UCL DEPARTMENT OF SPACE & CLIMATE PHYSICS
SPACE PLASMA PHYSICS GROUP
UCL

Group research
    Research
    Missions
About us
    People
    Contact Us
    Meetings
Know our science
Opportunities
    MSSL Jobs


Jul 2012 Sc1 Calendar sc2 sc3 sc4

Date
Time
Operation
HEEA MCP level
LEEA MCP level
Orbit #
PP
2012-08-08
16:30
Power on into 88m28-76m16-cplr after long eclipse season
operational
operational
1883
636
2012-08-09
15:48
Change mode to 88m28-80m20-cplr 5 hours after apogee
operational
operational
1883
636
2012-08-10
02:00
Change mode to 88m28-72m12-cplr at L=20(i)
operational
operational
1883
636
2012-08-10
09:40
Change mode to 88m28-64m04-cplr 2 hours before L=6(i)
operational
operational
1883
636
2012-08-10
10:40
Change mode to 88m28-60m00-cplr 1 hour before L=6(i)
operational
operational
1883
636
2012-08-10
10:51
Change mode to 88m28-72m12-cplx-apl-nw for BM through AAR(i)
operational
operational
1883
636
2012-08-10
12:16
Change mode to 88m28-60m00-cplr at end of BM
operational
operational
1883
636
2012-08-10
12:42
Power off at L=3.6(i)
 
 
1883
636
2012-08-10
15:00
Power on into 88m28-60m00-cplr at L=3.6(o)
operational
operational
1884
637
2012-08-10
17:08
Change mode to 88m28-64m04-cplr one hour after L=6(o)
operational
operational
1884
637
2012-08-10
18:08
Change mode to 88m28-76m16-cplr two hours after L=6(o)
operational
operational
1884
637
2012-08-11
17:25
Power off so that extra BM can be used for GI interval
 
 
1884
637
2012-08-12
05:00
Power on into 88m28-80m20-cplr
operational
operational
1884
637
2012-08-12
06:40
Change mode to 88m28-88m28-cplr at L=20(i)
operational
operational
1884
637
2012-08-12
12:19
Change mode to 88m28-88m28-cplxs-aph-88w36 for BM in plasmasheet, special 'Retino' GI request
operational
operational
1884
637
2012-08-12
16:00
Change mode to 88m28-64m04-cplr at end of BM
operational
operational
1884
637
2012-08-12
16:54
Change mode to 88m28-60m00-cplr 1 hour before L=6(i)
operational
operational
1884
637
2012-08-12
19:05
Power off at L=3.6(i)
 
 
1884
637
2012-08-12
21:18
Power on into 88m28-60m00-cplr at L=3.6(o)
operational
operational
1885
637
2012-08-12
23:04
Change mode to 88m28-64m04-cplr one hour after L=6(o)
operational
operational
1885
637
2012-08-13
00:04
Change mode to 88m28-76m16-cplr two hours after L=6(o)
operational
operational
1885
637
2012-08-13
22:26
Power off so that extra BM can be used for GI interval
 
 
1885
637
2012-08-14
07:01
Power on into 88m28-80m20-cplr
operational
operational
1885
637
2012-08-14
18:15
Change mode to 88m28-88m28-cplr at L=20(i)
operational
operational
1885
637
2012-08-14
18:59
Change mode to 88m28-88m28-cplxs-aph-88w36 for BM in plasmasheet, special 'Retino' GI request
operational
operational
1885
637
2012-08-14
22:00
Change mode to 88m28-64m04-cplr at end of BM
operational
operational
1885
637
2012-08-14
23:10
Change mode to 88m28-60m00-cplr one hour before L=6(i)
operational
operational
1885
637
2012-08-15
02:10
Power off at L=3.6(i)
 
 
1885
637
2012-08-15
03:33
Power on into 88m28-60m00-cplr at L=3.6(o)
operational
operational
1886
637
2012-08-15
05:23
Change mode to 88m28-64m04-cplr one hour after L=6(o)
operational
operational
1886
637
2012-08-15
06:23
Change mode to 88m28-76m16-cplr two hours after L=6(o)
operational
operational
1886
637
2012-08-16
10:28
Power off so that extra BM can be used for GI interval
 
