next up previous contents
Next: Pre-apogee Gap Procedure Up: Nominal Procedures Previous: Procedure for the Preparation

Procedure for Activation After Eclipse

OM will be switched off during eclipse. The MCP HV requires a stabilization period of several hours. For the sake of observation efficiency it is desirable to switch on OM and command it into intermediate safe state before perigee passage for the case that eclipse occurs before perigee and that there is s/c contact before perigee. This approach would require different post eclipse procedures depending on the orbital phase eclipse occurs, treating the case where there is a s/c contact after eclipse and before perigee differently to all other cases. In the latter cases the full procedure would be invoked after perigee, otherwise only the transition to intermediate safe mode is commanded and normal activation after perigee will occur.

1.
Perform ``Nominal Switch On'' (see Section 8.1). The ICU is in ``initial mode''.

2.
Wait until ready for ``Post Perigee Procedure''.

3.
Perform ``Post Perigee Procedure'' (see Section 8.10). The ICU is in ``idle'' mode.

Kate will investigate the possibililty of different OM operation for eclipse with s/c contact before perigee.


next up previous contents
Next: Pre-apogee Gap Procedure Up: Nominal Procedures Previous: Procedure for the Preparation

1998-12-23