UCL DEPARTMENT OF SPACE & CLIMATE PHYSICS
SPACE PLASMA PHYSICS GROUP
UCL

Group research
    Research
    Missions
About us
    People
    Contact Us
    Meetings
Know our science
Opportunities
    MSSL Jobs


Mar 2006 Sc1 Calendar sc2 sc3 sc4

Power on / Start
Mode
Power off
Orbit #
Planning period
date
time
date
time
30.03.06
08:05
At L=6 o/b all power on into 88m28-72m12-cplr    
885
306
 
14:55
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level    
885
306
 
16:50
At M- o/b + 1 hour sc 2,3,4 power off    
885
306
 
17:55
At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
885
306
01.04.06
00:40
At start of BM sc 1,3 change to off-72m12-cpxy-apl-64w12-tnl-nw; sc2,4 to off-72m12-cplx-anl-nw, LEEA MCP lowered by one level for BM in i/b wind    
885
306
 
03:40
At end of BM sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off    
885
306
 
06:55
At M- i/b sc2,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level    
885
306
 
08:25
At M+ i/b all change to 88m28-72m12-cplr and MCPs are raised back up to operational and all power off at L=6 i/b
01.04.06
15:50
885
306
01.04.06
17:30
At L=6 o/b all power on into 88m28-72m12-cplr    
886
307
 
23:20
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level    
886
307
02.04.06
01:55
At M- o/b + 1 hour sc 1,3,4 power off    
886
307
 
03:00
At B+ o/b sc2 power cycles to, and sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
886
307
 
05:00
At B- o/b sc 1,3,4 power off    
886
307
 
21:45
IEL to FGM is closed for 14 mins while they perform calibration    
886
307
03.04.06
03:40
At B- i/b sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
886
307
 
11:45
At B+ i/b sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 1,3,4 power off    
886
307
 
15:55
At M- i/b sc1,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level    
886
307
 
17:25
At M+ i/b all change to 88m28-72m12-cplr and MCPs are raised back up to operational    
886
307
 
20:59
MCP op level test performed, sensors in 68h38-68h38, 3hr 31 mins before L=6 i/b - sc1,2,3 at 20:59; sc4 at 22:09    
886
307
 
21:30
At end of test all change to 88m28-72m12-cplr (-cprl on sc2) and all power off at L=6 i/b
04.04.06
00:30
886
307
04.04.06
02:04
At L=6 o/b all power on into 88m28-72m12-cplr    
887
307
 
06:30
At end of cusp sc 3,4 change to 88h58-72m12-cplr and MCPs are lowered by one level    
887
307
 
08:25
At start of BM Sc1,3 change to 88h58-72m12-cplxt-apl-64w12; sc2,4 to 88h58-72m12-cplxy-apl-nw-aph-nw, and sc 1,2 MCPs are lowered by one level for BM through o/b MP    
887
307
 
10:25
At end of BM all change back to 88h58-72m12-cplr    
887
307
 
11:00
At M- o/b + 1 hour sc 1,3,4 power off    
887
307
 
12:05
At B+ o/b sc2 power cycles to, and sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
887
307
 
14:05
At B- o/b sc 1,3,4 power off    
887
307
05.04.06
18:55
At B- i/b sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
887
307
 
20:35
At B+ i/b sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 1,3,4 power off    
887
307
06.04.06
00:55
At M- i/b sc1,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level    
887
307
 
02:25
At M+ i/b all change to 88m28-72m12-cplr and MCPs are raised back up to operational and all power off at L=6 i/b
06.04.06
09:45
887
307
06.04.06
11:40
At L=6 o/b all power on into 88m28-72m12-cplr    
888
307
 
18:10
At end of cusp sc 3,4 change to 88h58-72m12-cplr and MCPs are lowered by one level    
888
307
 
20:00
At M- o/b + 1 hour sc 1,3 power off    
888
307
 
21:00
At start of BM sc 1,3 power on into off-72m12-cpxy-apl-64w12-tnl-nw; sc 2,4 power cycle to off-72m12-cplx-anl-nw, LEEA MCPs lowered by one level for BM through o/b BS    
888
307
07.04.06
01:00
At end of BM sc2 changes to off-76m16-cpls, sc 1,3,4 power off    
888
307
 
