UCL DEPARTMENT OF SPACE & CLIMATE PHYSICS
SPACE PLASMA PHYSICS GROUP
UCL

Group research
    Research
    Missions
About us
    People
    Contact Us
    Meetings
Know our science
Opportunities
    MSSL Jobs


Jan 2006 Sc1 Calendar sc2 sc3 sc4

Power on / Start
Mode
Power off
Orbit #
Planning period
date
time
date
time
29.01.06
20:25
At L=6 o/b all power on into 88m28-72m12-cplr    
860
298
30.01.06
04:10
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level    
860
298
 
05:30
At M- o/b + 1 hour sc 2,3,4 power off    
860
298
 
08:55
At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
860
298
31.01.06
16:30
At B+ i/b sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off    
860
298
 
19:20
At start of BM sc1 changes to, and sc3 powers on into, 88h58-72m12-cplxt-apl-64w12; sc2,4 power on into 88h58-72m12-cplxy-apl-nw-aph-nw, MCPs lowered by one level for BM just before i/b MP    
860
298
 
20:50
At end of BM sc 1,2,3 change to 88h58-72m12-cplr, sc4 changes back to 88m28-72m12-cplr    
860
298
 
21:35
At M- i/b sc4 powers on into 88h58-72m12-cplr, MCPs lowered by one level    
860
298
 
21:40
At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational    
860
298
 
23:59
MCP op level test performed, sensors in 68h38-68h38, 3hr 31 mins before L=6 i/b - sc1,2,3 at 23:59 on 31st; sc4 at 01:29 on 1st    
860
298
01.02.06
00:30
At end of test all change to 88m28-72m12-cplr (-cprl on sc2)    
860
298
 
03:30
At L=6 i/b sc1,2,3 power off; sc4 changes to 88m28-68m08-cplr, MCPs lowered by one level, for WBD ops    
860
298
01.02.06
05:05
At L=6 o/b sc 1,2,3 power on into, and sc4 changes to, 88m28-72m12-cplr with MCP levels back to operational    
861
298
 
07:25
Sc4 power cycles to 88m28-72m12-cplr at end of WBD ops    
861
298
 
11:45
At end of cusp sc3 changes to 88h58-72m12-cplr and MCPs are lowered by one level    
861
298
 
10:50
At start of BM sc1 changes to 88m28-72m12-cplxt-apl-64w12, sc3 to 88h58-72m12-cplxt-apl-64w12, sc2,4 to 88m28-72m12-cplxy-apl-nw-aph-nw for BM around o/b cusp    
861
298
 
11:50
At end of BM sc 1,2,3 change back to 88h58-72m12-cplr with MCPs lowered by one level, sc4 to 88m28-72m12-cplr    
861
298
 
12:55
At end of cusp sc4 changes to 88h58-72m12-cplr and MCPs are lowered by one level    
861
298
 
15:05
At M- o/b + 1 hour sc 2,3,4 power off    
861
298
 
17:45
At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
861
298
 
19:35
At B- o/b sc 2,3,4 power off    
861
298
 
23:40
At B- i/b sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
861
298
03.02.06
01:45
At B+ i/b sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off    
861
298
 
04:55
At M- i/b sc2,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level    
861
298
 
06:50
At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational and all power off at L=6
03.02.06
12:40
861
298
03.02.06
14:35
At L=6 o/b all power on into 88m28-72m12-cplr    
862
298
 
22:10
At end of cusp sc 1,2,3 change to 88h58-72m12-cplr and MCPs are lowered by one level    
862
298
 
23:30
At start of BM sc1,3 change to 88h58-72m12-cplxt-apl-64w12, sc2,4 to 88h58-72m12-cplxy-apl-nw-aph-nw, all MCPs lowered by one level for BM in o/b sheath    
862
298
04.02.06
01:30
At end of BM sc 2,3,4 power off, sc 1 changes back to 88h58-72m12-cplr    
862
298
 
02:40
At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
862
298
 
03:45
At B- o/b sc 2,3,4 power off    
862
298
05.02.06
08:50
At B- i/b sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
862
298
 
10:55
At B+ i/b sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off    
862
298
 
14:00
At M- i/b sc2,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level    
862
298
 
