UCL DEPARTMENT OF SPACE & CLIMATE PHYSICS
SPACE PLASMA PHYSICS GROUP
UCL

Group research
    Research
    Missions
About us
    People
    Contact Us
    Meetings
Know our science
Opportunities
    MSSL Jobs


Feb 2006 Sc1 Calendar sc2 sc3 sc4

Power on / Start
Mode
Power off
Orbit #
Planning period
date
time
date
time
27.02.06
09:25
At L=6 o/b sc 1,2,3 power on into, and sc4 changes to, 88m28-72m12-cplr; sc4 MCPs are also raised back up to operational    
872
302
 
11:30
At end of WBD ops sc4 power cycles to 88m28-72m12-cplr    
872
302
 
16:35
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level    
872
302
 
18:05
At M- o/b + 1 hour sc 2,3,4 power off    
872
302
 
20:00
At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
872
302
 
21:50
At B- o/b sc 2,3,4 power off    
872
302
28.02.06
05:15
5 mins before start of eclipse sc1 changes to off-60m00-cpls, LEEA MCP lowered by one level, with internal sunpulse    
872
302
 
06:04
5 mins after end of eclipse sc1 changes back to off-76m16-cpls, LEEA MCP lowered by one level, with external sunpulse    
872
302
01.03.06
04:10
At B- i/b sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
872
302
 
05:45
At B+ i/b sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off    
872
302
 
09:05
At M- i/b sc2 powers on into 88h58-72m12-cplr, MCPs lowered by one level    
872
302
 
09:20
At start of BM sc1 changes to, and sc3 powers on into, 88h58-72m12-cplxt-apl-64w12; sc2 changes to, and sc4 powers on into 88h58-72m12-cplxy-apl-nw-aph-nw, MCPs lowered by one levelon all, for BM through MP    
872
302
 
11:20
At end of BM sc 1,2,3 change to 88m28-72m12-cplr and MCPs are raised back up to operational, sc4 changes back to 88h58-72m12-cplr    
872
302
 
11:55
At M+ i/b sc4 changes to 88m28-72m12-cplr and MCPs are raised back up to operational, and all power off at L=6    
872
302
01.03.06
19:00
At L=6 o/b all power on into 88m28-72m12-cplr    
873
302
02.03.06
01:40
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level    
873
302
 
03:40
At M- o/b + 1 hour sc 2,3,4 power off    
873
302
 
05:00
At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
873
302
03.03.06
13:10
Sc1 changes to, and sc3 powers on into, off-72m12-cpxy-apl-64w12-tnl-nw, sc2,4 power on into off-72m12-cplx-anl-nw for BM through i/b BS    
873
302
 
15:40
At end of BM sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off    
873
302
 
13:15
At M- i/b sc 2,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level    
873
302
 
19:50
At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational, and all power off at L=6
04.03.06
02:05
873
302
04.03.06
03:25
At L=6 o/b sc2 powers on into 88m28-72m12-cplr    
874
302
04.03.06
03:40
At L=6 o/b sc 1,3,4 power on into 88m28-72m12-cplr    
874
303
 
10:50
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level    
874
303
 
11:00
At start of BM sc1,3 change to 88h58-72m12-cplxt-apl-64w12; sc2,4 change to 88h58-72m12-cplxy-apl-nw-aph-nw for BM through o/b MP    
874
303
 
12:30
At end of BM all change back to 88h58-72m12-cplr    
874
303
 
12:45
At M- o/b + 1 hour sc 1,3,4 power off    
874
303
 
14:05
At B+ o/b sc2 power cycles to, and sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
874
303
 
15:55
At B- o/b sc 1,3,4 power off    
874
303
05.03.06
22:20
At B- i/b sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
874
303
 
23:55
At B+ i/b sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 1,3,4 power off    
874
303
06.03.06
03:25
At M- i/b sc1,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level    
874
303
 
04:50
At M+ i/b all change to 88m28-72m12-cplr and MCPs are raised back up to operational    
874
303
 
07:44
MCP op level test performed, sensors in 68h38-68h38, 3hr 31 mins before L=6 i/b - sc1,2,3 at 07:44; sc4 at 09:14    
874
303
 
08:15
At end of test all change to 88m28-72m12-cplr (-cprl on sc2)    
874
303
 
11:15
At L=6 i/b sc3,4 power off; sc1,2 change to 88m28-68m08-cplr, MCPs lowered by one level, for WBD ops    
874
303
 