06:00
Sc2 powers off for firings    
888
307
    Firings on all spacecraft (attitude slews)        
08.04.06
01:49
8 hours after end of firings sc2 powers on into off-76m16-cpls, LEEA MCP lowered by one level
06.04.06
09:45
888
307
 
03:50
At B- i/b sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
888
307
 
05:30
At B+ i/b sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 1,3,4 power off    
888
307
 
09:54
At start of BM Sc1,3 power on into 88h58-72m12-cplxt-apl-64w12; sc2 changes to, and sc4 powers on into, 88h58-72m12-cplxy-apl-nw-aph-nw, all MCPs lowered by one level for BM through i/b MP    
888
307
 
02:25
At end of BM all change back to 88m28-72m12-cplr and MCPs are raised back up to operational, and all power off at L=6 i/b
08.04.06
19:00
888
307
2006-04-08
20:38
Power on into 88m28-72m12-cplr at L=6 o/b
 
 
889
308
2006-04-09
01:15
Change mode to 88h58-72m12-cplr and MCPs are lowered by one level at end of cusp
 
 
889
308
2006-04-09
06:11
Power off 10 mins before B+ o/b
 
 
889
308
2006-04-09
06:20
Power on into off-76m16-cpls, LEEA MCP lowered by one level, at B+ o/b
 
 
889
308
2006-04-10
14:20
Change mode to 88h58-72m12-cplr, MCPs lowered by one level, at B+ i/b
 
 
889
308
2006-04-10
20:25
Change mode to 88m28-72m12-cplr and MCPs are raised back up to operational
 
 
889
308
2006-04-11
00:14
MCP test, mode 68h38-68h38-cnr
 
 
889
308
2006-04-11
00:45
Change mode to 88m28-72m12-cplr, MCPs at operational level, at end of test
 
 
889
308
2006-04-11
03:41
Power off at L=6 i/b
 
 
889
308
2006-04-11
05:32
Power on into 88m28-72m12-cplr at L=6 o/b
 
 
890
308
2006-04-11
09:39
Change mode to 88m28-72m12-cplxt-apl-64w12 for BM through o/b cusp
 
 
890
308
2006-04-11
11:10
Change mode to 88m28-72m12-cplr at end of BM
 
 
890
308
2006-04-11
12:25
Change mode to 88h58-72m12-cplr and MCPs are lowered by one level at end of cusp
 
 
890
308
2006-04-11
15:31
Power off 10 mins before B+ o/b
 
 
890
308
2006-04-11
15:40
Power on into off-76m16-cpls, LEEA MCP lowered by one level, at B+ o/b
 
 
890
308
2006-04-12
23:15
Change mode to 88h58-72m12-cplr, MCPs lowered by one level, at B+ i/b
 
 
890
308
2006-04-13
05:30
Change mode to 88m28-72m12-cplr and MCPs are raised back up to operational at M+ i/b
 
 
890
308
2006-04-13
13:17
Power off at L=6 i/b
 
 
890
308
2006-04-13
15:03
Power on into 88m28-72m12-cplr at L=6 o/b
 
 
891
308
2006-04-13
21:30
Change mode to 88h58-72m12-cplr and MCPs are lowered by one level at end of cusp
 
 
891
308
2006-04-14
00:36
Power off 10 mins before B+ o/b
 
 
891
308
2006-04-14
00:45
Power on into off-76m16-cpls, LEEA MCP lowered by one level, at B+ o/b
 
 
891
308
2006-04-15
08:10
Change mode to 88h58-72m12-cplr, MCPs lowered by one level, at B+ i/b
 
 
891
308
2006-04-15
13:29
Change mode to 88h58-72m12-cplxt-apl-64w12, MCPs lowered by one level, for BM through i/b MP
 
 
891
308
2006-04-15
16:30
Change mode to 88m28-72m12-cplr and MCPs are raised back up to operational at end of BM
 