15:55
At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational and sc 1,2,3 power off at L=6
05.02.06
22:00
862
298
 
23:30
At L=6 i/b sc4 powers off    
862
299
05.02.06
23:40
At L=6 o/b all power on into 88m28-72m12-cplr    
863
299
06.02.06
02:30
Sc 1,3 change to 88m28-72m12-cplxt-apl-64w12, sc2,4 to 88m28-72m12-cplxy-apl-nw-aph-nw for BM through o/b cusp    
863
299
 
04:12
At end of BM all change back to 88m28-72m12-cplr    
863
299
 
05:10
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level    
863
299
 
09:05
At M- o/b + 1 hour sc 1,3,4 power off    
863
299
 
11:30
At B+ o/b sc2 power cycles to, and sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
863
299
 
08:05
At B- o/b sc 1,3,4 power off    
863
299
07.02.06
18:15
At B- i/b sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
863
299
 
20:00
At B+ i/b sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 1,3,4 power off    
863
299
 
23:35
At M- i/b sc1,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level    
863
299
08.02.06
01:00
At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational    
863
299
 
03:09
MCP op level test performed, sensors in 68h38-68h38, 3hr 31 mins before L=6 i/b - sc1,2,3 at 03:09; sc4 at 04:44    
863
299
 
03:40
At end of test all change to 88m28-72m12-cplr (-cprl on sc2) and all power off at L=6 i/b
08.02.06
06:40
863
299
08.02.06
08:20
At L=6 o/b all power on into 88m28-72m12-cplr    
864
299
 
13:00
Sc 1,3 change to 88m28-72m12-cplxt-apl-64w12, sc2,4 to 88m28-72m12-cplxy-apl-nw-aph-nw for BM through o/b cusp    
864
299
 
14:18
At end of BM all change back to 88m28-72m12-cplr    
864
299
 
16:10
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level    
864
299
 
18:00
At M- o/b + 1 hour sc 1,3,4 power off    
864
299
 
20:20
At B+ o/b sc2 power cycles to, and sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
864
299
 
22:10
At B- o/b sc 1,3,4 power off    
864
299
10.02.06
03:25
At B- i/b sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
864
299
 
05:05
At B+ i/b sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 1,3,4 power off    
864
299
 
08:40
At M- i/b sc1,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level    
864
299
 
10:05
At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational and sc1,2,3 power off at L=6 i/b
10.02.06
16:15
864
299
10.02.06
17:50
At L=6 i/b sc4 powers off    
864
300
 
18:00
At L=6 o/b all power on into 88m28-72m12-cplr    
865
300
11.02.06
01:15
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level    
865
300
 
02:40
At M- o/b + 1 hour sc 2,3,4 power off    
865
300
 
05:15
At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
865
300
 
21:45
Sc 1,3 change to off-72m12-cpxy-apl-64w12-tnl-nw, sc2,4 to off-72m12-cplx-anl-nw for BM in wind at apogee    
865
300
12.02.06
00:45
All change back to off-76m16-cpls at end of BM    
865
300
 
14:15
At B+ i/b sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off    
865
300
 
17:25
At M- i/b sc2,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level    
865
300
 
19:10
At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational    
865
300
 
21:39
MCP op level test performed, sensors in 68h38-68h38, 3hr 31 mins before L=6 i/b - sc1,2,3 at 21:39; sc4 at 23:04    
865
300
 
22:10
At end of test all change to 88m28-72m12-cplr    
865
300
13.02.06
01:10
At L=6 i/b sc1,2,3 power off, sc4 changes to 88m28-68m08-cplr and MCPs are lowered by one level for perigee pass with WBD ops    
865
300
13.02.06
02:45
At L=6 o/b sc 1,2,3 power on into, and sc4 changes to, 88m28-72m12-cplr, and sc4 MCPs are raised back up to operational level    
866
300
 
05:00
At end of WBD ops sc4 power cycles to 88m28-72m12-cplr    
866
300
 
08:10
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level    
866
300
 
11:35
Sc 1,3 change to 88h58-72m12-cplxt-apl-64w12, sc2,4 to 88h58-72m12-cplxy-apl-nw-aph-nw for BM in wind at apogee    
866
300
 