11:48
5 mins before start of eclipse sc1,2 change to 88m28-60m00-cplr, MCPs lowered by one level, with internal sunpulse    
874
303
06.03.06
12:58
5 mins after end of eclipse (after end of WBD ops) sc1,2 change back to external sunpulse and power off    
874
303
06.03.06
13:05
At L=6 o/b all power on into 88m28-72m12-cplr    
875
303
 
19:50
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level    
875
303
 
21:40
At M- o/b + 1 hour sc 1,3,4 power off    
875
303
 
23:10
At B+ o/b sc2 power cycles to, and sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
875
303
07.03.06
01:00
At B- o/b sc 1,3,4 power off    
875
303
 
19:50
At start of BM sc 1,3 power on into off-72m12-cpxy-apl-64w12-tnl-nw; sc2 changes to, and sc4 powers on into, off-72m12-cplx-anl-nw, LEEA MCP lowered by one level for BM in i/b wind    
875
303
 
22:50
At end of BM sc2 changes back to off-76m16-cpls; sc 1,3,4 power off    
875
303
08.03.06
07:25
At B- i/b sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
875
303
 
08:55
At B+ i/b sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 1,3,4 power off    
875
303
 
12:30
At M- i/b sc1,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level    
875
303
 
13:55
At M+ i/b all change to 88m28-72m12-cplr and MCPs are raised back up to operational    
875
303
 
20:30
At L=6 i/b sc1,2,3 power off; sc4 changes to 88m28-68m08-cplr, MCPs lowered by one level, for WBD ops    
875
303
 
22:10
5 mins before start of eclipse sc4 changes to 88m28-60m00-cplr, MCPs lowered by one level, with internal sunpulse    
875
303
 
23:06
5 mins after end of eclipse (after end of WBD ops) sc4 changes back to external sunpulse and powers off    
875
303
08.03.06
22:10
At L=6 o/b all power on into 88m28-72m12-cplr    
876
303
09.03.06
03:15
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level    
876
303
 
06:45
At M- o/b + 1 hour sc 1,3,4 power off    
876
303
 
08:05
At B+ o/b sc2 power cycles to, and sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
876
303
 
10:00
At B- o/b sc 1,3,4 power off    
876
303
10.03.06
16:25
At B- i/b sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
876
303
 
18:00
At B+ i/b sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 1,3,4 power off    
876
303
 
21:35
At M- i/b sc1,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level    
876
303
 
23:00
At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational and all power off at L=6
11.03.06
05:15
876
303
11.03.06
06:55
At L=6 o/b sc 1,2 power on into 88m28-72m12-cplr    
877
303
11.03.06
07:05
At L=6 o/b sc 3,4 power on into 88m28-72m12-cplr    
877
304
 
06:55
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level    
877
304
 
15:40
At M- o/b + 1 hour sc 2,3,4 power off    
877
304
 
17:10
At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
877
304
 
18:50
At B- o/b sc 2,3,4 power off    
877
304
13.03.06
01:20
At B- i/b sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
877
304
 
03:00
At B+ i/b sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off    
877
304
 
06:25
At M- i/b sc2,3 power on into 88h58-72m12-cplr, MCPs lowered by one level    
877
304
 
06:55
At start of BM sc 1,3 change to 88h58-72m12-cplxt-apl-64w12, sc2 changes to, and sc4 powers on into, 88h58-72m12-cplxy-apl-nw-aph-nw, MCPs lowered by one level on all for BM through i/b MP    
877
304
 
08:25
At end of BM sc 1,2,3 change back to 88m28-72m12-cplr and MCPs are raised back up to operational; sc4 changes back to 88h58-72m12-cplr    
877
304
 
09:10
At M+ i/b sc4 changes to 88m28-72m12-cplr and MCPs are raised back up to operational    
877
304
 
11:19
MCP op level test performed, sensors in 68h38-68h38, 3hr 31 mins before L=6 i/b - sc1,2,3 at 11:19; sc4 at 12:39    
877
304
 
11:50
At end of test all change to 88m28-72m12-cplr (-cprl on sc2)    
877
304
 
14:50
At L=6 i/b sc1,2,3 power off; sc4 changes to 88m28-68m08-cplr, MCPs lowered by one level, for WBD ops    
877
304
 
16:21
5 mins before start of eclipse sc4 changes to 88m28-60m00-cplr, MCPs lowered by one level, with internal sunpulse    
877
304
 
17:16
5 mins after end of eclipse (after end of WBD ops) sc4 changes back to external sunpulse and powers off    
877
304
13.03.06
16:35
At L=6 o/b all power on into 88m28-72m12-cplr    
878
304
 
