Aug 2004 Sc1 Calendar sc2 sc3 sc4

Power on / Start

Mode

Power off

Orbit #

Planning period

date

time

date

time

30.08.04

19:25

At L=6 all power on into 88m28-72m12-cplr (-cprl on sc2)

   

643

224

 

21:25

2 hours after L=6 all change to 88m28-66h36-cplr (-cprl on sc2)

   

643

224

31.08.04

19:55

Sc 1,3 change to 88m28-76m16-cplxs-aph-80w28, sc 2,4 to 88m28-76m16-cplxy-apl-nw-aph-nw for BM through plasmasheet

   

643

224

 

22:55

All change back to 88m28-66h36-cplr (-cprl on sc2) at end of BM  

   

643

224

02.09.04

01:20

2 hours before L=6 all change to 88m28-72m12-cplr (-cprl on sc2) and all power off at L=6

02.09.04

03:20

643

224

02.09.04

05:05

Sc1,3 power on in 88m28-68m08-cplxt-apl-60w08, sc 2,4 into 88m28-68m08-cplxy-apl-nw-aph-nw for BM through auroral zone and mid-alt cusp with ASPOC

   

644

224

 

06:55

Sc 1,2,4 change to 88m28-66h36-cplr (-cprl on sc2), sc3 to 88m28-68m08-cplr at end of BM

   

644

224

 

12:20

Sc 3 changes to 88m28-66h36-cplr at end of ASPOC ops

   

644

224

 

22:36

Sc 3 changes to 88m28-72m12-cplr for ASPOC ops

   

644

224

03.09.04

05:35

Sc 3 changes back to 88m28-66h36-cplr at end of ASPOC ops

   

644

224

04.09.04

05:25

Sc 3 changes to 88m28-68m08-cplr for ASPOC ops

   

644

224

 

10:10

2 hours before L=6 sc 1,2,4 change to 88m28-72m12-cplr (-cprl on sc2) and all power off at L=6

04.09.04

12:10

644

224

   

From pp225 onwards, MCP levels raised as follows: 
H2: 26,  L2: 29

H4: 26,  L4: 24

Sc3 levels still H3: 27,  L3: 28

       
   

Also from now on, SPOS changed on all sc back to 1200

       

04.09.04

13:45

At L=6 all power on into 88m28-72m12-cplr (-cprl on sc2)

   

645

225

 

15:45

2 hours after L=6 all change to 88m28-66h36-cplr (-cprl on sc2)

   

645

225

05.09.04

03:55

Sc 1,3 change to 88m28-76m16-cplxs-aph-80w28, sc 2,4 to 88m28-76m16-cplxy-apl-nw-aph-nw for BM through plasmasheet

   

645

225

 

06:55

All change back to 88m28-66h36-cplr (-cprl on sc2) at end of BM and all power off for long eclipse at end of AI

05.09.04

08:27

645

225

06.09.04

03:26

All power on into 88m28-66h36-cplr (-cprl on sc2) after eclipse

   

645

225

 

16:30

MCP op level test performed, sensors in 68h38-68h38, performed at same time on all sc 2hrs 40 mins before sc1 L=6

   

645

225

 

17:10

All change to 88m28-66h36-cplr (-cprl on sc2) at end of test Note H3 MCP is set to 29 at end of test

   

645

225

 

18:45

Sc1,3 change to 88m28-68m08-cplxt-apl-60w08, sc 2,4 to 88m28-68m08-cplxy-apl-nw-aph-nw for BM through inbound mid-alt cusp

   

645

225

 

20:15

All change to 88m28-72m12-cplr (-cprl on sc2) at end of BM

   

645

225

 

21:10

At L=6 sc3 powers off; sc1 changes to 88m28-68m08-cplr; sc 2,4 change to 88m28-68m08-cpx-aph-88w60 and MCP levels are dropped by 2 for perigee pass with WBD ops

   

