15

At L=6 all power on into 88m28-72m12-cplr (-cprl on sc2)

   

724

251

 

17:20

Sc 1,3 change to 88m28-72m12-cplxt-apl-64w12, sc 2,4 to 88m28-72m12-cplxy-apl-nw-aph-nw; MCPs at gain of as close to 0.5 as possible for BM through o/b MP

   

724

251

 

19:20

At end of BM sc1 changes to 88h58-72m12-cplr, sc 2,3,4 power off

   

724

251

 

21:00

Sc1 power cycles to, and sc 2,3,4 power on into, single sensor mode off-76m16-cpls (-cpsl on sc2), MCPs still at gain of as close to 0.5 as possible at B+ o/b

   

724

251

 

22:50

Sc 2,3,4 power off at B- o/b

   

724

251

13.03.05

05:40

Sc 2,3,4 power on into single sensor mode off-76m16-cpls (-cpsl on sc2), MCPs still at gain of as close to 0.5 as possible at B- i/b

   

724

251

 

07:15

Sc 2,3,4 power off; sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs still set to gain of as close to 0.5 as possible at B+ i/b

   

724

251

 

10:40

Sc 2,3,4 power on into 88h58-72m12-cplr (-cprl on sc2), MCPs set to gain of as close to 0.5 as possible at M- i/b

   

724

251

 

11:35

All change to 88m28-72m12-cplr (-cprl on sc2) and MCPs are returned to operational levels at start of i/b cusp and all power off at L=6

13.03.05

18:45

724

251

   

ASPOC not operational in pp252

       

13.03.05

20:25

At L=6 all power on into 88m28-72m12-cplr (-cprl on sc2)

   

725

252

 

22:50

Sc 1,3 change to 88m28-72m12-cplxt-apl-64w12, sc 2,4 to 88m28-72m12-cplxy-apl-nw-aph-nw for BM through o/b cusp

   

725

252

14.03.05

00:50

All change back to 88m28-72m12-cplr (-cprl on sc2) at end of BM

   

725

252

 

02:20

At M+ o/b all change to 88h58-72m12-cplr; MCPs at gain of as close to 0.5 as possible (-cprl on sc2)

   

725

252

 

03:55

Sc 1,3,4 power off at M- o/b

   

725

252

 

06:00

Sc2 power cycles to, and sc 1,3,4 power on into, single sensor mode off-76m16-cpls (-cpsl on sc2), MCPs still at gain of as close to 0.5 as possible at B+ o/b

   

725

252

 

07:55

Sc 1,3,4 power off at B- o/b

   

725

252

 

09:30

Sc2 powers off 1 hour before start of manoeuvres

   

725

252

   

Manoeuvre firings

       

15.03.05

00:00

Sc2 powers on into off-76m16-cpsl, LEEA MCPs at gain of as close to 0.5 as possible 8 hours after firings end

   

725

252

 

14:35

Sc 1,3,4 power on into single sensor mode off-76m16-cpls, MCPs still at gain of as close to 0.5 as possible at B- i/b

   

725

252

 

16:15

Sc 1,3,4 power off; sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs still set to gain of as close to 0.5 as possible at B+ i/b

   

725

252

 

19:45

Sc 1,3,4 power on into 88h58-72m12-cplr (-cprl on sc2), MCPs set to gain of as close to 0.5 as possible at M- i/b

   

725

252

 

20:40

All change to 88m28-72m12-cplr (-cprl on sc2) and MCPs are returned to operational levels at start of i/b cusp

   

725

252

 

22:54

MCP op level test performed, sensors in 68h38-68h38, performed at same time on all sc 4hrs 31 mins before sc1 L=6 

   

725

252

 

23:25

All change back to 88m28-72m12-cplr (-cprl on sc2) at end of test and all power off at L=6 i/b

16.03.05

03:25

725

252

16.03.05

05:05

At L=6 all power on into 88m28-72m12-cplr (-cprl on sc2)

   

726

252

 

12:00

At end of o/b cusp all change to 88h58-72m12-cplr; MCPs at gain of as close to 0.5 as possible (-cprl on sc2)

   

726

252

 

12:50

Sc 1,3,4 power off at M- o/b

   