 
1886
637
2012-08-16
19:03
Power on into 88m28-80m20-cplr
operational
operational
1886
637
2012-08-16
22:35
Change mode to 88m28-88m28-cplr at L=20(i)
operational
operational
1886
637
2012-08-17
01:19
Change mode to 88m28-88m28-cplxs-aph-88w36 for BM in plasmasheet, special 'Retino' GI request
operational
operational
1886
637
2012-08-17
04:20
Change mode to 88m28-64m04-cplr at end of BM
operational
operational
1886
637
2012-08-17
05:19
Change mode to 88m28-60m00-cplr one hour before L=6(i)
operational
operational
1886
637
2012-08-17
07:37
Power off at L=3.6(i)
 
 
1886
637
2012-08-17
09:50
Power on into 88m28-60m00-cplr at L=3.6(o)
operational
operational
1887
638
2012-08-17
12:00
Change mode to 88m28-64m04-cplr one hour after L=6(o)
operational
operational
1887
638
2012-08-17
13:00
Change mode to 88m28-76m16-cplr two hours after L=6(o)
operational
operational
1887
638
2012-08-18
12:16
Power off so that extra BM can be used for GI interval
 
 
1887
638
2012-08-18
15:51
Power on into 88m28-80m20-cplr
operational
operational
1887
638
2012-08-19
02:25
Change mode to 88m28-88m28-cplr at L=20(i)
operational
operational
1887
638
2012-08-19
08:39
Change mode to 88m28-88m28-cplxs-aph-88w36 for BM in plasmasheet, special 'Retino' GI request
operational
operational
1887
638
2012-08-19
10:40
Change mode to 88m28-64m04-cplr at end of BM
operational
operational
1887
638
2012-08-19
11:49
Change mode to 88m28-60m00-cplr one hour before L=6(i)
operational
operational
1887
638
2012-08-19
13:50
Power off at L=3.6(i)
 
 
1887
638
2012-08-19
16:10
Power on into 88m28-60m00-cplr at L=3.6(o)
operational
operational
1888
638
2012-08-19
18:13
Change mode to 88m28-64m04-cplr one hour after L=6(o)
operational
operational
1888
638
2012-08-19
19:13
Change mode to 88m28-76m16-cplr two hours after L=6(o)
operational
operational
1888
638
2012-08-20
23:13
Change mode to 88m28-80m20-cplr five hours after apogee
operational
operational
1888
638
2012-08-21
01:09
Change mode to 46h16-60m00-cplr for special WBD interference test. Correlator set at channel 5
operational
operational
1888
638
2012-08-21
01:25
Change mode to 88m28-80m20-cplr at end of WBD test
operational
operational
1888
638
2012-08-21
08:40
Change mode to 88m28-72m12-cplr at L=20(i)
operational
operational
1888
638
2012-08-21
13:29
MCP test, mode 68h38-68h38-cnr
 
 
1888
638
2012-08-21
14:00
Change mode to 88m28-72m12-cplr at end of test
operational
operational
1888
638
2012-08-21
17:02
Change mode to 88m28-64m04-cplr two hours before L=6(i)
operational
operational
1888
638
2012-08-21
18:02
Change mode to 88m28-60m00-cplr one hour before L=6(i)
operational
operational
1888
638
2012-08-21
20:23
Change mode to 88m28-72m12-cplx-apl-nw for BM through AAR(i)
operational
operational
1888
638
2012-08-21
21:00
Change mode to 88m28-60m00-cplr at end of BM
operational
operational
1888
638
2012-08-21
21:22
Power off at L=3.6(i)
 
 
1888
638
2012-08-21
22:27
Power on into 88m28-60m00-cplr at L=3.6(o)
operational
operational
1889
638
2012-08-22
00:10
Change mode to 88m28-64m04-cplr one hour after L=6(o)
operational
operational
1889
638
2012-08-22
01:10
Change mode to 88m28-76m16-cplr two hours after L=6(o)
operational
operational
1889
638
2012-08-23
05:30
Change mode to 88m28-80m20-cplr five hours after apogee
operational
operational
1889
638
2012-08-23
18:55
Change mode to 88m28-72m12-cplr at L=20(i)
operational
operational
1889
638
2012-08-23
23:14
Change mode to 88m28-64m04-cplr two hours before L=6(i)
operational
operational
1889
638
2012-08-23
23:59
Change mode to 88m28-72m12-cplx-apl-nw for BM through kinetic Alfven waves
operational
operational
1889
638
2012-08-24
01:20
Change mode to 88m28-60m00-cplr at end of BM
operational
operational
1889
638
2012-08-24
03:05
Power off at L=3.6(i)
 