645

225

06.09.04

22:00

Sc 1,2,4 power off at end of WBD ops

   

645

225

06.09.04

23:00

At L=6 sc 1,2,4 power on into 88m28-72m12-cplr (-cprl on sc2), sc3 into 88m28-68m08-cplr for ASPOC ops

   

646

225

07.09.04

01:00

2 hours after L=6 sc 1,2,4 change to 88m28-66h36-cplr (-cprl on sc2)

   

646

225

 

06:20

Sc 3 changes to 88m28-66h36-cplr at end of ASPOC ops and all power off for long eclipse at end of AI

07.09.04

16:48

646

225

08.09.04

12:30

All power on into 88m28-66h36-cplr (-cprl on sc2) after eclipse

   

646

225

 

23:50

Sc 3 changes to 88m28-68m08-cplr for ASPOC ops

   

646

225

09.09.04

04:35

2 hours before L=6 sc 1,2,4 change to 88m28-72m12-cplr (-cprl on sc2) and all power off at L=6

09.09.04

06:35

646

225

09.09.04

08:15

At L=6 all power on into 88m28-72m12-cplr (-cprl on sc2)

   

647

225

 

10:15

2 hours after L=6 all change to 88m28-66h36-cplr (-cprl on sc2)

   

647

225

09.09.04

15:31

Further commissioning of sc4 MCPs

09.09.04
17:41
   
 

21:43

Sc 1,3 change to 88m28-76m16-cplxs-aph-80w28, sc 2,4 to 88m28-76m16-cplxy-apl-nw-aph-nw for BM through plasmasheet

   

647

225

10.09.04

01:10

All change back to 88m28-66h36-cplr (-cprl on sc2) at end of BM and all power off for long eclipse at end of AI

10.09.04

01:35

647

225

10.09.04

20:52

All power on into 88m28-66h36-cplr (-cprl on sc2) after eclipse

   

647

225

11.09.04

13:10

2 hours before L=6 all change to 88m28-72m12-cplr (-cprl on sc2) and all power off at L=6

11.09.04

15:15

647

225

11.09.04

16:54

At start of pior, just after L=6 for sc 1,4, sc 1,2,4 power on into 88m28-72m12-cplr (-cprl on sc2); sc3 into 88m28-68m08-cplr for ASPOC ops

   

648

226

 

18:45

2 hours after L=6 sc 1,2,4 change to 88m28-66h36-cplr (-cprl on sc2)

   

648

226

12.09.04

00:05

Sc 3 changes to 88m28-66h36-cplr at end of ASPOC ops

   

648

226

 

18:25

Sc 3 changes to 88m28-72m12-cplr for ASPOC ops

   

648

226

 

12:25

Sc 1 changes to 88m28-76m16-cplxs-aph-80w28, sc 2,4 to 88m28-76m16-cplxy-apl-nw-aph-nw and sc3 to 88m28-72m12-cplxs-aph-80w28 for BM in plasmasheet with ASPOC ops

   

648

226

 

15:25

All change back to 88m28-66h36-cplr (-cprl on sc2) at end of BM and ASPOC ops

   

648

226

13.09.04

18:00

Sc 3 changes to 88m28-68m08-cplr for ASPOC ops

   

648

226

 

20:00

MCP op level test performed, sensors in 68h38-68h38, performed at same time on all sc 4hrs 40 mins before sc1 L=6 

   

648

226

 

20:40

Sc 1,2,4 change back to 88m28-66h36-cplr (-cprl on sc2), sc3 to 88m28-68m08-cplr  at end of test  Note H3 MCP is set to 29 at end of test

   

648

226

 

21:20

At start of mid-altitude cusp sc 1,2,4 change to 88m28-72m12-cplr (-cprl on sc2) and all power off at L=6  

14.09.04

00:40

648

226

14.09.04

02:30

Sc1,3 power on in 88m28-68m08-cplxt-apl-60w08, sc 2,4 into 88m28-68m08-cplxy-apl-nw-aph-nw for BM through auroral zone and mid-altitude cusp