726

252

 

14:20

Sc 2 powers off 12 mins before, then sc 1,3 power on into single sensor mode off-72m12-cpxy-apl-64w12-tnl-nw and sc 2,4 into off-72m12-cplx-anl-nw for BM through BS, MCPs at gain of as close to 0.5 as possible

 
 

726

252

 

17:20

Sc2 changes to off-76m16-cpls; sc 1,3,4 power off at end of BM

   

726

252

17.03.05

23:35

Sc 1,3,4 power on into single sensor mode off-76m16-cpls, MCPs still at gain of as close to 0.5 as possible at B- i/b

   

726

252

18.03.05

01:10

Sc 1,3,4 power off; sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs still set to gain of as close to 0.5 as possible at B+ i/b

   

726

252

 

04:45

Sc 1,3,4 power on into 88h58-72m12-cplr (-cprl on sc2), MCPs set to gain of as close to 0.5 as possible at M- i/b

   

726

252

 

06:15

All change to 88m28-72m12-cplr (-cprl on sc2) and MCPs are returned to operational levels at M+ i/b and all power off at L=6

18.03.05

12:50

726

252

   

ASPOC not operational in pp253

       

18.03.05

14:40

At L=6 all power on into 88m28-72m12-cplr (-cprl on sc2)

   

727

253

 

21:05

At end of o/b cusp all change to 88h58-72m12-cplr; MCPs at gain of as close to 0.5 as possible (-cprl on sc2)

   

727

253

 

21:55

Sc 1,3,4 power off at M- o/b

   

727

253

19.03.05

00:10

Sc 1 powers off 12 mins before, then sc 1,3 power on into single sensor mode off-72m12-cpxy-apl-64w12-tnl-nw and sc 2,4 into off-72m12-cplx-anl-nw for BM through BS, MCPs at gain of as close to 0.5 as possible

   

727

253

 

01:40

All change to off-76m16-cpls at end of BM

   

727

253

 

02:00

Sc 2,3,4 power off at B- o/b

   

727

253

20.03.05

08:50

Sc 2,3,4 power on into single sensor mode off-76m16-cpls, MCPs still at gain of as close to 0.5 as possible at B- i/b

   

727

253

 

10:30

Sc 2,3,4 power off; sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs still set to gain of as close to 0.5 as possible at B+ i/b

   

727

253

 

13:45

Sc 2,3,4 power on into 88h58-72m12-cplr (-cprl on sc2), MCPs set to gain of as close to 0.5 as possible at M- i/b

   

727

253

 

14:40

All change to 88m28-72m12-cplr (-cprl on sc2) and MCPs are returned to operational levels at start of i/b cusp

   

727

253

 

17:19

MCP op level test performed, sensors in 68h38-68h38, performed at same time on all sc 4hrs 31 mins before sc1 L=6 

   

727

253

 

17:50

All change back to 88m28-72m12-cplr (-cprl on sc2) at end of test and all power off at L=6 i/b

20.03.05

21:50

727

253

20.03.05

23:25

At L=6 all power on into 88m28-72m12-cplr (-cprl on sc2)

   

728

253

21.03.05

04:40

At end of o/b cusp all change to 88h58-72m12-cplr; MCPs at gain of as close to 0.5 as possible (-cprl on sc2)

   

728

253

 

04:58

Sc 1,3 change to 88m28-72m12-cplxt-apl-64w12, sc 2,4 to 88m28-72m12-cplxy-apl-nw-aph-nw for BM through o/b MP

   

728

253

 

07:21

Sc 2,3,4 power off; sc1 changes to 88h58-72m12-cplr, MCPs still set to gain of as close to 0.5 as possible at end of BM

   

728

253

 

09:10

Sc 1 power cycles to, and sc 2,3,4 power on into, off-76m16-cpls, LEEA MCPs at gain of as close to 0.5 as possible at B+ o/b

   

728

253

 

11:05

Sc 2,3,4 power off at B- o/b

   

728

253

22.03.05

17:55

Sc 2,3,4 power on into single sensor mode off-76m16-cpls, MCPs still at gain of as close to 0.5 as possible at B- i/b

   

728

253

 