13:05
Sc 2,3 power off, sc1,4 change back to 88h58-72m12-cplr at end of BM    
866
300
 
13:30
At M- o/b + 1 hour sc4 powers off    
866
300
 
13:35
At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
866
300
 
15:25
At B- o/b sc 2,3,4 power off    
866
300
14.02.06
07:40
IEL to FGM is shut on sc1 while they perform calibration    
866
300
 
07:50
IEL to FGM on sc1 is re-opened    
866
300
 
21:25
At B- i/b sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
866
300
 
23:20
At B+ i/b sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off    
866
300
15.02.06
02:25
At M- i/b sc2,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level    
866
300
 
04:10
At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational    
866
300
 
10:05
At L=6 i/b sc1,3 power off, sc2,4 change to 88m28-68m08-cplr and MCPs are lowered by one level for perigee pass with WBD ops    
866
300
 
10:15
Sc2 powers off at end of WBD ops    
866
300
 
12:00
At L=6 o/b sc 1,2,3 power on into, and sc4 power cycles to, 88m28-72m12-cplr    
867
300
 
19:20
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level    
867
300
 
20:45
At M- o/b + 1 hour sc2,3,4 power off    
867
300
 
23:10
At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
867
300
16.02.06
00:20
At B- o/b sc 2,3,4 power off    
867
300
17.02.06
06:35
At B- i/b sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
867
300
 
08:30
At B+ i/b sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off    
867
300
 
11:30
At M- i/b sc2,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level    
867
300
 
13:15
At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational    
867
300
 
19:40
Sc 1,2,3 power off at L=6 i/b    
867
300
17.02.06
21:05
At L=6 i/b sc4 powers off    
867
301
17.02.06
21:20
At L=6 o/b all power on into 88m28-72m12-cplr    
868
301
18.02.06
03:20
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level    
868
301
 
06:20
At M- o/b + 1 hour sc 1,3,4 power off    
868
301
 
08:10
At B+ o/b sc2 power cycles to, and sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
868
301
 
09:55
At B- o/b sc 1,3,4 power off    
868
301
19.02.06
15:55
At B- i/b sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
868
301
 
17:35
At B+ i/b sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 1,3,4 power off    
868
301
 
20:55
At M- i/b sc1,3 power on into 88h58-72m12-cplr, MCPs lowered by one level    
868
301
 
21:40
At start of BM sc 1,3 change to 88h58-72m12-cplxt-apl-64w12; sc2 changes to, and sc4 powers on into 88h58-72m12-cplxy-apl-nw-aph-nw for BM through MP/cusp    
868
301
 
23:10
At end of BM sc 1,2,3 change to 88m28-72m12-cplr and MCPs are raised back up to operational, sc4 changes back to 88h58-72m12-cplr    
868
301
 
23:35
At M+ i/b sc4 changes to 88m28-72m12-cplr and LEEA MCP is raised back up to operational    
868
301
20.02.06
00:49
MCP op level test performed, sensors in 68h38-68h38, 3hr 31 mins before L=6 i/b - sc1,2,3 at 00:49; sc4 at 02:14    
868
301
 
01:20
At end of test all change to 88m28-72m12-cplr    
868
301
 
04:20
At L=6 i/b sc1,2,3 power off, sc4 changes to 88m28-68m08-cplr and MCPs are lowered by one level for perigee pass with WBD ops    
868
301
 
07:00
Sc4 powers off at end of WBD ops    
868
301
20.02.06
05:55
At L=6 o/b all power on into 88m28-72m12-cplr    
869
301
 
13:25
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level    
869
301
 
15:20
At M- o/b + 1 hour sc 1,3,4 power off    
869
301
 
17:00
At B+ o/b sc2 power cycles to, and sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
869
301
 
18:50
At B- o/b sc 1,3,4 power off    
869
301
22.02.06
01:00
At B- i/b sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
869
301
 
02:40
At B+ i/b sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 1,3,4 power off    
869
301
 
06:05
At M- i/b sc1,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level    
869
301
 
07:30
At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational, and all power off at L=6
22.02.06
13:45
869
301
22.02.06
15:35
At L=6 o/b all power on into 88m28-72m12-cplr    
870
301
 