23:10
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level    
878
304
14.03.06
00:50
At M- o/b + 1 hour sc 2,3,4 power off    
878
304
 
02:15
At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
878
304
15.03.06
09:55
At start of BM sc 1,3 change to off-72m12-cpxy-apl-64w12-tnl-nw; sc2,4 to off-72m12-cplx-anl-nw, LEEA MCP lowered by one level for BM in i/b wind    
878
304
 
12:55
At end of BM sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off    
878
304
 
15:30
At M- i/b sc2,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level    
878
304
 
17:05
At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational and all power off at L=6
15.03.06
23:45
878
304
16.03.06
01:20
At L=6 o/b all power on into 88m28-72m12-cplr    
879
304
 
06:15
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level    
879
304
 
08:50
At M- o/b + 1 hour sc 2,3,4 power off    
879
304
 
11:20
At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
879
304
 
13:15
At B- o/b sc 2,3,4 power off    
879
304
17.03.06
19:30
At B- i/b sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
879
304
 
21:05
At B+ i/b sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off    
879
304
18.03.06
00:45
At M- i/b sc2,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level    
879
304
 
02:10
At M+ i/b all change to 88m28-72m12-cplr and MCPs are raised back up to operational    
879
304
 
08:45
At L=6 i/b sc3 powers off; sc1,2,4 change to 88m28-68m08-cplr, MCPs lowered by one level, for WBD ops    
879
304
 
09:13
5 mins before start of eclipse sc1,2 change to 88m28-60m00-cplr, MCPs lowered by one level, with internal sunpulse    
879
304
 
10:07
5 mins after end of eclipse sc1,2 change back to 88m28-68m08-cplr, MCPs lowered by one level, with external sunpulse    
879
304
18.03.06
10:25
At L=6 o/b sc2 changes to 88m28-72m12-cplr and MCPs are raised back up to operational    
880
304
 
10:39
5 mins before start of eclipse sc4 changes to 88m28-60m00-cplr, MCPs lowered by one level, with internal sunpulse    
880
305
 
11:18
5 mins after end of eclipse sc4 changes back to external sunpulse and powers off    
880
305
18.03.06
10:35
At L=6 o/b sc1 changes to, and sc 3,4 power on into, 88m28-72m12-cplr; sc1 MCPs are also raised back up to operational    
880
305
 
11:00
At end of WBD ops sc 1,2 power cycle to 88m28-72m12-cplr    
880
305
 
17:20
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level    
880
305
 
09:15
At M- o/b + 1 hour sc 1,3,4 power off    
880
305
 
20:25
At B+ o/b sc2 power cycles to, and sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
880
305
 
22:20
At B- o/b sc 1,3,4 power off    
880
305
19.03.06
20:30
At start of BM sc2 power cycles to, and sc4 powers on into off-72m12-cplx-anl-nw, and sc 1,3 power on into off-72m12-cpxy-apl-64w12-tnl-nw, LEEA MCP lowered by one level for BM in wind    
880
305
 
23:30
At end of BM sc2 changes back to off-76m16-cplr, MCPs lowered by one level; sc 1,3,4 power off    
880
305
20.03.06
04:25
At B- i/b sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level
15.03.06
23:45
880
305
 
05:55
At B+ i/b sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 1,3,4 power off    
880
305
 
09:40
At M- i/b sc1,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level    
880
305
 
11:05
At M+ i/b all change to 88m28-72m12-cplr and MCPs are raised back up to operational    
880
305
 
14:39
MCP op level test performed, sensors in 68h38-68h38, 3hr 31 mins before L=6 i/b - sc1,2,3 at 14:39; sc4 at 15:54    
880
305
 
15:10
At end of test all change to 88m28-72m12-cplr (-cprl on sc2) and all power off at L=6 i/b
20.03.06
18:10
880
305
20.03.06
19:50
At L=6 o/b all power on into 88m28-72m12-cplr    
881
305
21.03.06
01:10
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level    
881
305
 
02:00
At start of BM sc 1,3 change to 88h58-72m12-cplxt-apl-64w12; sc2,4 to 88h58-72m12-cplxy-apl-nw-aph-nw, MCPs lowered by one level on all for BM through o/b MP    
881
305
 
03:30
At end of BM all change back to 88h58-72m12-cplr    
881
305
 
04:20
At M- o/b + 1 hour sc 1,3,4 power off    
881
305
 
05:30
At B+ o/b sc2 power cycles to, and sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
881
305
 
07:25
At B- o/b sc 1,3,4 power off    
881
305
22.03.06
13:25
At B- i/b sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
881
305
 
15:00
At B+ i/b sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 1,3,4 power off    
881
305
 
