Swift Simulation Summaries
|
Ops
|
Description |
Duration |
I&T Activity |
Resources |
Tool/Configuration |
||||||
|
GSFC MOC |
PSU MOC |
GSFC I&T |
KSC |
S/C Bus |
BAT |
NFIs |
HB |
||||
|
Pre-1 |
Various Instrument and Spacecraft Bus Tests |
|
General Testing |
|
|
X |
|
X |
|
X |
X |
|
1 and 2 |
Standard Test Set:
|
~6 hours |
Observatory Integrated Systems Test (IST) Dry Run |
X |
|
X |
|
X |
|
X |
|
|
3 |
L&EO Dry Run to prepare for 1st L&EO Simulation
|
12 hours |
|
X |
|
X |
|
|
|
|
X |
|
4 and 6 |
Solar Array Deployment Tests
One of the few opportunities for FOT to see the realistic telemetry from this activities before launch
|
~2 hours |
Solar Array 1st Motion Deploy |
X |
|
X |
|
X |
X |
X |
|
|
5 |
Repeat OE#1
|
~6 hours |
Observatory IST |
X |
|
X |
|
X |
X |
X |
|
|
7 |
NFI Door Deployments
One of the few opportunities for FOT to see the realistic telemetry from these activities before launch
|
~4 hours |
NFI Deployment Tests |
X |
|
X |
|
X |
X |
X |
|
|
8 |
Repeat OE#4
|
~2 hours |
Solar Array 1st Motion Deploy |
|
X* |
|
X |
X |
X |
X |
|
|
9 |
Repeat OE#1
|
~6 hours |
Observatory IST |
|
X* |
|
X |
X |
X |
X |
|
* Telemetry Monitoring Only
|
L&EO
|
Description |
Duration |
I&T Activity |
Personnel |
Resource(s) |
Tool/Configuration |
||||||
|
GSFC MOC |
PSU MOC |
GSFC I&T |
KSC |
S/C Bus |
BAT |
NFIs |
HB |
|||||
|
1a_1 |
Exercise 1st 2-3 days of L&EO Timeline/Script (compressed)
|
2 days, |
Pre-BAT Delivery |
|
X |
|
X |
|
X |
|
|
|
|
1a_2 |
Exercise ACS Slew Testing performed during L&EO (compressed)
|
1 day, |
Pre-BAT Delivery |
|
X |
|
X |
|
X |
|
|
|
|
1b_1 |
L&EO NFI Activation Sequence (compressed)
|
3 days, |
Pre-BAT Delivery |
|
X |
|
X |
|
X |
|
X |
|
|
1b_2 |
L&EO FoM/ACS Interface Testing
|
1 – 2 days, |
Pre-BAT Delivery |
|
X |
|
X |
|
X |
|
X |
|
|
1b_3 |
L&EO Timeline/Script Sequence (compressed)
Nominal Slews requiring SADA motion |
3 transitions, |
Thermal Vacuum
|
|
X |
|
X |
|
X |
X |
X |
|
|
1c |
Final Full L&EO Simulation before Launch Site
|
2 days, |
L&EO Rehearsal |
|
|
X |
X |
|
X |
X |
X |
|
|
1d |
Final Full L&EO Simulation
|
2 days, |
Observatory ETE |
|
|
X |
|
X |
X |
X? |
X? |
|
|
Post-L&EO Ops Sims |
Description |
Duration |
I&T Activity |
Personnel |
Resource(s) |
Tool/Configuration |
|||||
|
GSFC MOC |
PSU MOC |
GSFC I&T |
S/C Bus |
BAT |
NFIs |
HB |
|||||
|
2a |
Enhanced “Day-in-the-Life” Simulation
|
2 days, |
Observatory
Operations Test (formerly, Observatory Science |
|
X? |
X? |
X |
X |
X |
X |
|
|
2b |
“Day-in-the-Life” Test
|
~12 hours |
Thermal Balance |
|
X |
|
X |
X |
X |
X |
|
|
2c |
Paper Simulation of Daily
Operations
|
2 days, |
|
|
|
X |
|
|
|
|
|
|
Contingency Sims |
Description |
Duration |
I&T Activity |
Personnel |
Resources |
Tool/Configuration |
||||||
|
GSFC MOC |
PSU MOC |
GSFC I&T |
KSC |
S/C Bus |
BAT |
NFI |
HB |
|||||
|
3a_1 |
Special Operations Simulation
|
3 days, |
SCIF #4A |
|
|
X |
X |
|
X |
|
X |
|
|
3a_2 |
Special Operations Simulation
|
1.5 days, |
SCIF #4B |
|
|
X |
X |
|
X |
X |
X |
|
|
3a_3 |
Special Operations Simulation
|
2.5 days, |
SCIF #4C |
|
|
X |
|
|
|
|
|
X |
|
3b |
L&EO
Contingency Sim –
|
~12 hours |
|
|
|
X |
X |
|
|
|
|
X |
|
3c |
L&EO Contingency Sim
|
1 day, |
L&EO Contingency Rehearsal |
|
|
X |
X |
|
X |
X |
X |
|
|
Ops Readiness Test |
Description |
Duration |
Resources |
Tool |
||||||
|
PSU MOC |
KSC |
Malindi |
USN |
TDRSS |
Observatory |
PSS |
Tape |
|||
|
1 and 2 |
Nominal Pass Ops
|
~4-8 hours |
X |
|
X |
|
|
|
X |
|
|
3 and 4 |
Contingency Pass Ops
|
~4-8 hours |
X |
|
X |
|
|
|
X |
|
|
5 and 6 |
Nominal Pass Ops
|
~4-8 hours |
X |
|
|
X |
|
|
|
X |
|
7 and 8 |
Contingency Pass Ops
|
~4-8 hours |
X |
|
|
X |
|
|
|
X |
|
9 (TBD) |
Nominal Pass Ops
|
~4-8 hours |
X |
X |
|
|
X |
X |
|
|
NOTE: ALL Sim activities must use FLIGHT OPERATIONS PROCEDURES/STOL PROCS unless waived on a case-by-case basis –I&T procedures used for initial sim configuration only.
Page