19:30

Sc 2,3,4 power off; sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs still set to gain of as close to 0.5 as possible at B+ i/b

   

728

253

 

23:00

Sc 2,3,4 power on into 88h58-72m12-cplr (-cprl on sc2), MCPs set to gain of as close to 0.5 as possible at M- i/b

   

728

253

23.03.05

00:10

All change to 88m28-72m12-cplr (-cprl on sc2) and MCPs are returned to operational levels at M+ i/b and all power off at L=6

23.03.05

06:40

728

253

   

Manoeuvre firings around perigee

       
 

16:37

8 hours after end of firings sc1 powers on into 88h58-72m12-cplr, MCPs at gain of as close to 0.5 as possible

   

729

253

 

18:15

Sc 1 power cycles to, and sc 2,3,4 power on into, off-76m16-cpls, LEEA MCPs at gain of as close to 0.5 as possible at B+ o/b

   

729

253

 

20:15

Sc 2,3,4 power off at B- o/b

   

729

253

24.03.05

10:22

Sc1 changes to, and  sc3 powers on into, single sensor mode off-72m12-cpxy-apl-64w12-tnl-nw and sc 2,4 into off-72m12-cplx-anl-nw for BM through BS, MCPs at gain of as close to 0.5 as possible

 
 

729

253

 

12:22

Sc1 changes back to off-76m16-cpls, sc 2,3,4 power off at end of BM

   

729

253

25.03.05

02:45

Sc 2,3,4 power on into single sensor mode off-76m16-cpls, MCPs still at gain of as close to 0.5 as possible at B- i/b

   

729

253

 

04:25

Sc 2,3,4 power off; sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs still set to gain of as close to 0.5 as possible at B+ i/b

   

729

253

 

08:05

Sc 2,3,4 power on into 88h58-72m12-cplr (-cprl on sc2), MCPs set to gain of as close to 0.5 as possible at M- i/b

   

729

253

 

09:20

All change to 88m28-72m12-cplr (-cprl on sc2) and MCPs are returned to operational levels at M+ i/b and all power off at L=6

25.03.05

16:15

729

253

   

ASPOC on trial operations on sc3 in pp254

       
   

From pp254 onwards, LEEA 4 MCP operational level raised by one to 25

       

25.03.05

17:55

At L=6 o/b sc 1,2,4 power on into 88m28-72m12-cplr (-cprl on sc2), sc3 into 88m28-68m08-cplr for ASPOC ops

   

730

254

26.03.05

00:10

At end of o/b cusp sc 1,2,4 change to 88h58-72m12-cplr (-cprl on sc2), 88h58-68m08-cplr on sc3; MCPs at gain of as close to 0.5 as possible

   

730

254

 

01:10

Sc 1,3,4 power off at M- o/b

   

730

254

 

03:25

Sc2 power cycles to, and sc 1,3,4 power on into, single sensor mode off-76m16-cpls (-cpsl on sc2), MCPs still at gain of as close to 0.5 as possible at B+ o/b

   

730

254

 

05:20

Sc 1,3,4 power off at B- o/b

   

730

254

27.03.05

11:20

Sc 1,3,4 power on into single sensor mode off-76m16-cpls (-cpsl on sc2), MCPs still at gain of as close to 0.5 as possible at B- i/b

   

730

254

 

13:00

Sc 1,3,4 power off; sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs still set to gain of as close to 0.5 as possible at B+ i/b

   

730

254

 

16:50

Sc 1,3,4 power on into 88h58-72m12-cplr, MCPs set to gain of as close to 0.5 as possible at M- i/b

   

730

254

 

17:45

Sc 1,2,4 change to 88m28-72m12-cplr (-cprl on sc2), sc3 to 88m28-68m08-cplr  and MCPs are returned to operational levels at start of i/b cusp and ASPOC ops

   

730

254

 

20:24

MCP op level test performed, sensors in 68h38-68h38, performed at same time on all sc 4hrs 31 mins before sc1 L=6 

   

730

254

 

20:55

Sc 1,2,4 change back to 88m28-72m12-cplr (-cprl on sc2), sc3 to 88m28-68m08-cplr at end of test and all power off at L=6 i/b