   

649

226

 

04:20

All change to 88m28-66h36-cplr (-cprl on sc2) at end of BM

   

649

226

16.09.04

07:20

At start of mid-altitude cusp all change to 88m28-72m12-cplr (-cprl on sc2)

   

649

226

 

09:40

At L=6, sc 3 powers off; sc 1,4 change to 88m28-88m28-cf, sc2 to 88m28-88m28-cpf and MCP levels dropped by 2 levels on all sensors, for penetrating radiation study

   

649

226

 

11:15

At L=6, sc 1,2,4 change to 88m28-72m12-cplr (-cprl on sc2) and MCP levels are raised back to operational, sc3 powers on into 88m28-68m08-cplr for ASPOC ops

   

650

226

 

13:20

2 hours after L=6, sc 1,2,4 power cycle, powering on into 88m28-66h36-cplr (-cprl on sc2)

   

650

226

 

18:35

Sc 3 changes to 88m28-66h36-cplr at end of ASPOC ops

   

650

226

 

21:20

Sc 1,3 change to 88m28-76m16-cplxs-aph-80w28, sc 2,4 to 88m28-76m16-cplxy-apl-nw-aph-nw for BM in plasmasheet

   

650

226

17.09.04

00:20

All change back to 88m28-66h36-cplr (-cprl on sc2) at end of BM

   

650

226

 

03:30

Sc3 changes to 88m28-72m12-cplr when ASPOC powers on

   

650

226

 

10:30

Sc3 changes back to 88m28-66h36-cplr when ASPOC powers off

   

650

226

18.09.04

11:45

Sc 3 changes to 88m28-68m08-cplr when ASPOC powers on

   

650

226

 

15:05

At start of mid-altitude cusp sc 1,2,4 change to 88m28-72m12-cplr (-cprl on sc2)

   

650

226

 

18:30

At L=6 sc 1,3 power off; sc 2,4 change to 88m28-68m08-cpx-aph-88w60 and MCP levels dropped by 2 levels on all sensors, for perigee pass in conjunction with WBD ops

   

650

226

   

Sc3 HEEA MCP raised to 28 for pp 227

       

18.09.04

20:15

At L=6 sc 1,3 power on into, and sc 2,4 change to 88m28-72m12-cplr (-cprl on sc2), sc 2,4 MCP levels also put back up to operational

   

651

227

 

22:15

2 hours after L=6, sc 2,4 power cycle, and all change to 88m28-66h36-cplr (-cprl on sc2)

   

651

227

19.09.04

19:30

Sc 1,3 change to 88m28-76m16-cplxs-aph-80w28, sc 2,4 to 88m28-76m16-cplxy-apl-nw-aph-nw for BM in plasmasheet

   

651

227

 

20:30

All change back to 88m28-66h36-cplr (-cprl on sc2) at end of BM

   

651

227

20.09.04

23:20

MCP op level test performed, sensors in 68h38-68h38, performed at same time on all sc 4hrs 40 mins before sc1 L=6 

   

651

227

21.09.04

00:00

All change back to 88m28-66h36-cplr (-cprl on sc2) at end of test

   

651

227

 

01:40

At start of mid-altitude cusp all change to 88m28-72m12-cplr (-cprl on sc2) and all power off at L=6  

21.09.04

04:00

651

227

21.09.04

05:40

Sc1,3 power on in 88m28-68m08-cplxt-apl-60w08, sc 2,4 into 88m28-68m08-cplxy-apl-nw-aph-nw for BM through auroral zone and mid-alt cusp with ASPOC

   

652

227

 

07:35

Sc 1,2,4 change to 88m28-66h36-cplr (-cprl on sc2), sc3 to 88m28-68m08-cplr at end of BM

   

652

227

 