 
1889
638
2012-08-24
04:43
Power on into 88m28-60m00-cplr at L=3.6(o)
operational
operational
1890
639
2012-08-24
06:38
Change mode to 88m28-64m04-cplr one hour after L=6(o)
operational
operational
1890
639
2012-08-24
07:38
Change mode to 88m28-76m16-cplr two hours after L=6(o)
operational
operational
1890
639
2012-08-25
11:47
Change mode to 88m28-80m20-cplr five hours after apogee
operational
operational
1890
639
2012-08-25
23:00
MCP test, mode 68h38-68h38-cnr
 
 
1890
639
2012-08-25
23:31
Change mode to 88m28-72m12-cplr at L=20(i)
operational
operational
1890
639
2012-08-26
05:30
Change mode to 88m28-64m04-cplr two hours before L=6(i)
operational
operational
1890
639
2012-08-26
06:19
Change mode to 88m28-72m12-cplx-apl-nw for BM through kinetic Alfven waves
operational
operational
1890
639
2012-08-26
07:40
Change mode to 88m28-60m00-cplr at end of BM
operational
operational
1890
639
2012-08-26
08:42
Power off at L=3.6(i)
 
 
1890
639
2012-08-26
11:00
Power on into 88m28-60m00-cplr at L=3.6(o)
operational
operational
1891
639
2012-08-26
13:10
Change mode to 88m28-64m04-cplr one hour after L=6(o)
operational
operational
1891
639
2012-08-26
14:10
Change mode to 88m28-76m16-cplr two hours after L=6(o)
operational
operational
1891
639
2012-08-27
18:02
Change mode to 88m28-80m20-cplr five hours after apogee
operational
operational
1891
639
2012-08-28
02:51
Change mode to 88m28-72m12-cplr at L=20(i)
operational
operational
1891
639
2012-08-28
11:55
Change mode to 88m28-64m04-cplr two hours before L=6(i)
operational
operational
1891
639
2012-08-28
13:00
Change mode to 88m28-72m12-cplx-apl-nw for BM through kinetic Alfven waves
operational
operational
1891
639
2012-08-28
14:21
Change mode to 88m28-60m00-cplr at end of BM
operational
operational
1891
639
2012-08-28
15:00
Power off at L=3.6(i)
 
 
1891
639
2012-08-28
17:18
Power on into 88m28-60m00-cplr at L=3.6(o)
operational
operational
1892
639
2012-08-28
19:13
Change mode to 88m28-64m04-cplr one hour after L=6(o)
operational
operational
1892
639
2012-08-28
20:13
Change mode to 88m28-76m16-cplr two hours after L=6(o)
operational
operational
1892
639
2012-08-30
00:19
Change mode to 88m28-80m20-cplr five hours after apogee
operational
operational
1892
639
2012-08-30
13:46
Change mode to 88m28-72m12-cplr at L=20(i)
operational
operational
1892
639
2012-08-30
18:04
Change mode to 88m28-64m04-cplr two hours before L=6(i)
operational
operational
1892
639
2012-08-30
18:59
Change mode to 88m28-72m12-cplx-apl-nw for BM through kinetic Alfven waves
operational
operational
1892
639
2012-08-30
20:20
Change mode to 88m28-60m00-cplr at end of BM
operational
operational
1892
639
2012-08-30
22:23
Power off at L=3.6(i)
 
 
1892
639
2012-08-30
23:33
Power on into 88m28-60m00-cplr at L=3.6(o)
operational
operational
1893
639
2012-08-31
01:17
Change mode to 88m28-64m04-cplr one hour after L=6(o)
operational
operational
1893
639
2012-08-31
02:17
Change mode to 88m28-76m16-cplr two hours after L=6(o)
operational
operational
1893
639


Mullard Space Science Laboratory - Holmbury St. Mary - Dorking - Surrey - RH5 6NT - Telephone: +44 (0)1483 204100 - Copyright © 1999-2009 UCL


Search by Google