28.03.05

00:55

730

254

28.03.05

02:30

At L=6 all power on into 88m28-72m12-cplr (-cprl on sc2)

   

731

254

 

05:25

Sc 1,3 change to 88m28-72m12-cplxt-apl-64w12, sc 2,4 to 88m28-72m12-cplxy-apl-nw-aph-nw for BM through o/b cusp

   

731

254

 

08:25

All change back to 88m28-72m12-cplr (-cprl on sc2) at end of BM

   

731

254

 

09:25

At end of o/b cusp all change to 88h58-72m12-cplr; MCPs at gain of as close to 0.5 as possible (-cprl on sc2)

   

731

254

 

10:15

Sc 1,3,4 power off at M- o/b

   

731

254

 

12:30

Sc2 power cycles to, and sc 1,3,4 power on into, single sensor mode off-76m16-cpls (-cpsl on sc2), MCPs still at gain of as close to 0.5 as possible at B+ o/b

   

731

254

 

14:25

Sc 1,3,4 power off at B- o/b

   

731

254

29.03.05

20:15

Sc 1,3,4 power on into single sensor mode off-76m16-cpls (-cpsl on sc2), MCPs still at gain of as close to 0.5 as possible at B- i/b

   

731

254

 

21:55

Sc 1,3,4 power off; sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs still set to gain of as close to 0.5 as possible at B+ i/b

   

731

254

30.03.05

01:50

Sc 1,3,4 power on into 88h58-72m12-cplr, MCPs set to gain of as close to 0.5 as possible at M- i/b

   

731

254

 

03:20

All change to 88m28-72m12-cplr (-cprl on sc2) and MCPs are returned to operational levels at M+ i/b

   

731

254

 

10:10

Sc3 powers off; sc1 changes to 88m28-68m08-cplr, and sc 2,4 to 88m28-68m08-cpx-aph-88w60;  MCPs are set to gain of as close to 0.5 as possible, for perigee pass in conjunction with WBD ops

   

731

254

 

11:33

Sc 1,2,4 power off at end of WBD ops

   

731

254

30.03.05

12:00

At L=6 o/b sc 1,2,4 power on into 88m28-72m12-cplr (-cprl on sc2), sc3 into 88m28-68m08-cplr for ASPOC ops

   

732

254

 

16:15

Sc 1 changes to 88m28-72m12-cplxt-apl-64w12, sc3 to 88m28-68m08-cplxt-apl-64w12, sc 2,4 to 88m28-72m12-cplxy-apl-nw-aph-nw for BM through o/b cusp

   

732

254

 

17:45

Sc 1,2,4 change back to 88m28-72m12-cplr (-cprl on sc2), sc3 to 88m28-68m08-cplr at end of BM

   

732

254

 

18:30

At end of o/b cusp sc 1,2,4 change to 88h58-72m12-cplr (-cprl on sc2), 88h58-68m08-cplr on sc3; MCPs at gain of as close to 0.5 as possible

   

732

254

 

19:20

Sc 1,3,4 power off at M- o/b

   

732

254

 

21:35

Sc2 power cycles to, and sc 1,3,4 power on into, single sensor mode off-76m16-cpls (-cpsl on sc2), MCPs still at gain of as close to 0.5 as possible at B+ o/b

   

732

254

 

23:35

Sc 1,3,4 power off at B- o/b

   

732

254

01.04.05

05:05

Sc 1,3,4 power on into single sensor mode off-76m16-cpls (-cpsl on sc2), MCPs still at gain of as close to 0.5 as possible at B- i/b

   

732

254

 

06:45

Sc 1,3,4 power off; sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs still set to gain of as close to 0.5 as possible at B+ i/b

   

732

254

 

10:45

Sc 1,3,4 power on into 88h58-72m12-cplr, MCPs set to gain of as close to 0.5 as possible at M- i/b

   

732

254

 

11:40

All change to 88m28-72m12-cplr (-cprl on sc2) and MCPs are returned to operational levels at start of i/b cusp

   

732

254

 

12:40

Sc3 changes to 88m28-68m08-cplr at start of ASPOC ops and all power off at L=6

01.04.05

19:20

732

254