18:45
At M- i/b sc1,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level    
881
305
 
20:15
At M+ i/b all change to 88m28-72m12-cplr and MCPs are raised back up to operational    
881
305
23.03.06
02:50
At L=6 i/b sc1,2,3 power off; sc4 changes to 88m28-68m08-cplr, MCPs lowered by one level, for WBD ops    
881
305
 
04:26
5 mins before start of eclipse sc4 changes to 88m28-60m00-cplr, MCPs lowered by one level, with internal sunpulse    
881
305
 
05:25
At end of WBD ops (7 mins after end of eclipse) sc4 changes back to external sunpulse and powers off    
881
305
23.03.06
04:30
At L=6 o/b all power on into 88m28-72m12-cplr    
882
305
 
11:30
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level    
882
305
 
13:25
At M- o/b + 1 hour sc 1,3,4 power off    
882
305
 
14:35
At B+ o/b sc2 power cycles to, and sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
882
305
 
16:30
At B- o/b sc 1,3,4 power off    
882
305
24.03.06
22:15
At B- i/b sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
882
305
 
23:50
At B+ i/b sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 1,3,4 power off    
882
305
25.03.06
03:50
At M- i/b sc1,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level    
882
305
 
05:15
At M+ i/b all change to 88m28-72m12-cplr and MCPs are raised back up to operational    
882
305
 
12:20
At L=6 i/b sc1,2,3 power off; sc4 changes to 88m28-68m08-cplr, MCPs lowered by one level, for WBD ops    
882
305
 
14:48
Sc4 powers off at end of WBD ops    
882
306
25.03.06
14:05
At L=6 o/b all power on into 88m28-72m12-cplr    
883
306
 
18:15
At start of BM sc 1,3 change to 88m28-72m12-cplxt-apl-64w12; sc2,4 to 88m28-72m12-cplxy-apl-nw-aph-nw for BM through o/b cusp    
883
306
 
19:45
At end of BM all change back to 88m28-72m12-cplr    
883
306
 
20:40
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level    
883
306
 
22:35
At M- o/b + 1 hour sc 2,3,4 power off    
883
306
 
23:35
At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
883
306
26.03.06
01:35
At B- o/b sc 2,3,4 power off    
883
306
27.03.06
07:20
At B- i/b sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
883
306
 
08:55
At B+ i/b sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off    
883
306
 
12:50
At M- i/b sc2,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level    
883
306
 
14:20
At M+ i/b all change to 88m28-72m12-cplr and MCPs are raised back up to operational    
883
306
 
17:54
MCP op level test performed, sensors in 68h38-68h38, 3hr 31 mins before L=6 i/b - sc1,2,3 at 11:19; sc4 at 12:39    
883
306
 
18:25
At end of test all change to 88m28-72m12-cplr (-cprl on sc2) and all power off at L=6 i/b
27.03.06
21:25
883
306
27.03.06
23:00
At L=6 o/b all power on into 88m28-72m12-cplr    
884
306
28.03.06
03:35
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level    
884
306
 
07:40
At M- o/b + 1 hour sc 2,3,4 power off    
884
306
 
08:50
At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
884
306
 
10:50
At B- o/b sc 2,3,4 power off    
884
306
29.03.06
16:15
At B- i/b sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
884
306
 
17:55
At B+ i/b sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off    
884
306
 
21:50
At M- i/b sc2,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level    
884
306
 
23:20
At M+ i/b all change to 88m28-72m12-cplr and MCPs are raised back up to operational and all power off at L=6 i/b
30.03.06
06:15
884
306
30.03.06
08:05
At L=6 o/b all power on into 88m28-72m12-cplr    
885
306
 
14:55
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level    
885
306
 
16:50
At M- o/b + 1 hour sc 2,3,4 power off    
885
306
 
17:55
At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
885
306
01.04.06
00:40
At start of BM sc 1,3 change to off-72m12-cpxy-apl-64w12-tnl-nw; sc2,4 to off-72m12-cplx-anl-nw, LEEA MCP lowered by one level for BM in i/b wind    
885
306
 
03:40
At end of BM sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off    
885
306
 
06:55
At M- i/b sc2,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level    
885
306
 
08:25
At M+ i/b all change to 88m28-72m12-cplr and MCPs are raised back up to operational and all power off at L=6 i/b
01.04.06
15:50
885
306


Mullard Space Science Laboratory - Holmbury St. Mary - Dorking - Surrey - RH5 6NT - Telephone: +44 (0)1483 204100 - Copyright © 1999-2009 UCL


Search by Google