 
891
308
2006-04-15
22:07
Power off at L=6 i/b
 
 
891
308
2006-04-15
23:50
Power on into 88m28-72m12-cplr at L=6 o/b
 
 
892
309
2006-04-16
04:20
Change mode to 88h58-72m12-cplr and MCPs are lowered by one level at end of cusp
 
 
892
309
2006-04-16
08:36
Power off one hour after M- o/b
 
 
892
309
2006-04-16
09:55
Power on into off-76m16-cpls, LEEA MCP lowered by one level, at B+ o/b
 
 
892
309
2006-04-16
12:01
Power off at B- o/b
 
 
892
309
2006-04-17
03:54
Power on into off-72m12-cpxy-apl-64w12-tnl-nw, LEEA MCP lowered by one level, for BM in i/b wind
 
 
892
309
2006-04-17
07:01
Power off at end of BM
 
 
892
309
2006-04-17
15:05
Power on into off-76m16-cpls, LEEA MCP lowered by one level, at B- i/b
 
 
892
309
2006-04-17
16:51
Power off at B+ i/b
 
 
892
309
2006-04-17
21:50
Power on into 88h58-72m12-cplr, MCPs lowered by one level, at M- i/b
 
 
892
309
2006-04-17
23:25
Change mode to 88m28-72m12-cplr and MCPs are raised back up to operational at M+ i/b
 
 
892
309
2006-04-18
03:44
MCP test, mode 68h38-68h38-cnr
 
 
892
309
2006-04-18
04:15
Change mode to 88m28-72m12-cplr, MCPs at operational level, at end of test
 
 
892
309
2006-04-18
07:15
Change mode to 88m28-68m08-cplr, and MCPs are lowered by one level, for WBD ops through perigee
 
 
892
309
2006-04-18
08:41
Power off at end of WBD ops
 
 
892
309
2006-04-18
09:05
Power on into 88m28-72m12-cplr at L=6 o/b
 
 
893
309
2006-04-18
15:45
Change mode to 88h58-72m12-cplr and MCPs are lowered by one level at end of cusp
 
 
893
309
2006-04-18
17:41
Power off one hour after M- o/b
 
 
893
309
2006-04-18
19:05
Power on into off-76m16-cpls, LEEA MCP lowered by one level, at B+ o/b
 
 
893
309
2006-04-18
21:16
Power off at B- o/b
 
 
893
309
2006-04-19
23:45
Power on into off-76m16-cpls, LEEA MCP lowered by one level, at B- i/b
 
 
893
309
2006-04-20
01:36
Power off at B+ i/b
 
 
893
309
2006-04-20
06:45
Power on into 88h58-72m12-cplr, MCPs lowered by one level, at M- i/b
 
 
893
309
2006-04-20
08:25
Change mode to 88m28-72m12-cplr and MCPs are raised back up to operational at M+ i/b
 
 
893
309
2006-04-20
16:33
Power off at L=6 i/b
 
 
893
309
2006-04-20
18:14
Power on into 88m28-72m12-cplr at L=6 o/b
 
 
894
309
2006-04-20
21:24
Change mode to 88m28-72m12-cplxt-apl-64w12 for BM through o/b cusp
 
 
894
309
2006-04-20
22:55
Change mode to 88h58-72m12-cplr and MCPs are lowered by one level at end of BM
 
 
894
309
2006-04-21
02:46
Power off one hour after M- o/b
 
 
894
309
2006-04-21
04:15
Power on into off-76m16-cpls, LEEA MCP lowered by one level, at B+ o/b
 
 
894
309
2006-04-21
06:26
Power off at B- o/b
 
 
894
309
2006-04-22
08:35
Power on into off-76m16-cpls, LEEA MCP lowered by one level, at B- i/b
 
 
894
309
2006-04-22
10:26
Power off at B+ i/b
 
 
894
309
2006-04-22
15:40
Power on into 88h58-72m12-cplr, MCPs lowered by one level, at M- i/b
 
 
894
309
2006-04-22
17:20
Change mode to 88m28-72m12-cplr and MCPs are raised back up to operational at M+ i/b
 