19:35
At start of BM sc 1,3 change to 88m28-72m12-cplxt-apl-64w12, sc2,4 to 88m28-72m12-cplxy-apl-nw-aph-nw for BM through cusp/MP    
870
301
 
22:35
At end of BM sc 1,2,3 change to 88h58-72m12-cplr and MCPs are lowered by one level, sc4 changes back to 88m28-72m12-cplr    
870
301
 
23:50
At end of cusp sc4 changes to 88h58-72m12-cplr and MCPs are lowered by one level    
870
301
23.02.06
00:20
At M- o/b + 1 hour sc 2,3,4 power off    
870
301
 
02:00
At B+ o/b sc2 power cycles to, and sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
870
301
 
03:50
At B- o/b sc 1,3,4 power off    
870
301
24.02.06
10:00
At B- i/b sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level    
870
301
 
11:35
At B+ i/b sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 1,3,4 power off    
870
301
 
15:05
At M- i/b sc1,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level    
870
301
 
16:30
At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational, and all power off at L=6    
870
301
25.02.06
00:10
Sc2 powers on into 88m28-72m12-cplr at L=6 o/b    
871
301
25.02.06
00:25
At L=6 o/b sc 1,3,4 power on into 88m28-72m12-cplr
871
302
05:30
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level
871
302
09:25
At M- o/b + 1 hour sc 2,3,4 power off
871
302
11:00
At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level
871
302
26.02.06
20:45
At B+ i/b sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off
871
302
23:55
At M- i/b sc 2,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level
871
302
27.02.06
01:35
At M+ i/b all change to 88m28-72m12-cplr and LEEA MCP is raised back up to operational
871
302
04:04
MCP op level test performed, sensors in 68h38-68h38, 3hr 31 mins before L=6 i/b - sc1,2,3 at 04:04; sc4 at 05:39
871
302
04:35
At end of test all change to 88m28-72m12-cplr
871
302
07:35
At L=6 i/b sc1,2,3 power off, sc4 changes to 88m28-68m08-cplr and MCPs are lowered by one level for perigee pass with WBD ops
871
302
09:59
5 mins before start of eclipse sc4 changes to 88m28-60m00-cplr, LEEA MCP lowered by one level, with internal sunpulse
871
302
10:40
5 mins after end of eclipse sc4 changes back to 88m28-68m08-cplr, LEEA MCP lowered by one level, with external sunpulse
871
302
27.02.06
09:25
At L=6 o/b sc 1,2,3 power on into, and sc4 changes to, 88m28-72m12-cplr; sc4 MCP's are also raised back up to operational
872
302
11:30
At end of WBD ops sc4 power cycles to 88m28-72m12-cplr
872
302
16:35
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level
872
302
18:05
At M- o/b + 1 hour sc 2,3,4 power off
872
302
20:00
At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level
872
302
21:50
At B- o/b sc 2,3,4 power off
872
302
28.02.06
05:15
5 mins before start of eclipse sc1 changes to off-60m00-cpls, LEEA MCP lowered by one level, with internal sunpulse
872
302
06:04
5 mins after end of eclipse sc1 changes back to off-76m16-cpls, LEEA MCP lowered by one level, with external sunpulse
872
302
01.03.06
04:10
At B- i/b sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level
872
302
05:45
At B+ i/b sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off
872
302
09:05
At M- i/b sc2 powers on into 88h58-72m12-cplr, MCPs lowered by one level
872
302
09:20
At start of BM sc1 changes to, and sc3 powers on into, 88h58-72m12-cplxt-apl-64w12; sc2 changes to, and sc4 powers on into 88h58-72m12-cplxy-apl-nw-aph-nw, MCPs lowered by one levelon all, for BM through MP
872
302
11:20
At end of BM sc 1,2,3 change to 88m28-72m12-cplr and MCPs are raised back up to operational, sc4 changes back to 88h58-72m12-cplr
872
302
11:55
At M+ i/b sc4 changes to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational, and all power off at L=6
01.03.06
17:15
872
302


Mullard Space Science Laboratory - Holmbury St. Mary - Dorking - Surrey - RH5 6NT - Telephone: +44 (0)1483 204100 - Copyright © 1999-2009 UCL


Search by Google