13:00

Sc 3 changes to 88m28-66h36-cplr at end of ASPOC ops

   

652

227

 

22:10

Sc 3 changes to 88m28-72m12-cplr for ASPOC ops

   

652

227

22.09.04

05:10

Sc 3 changes back to 88m28-66h36-cplr at end of ASPOC ops

   

652

227

23.09.04

05:55

Sc 3 changes to 88m28-68m08-cplr for ASPOC ops

   

652

227

 

09:50

2 hours before L=6 sc 1,2,4 change to 88m28-72m12-cplr (-cprl on sc2) and all power off at L=6

23.09.04

12:40

652

227

23.09.04

14:15

At L=6 sc 1,4 power on into 88m28-72m12-cplr; sc3 powers on into 88m28-68m08-cplxt-apl-60w08 and sc2 powers on into 88m28-68m08-cplxy-apl-nw-aph-nw for BM through cusp

   

653

227

 

14:35

Sc1 changes to 88m28-68m08-cplxt-apl-60w08, sc4 to 88m28-68m08-cplxy-apl-nw-aph-nw for BM

   

653

227

 

16:25

All change to 88m28-66h36-cplr (-cprl on sc2) at end of BM

   

653

227

25.09.04

18:30

At start of mid-altitude cusp all change to 88m28-72m12-cplr (-cprl on sc2) and all power off at L=6  

25.09.04

22:00

653

227

   

Sc3 HEEA MCP raised to 29 from pior 228 onwards  ASPOC off for pp 228

       

25.09.04

23:50

At L=6 all power on into 88m28-72m12-cplr (-cprl on sc2)

   

654

228

26.09.04

01:50

2 hours after L=6 all change to 88m28-66h36-cplr (-cprl on sc2)

   

654

228

 

21:30

Sc 1,3 change to 88m28-76m16-cplxs-aph-80w28, sc 2,4 to 88m28-76m16-cplxy-apl-nw-aph-nw for BM through plasmasheet

   

654

228

27.09.04

00:37

All change back to 88m28-66h36-cplr (-cprl on sc2) at end of BM

   

654

228

28.09.04

02:35

MCP op level test performed, sensors in 68h38-68h38, performed at same time on all sc 4hrs 40 mins before sc1 L=6 

   

654

228

 

03:15

All change back to 88m28-66h36-cplr (-cprl on sc2) at end of test

   

654

228

 

05:00

At start of mid-altitude cusp all change to 88m28-72m12-cplr (-cprl on sc2) and all power off at L=6  

28.09.04

07:15

654

228

28.09.04

08:50

Sc1,3 power on in 88m28-68m08-cplxt-apl-60w08, sc 2,4 into 88m28-68m08-cplxy-apl-nw-aph-nw for BM through auroral zone and mid-alt cusp

   

655

228

 

10:05

All change to 88m28-72m12-cplr (-cprl on sc2) at end of BM

   

655

228

 

10:50

2 hours after L=6 all change to 88m28-66h36-cplr (-cprl on sc2)

   

655

228

30.09.04

12:40

At start of mid-altitude cusp all change to 88m28-72m12-cplr (-cprl on sc2) and all power off at L=6  

30.09.04

15:55

655

228

30.09.04

17:40

At L=6 all power on into 88m28-72m12-cplr (-cprl on sc2)

   

656

228

 

19:35

2 hours after L=6 all change to 88m28-66h36-cplr (-cprl on sc2)

   

656

228

 

11:17

Sc 1,3 change to 88m28-76m16-cplxs-aph-80w28, sc 2,4 to 88m28-76m16-cplxy-apl-nw-aph-nw for BM through plasmasheet

   

656

228

 

12:47

All change back to 88m28-66h36-cplr (-cprl on sc2) at end of BM

   

656

228

02.10.04

22:40

At start of mid-altitude cusp all change to 88m28-72m12-cplr (-cprl on sc2) and all power off at L=6  

03.10.04

01:30

656

228