 
894
309
2006-04-23
01:14
Power off at L=6 i/b
 
 
894
309
2006-04-23
02:56
Power on into 88m28-72m12-cplr at L=6 o/b
 
 
895
309
2006-04-23
09:55
Change mode to 88h58-72m12-cplr and MCPs are lowered by one level at end of cusp
 
 
895
310
2006-04-23
13:21
Power off 10 mins before B+ o/b
 
 
895
310
2006-04-23
13:30
Power on into off-76m16-cpls, LEEA MCP lowered by one level, at B+ o/b
 
 
895
310
2006-04-24
17:29
Change mode to off-72m12-cpxy-apl-64w12-tnl-nw, LEEA MCP lowered by one level, for BM through i/b BS
 
 
895
310
2006-04-24
19:00
Change mode to off-76m16-cpls, LEEA MCP lowered by one level, at end of BM
 
 
895
310
2006-04-24
19:15
Change mode to 88h58-72m12-cplr, MCPs lowered by one level, at B+ i/b
 
 
895
310
2006-04-25
02:25
Change mode to 88m28-72m12-cplr and MCPs are raised back up to operational at M+ i/b
 
 
895
310
2006-04-25
07:19
MCP test, mode 68h38-68h38-cnr
 
 
895
310
2006-04-25
07:50
Change mode to 88m28-72m12-cplr, MCPs at operational level, at end of test
 
 
895
310
2006-04-25
10:46
Power off at L=6 i/b
 
 
895
310
2006-04-25
12:35
Power on into 88m28-72m12-cplr at L=6 o/b
 
 
896
310
2006-04-25
19:05
Change mode to 88h58-72m12-cplr and MCPs are lowered by one level at end of cusp
 
 
896
310
2006-04-25
22:31
Power off 10 mins before B+ o/b
 
 
896
310
2006-04-25
22:40
Power on into off-76m16-cpls, LEEA MCP lowered by one level, at B+ o/b
 
 
896
310
2006-04-27
04:00
Change mode to 88h58-72m12-cplr, MCPs lowered by one level, at B+ i/b
 
 
896
310
2006-04-27
11:20
Change mode to 88m28-72m12-cplr and MCPs are raised back up to operational at M+ i/b
 
 
896
310
2006-04-27
19:46
Power off at L=6 i/b
 
 
896
310
2006-04-27
21:24
Power on into 88m28-72m12-cplr at L=6 o/b
 
 
897
310
2006-04-28
01:40
Change mode to 88h58-72m12-cplr and MCPs are lowered by one level at end of cusp
 
 
897
310
2006-04-28
03:34
Change mode to 88h58-72m12-cplxt-apl-64w12, MCPs lowered by one level, for BM through o/b MP
 
 
897
310
2006-04-28
06:35
Change mode to 88h58-72m12-cplr, MCPs lowered by one level, at end of BM
 
 
897
310
2006-04-28
07:46
Power off 10 mins before B+ o/b
 
 
897
310
2006-04-28
07:55
Power on into off-76m16-cpls, LEEA MCP lowered by one level, at B+ o/b
 
 
897
310
2006-04-29
12:40
Change mode to 88h58-72m12-cplr, MCPs lowered by one level, at B+ i/b
 
 
897
310
2006-04-29
20:20
Change mode to 88m28-72m12-cplr and MCPs are raised back up to operational at M+ i/b
 
 
897
310
2006-04-30
04:35
Power off at L=6 i/b
 
 
897
310
2006-04-30
06:30
Power on into 88m28-72m12-cplr at L=6 o/b
 
 
898
311
2006-04-30
13:20
Change mode to 88h58-72m12-cplr and MCPs are lowered by one level at end of cusp
 
 
898
311
2006-04-30
15:16
Power off one hour after M- o/b
 
 
898
311
2006-04-30
17:10
Power on into off-76m16-cpls, LEEA MCP lowered by one level, at B+ o/b
 
 
898
311
2006-04-30
19:31
Power off at B- o/b
 
 
898
311


Mullard Space Science Laboratory - Holmbury St. Mary - Dorking - Surrey - RH5 6NT - Telephone: +44 (0)1483 204100 - Copyright © 1999-2009 UCL


Search by Google