EIS Project Documents

(For critical issues please contact the responsible engineer or scientist for latest information)
Management : Management , Meetings
Instrument : Science , Prototype Model , MTM/TTM , FM , Product Assurance
System , Structure , Clamshell , Optics , Filters , Slit Assembly , Shutter
Camera , Radiator , QCM , MHC , Electronics , Harness , ICU , ICU Software
Test & EGSE : AIV , EGSE
Ground Segment & Operations : Ground Segment , Operations
Interface Documentation : EIS ICD , EIS General Assembly, Mounting Template , Connector Panel , ICU Interface Drawing

Archive documents (old)

Help Facilities
You can search the document lists by text string
Not sure about the document naming scheme?, or maybe you don't recognise some of the acronyms used here?
To view PDF files, a viewer such as Adobe Acrobat Reader (version 4 or higher) is required. Download: Acrobat.

Back to Solar-B homepage