|
Power on / Start |
Mode |
Power
off |
Orbit
# |
Planning
period |
| date |
time |
date |
time |
| 29.01.06 |
20:25 |
At L=6 o/b all power on into 88m28-72m12-cplr |
|
|
860 |
298 |
| 30.01.06 |
04:10 |
At end of cusp all change to 88h58-72m12-cplr
and MCPs are lowered by one level |
|
|
860 |
298 |
| |
05:30 |
At M- o/b + 1 hour sc 2,3,4 power
off |
|
|
860 |
298 |
| |
08:55 |
At B+ o/b sc1 power cycles to,
and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level |
|
|
860 |
298 |
| 31.01.06 |
16:30 |
At B+ i/b sc1 HEEA powers on and
instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc
2,3,4 power off |
|
|
860 |
298 |
| |
19:20 |
At start of BM sc1 changes to,
and sc3 powers on into, 88h58-72m12-cplxt-apl-64w12; sc2,4 power on into
88h58-72m12-cplxy-apl-nw-aph-nw, MCPs lowered by one level for BM just
before i/b MP |
|
|
860 |
298 |
| |
20:50 |
At end of BM sc 1,2,3 change to
88h58-72m12-cplr, sc4 changes back to 88m28-72m12-cplr |
|
|
860 |
298 |
| |
21:35 |
At M- i/b sc4 powers on into 88h58-72m12-cplr,
MCPs lowered by one level |
|
|
860 |
298 |
| |
21:40 |
At M+ i/b all change to 88m28-72m12-cplr
and LEEA MCPs are raised back up to operational |
|
|
860 |
298 |
| |
23:59 |
MCP op level
test performed, sensors in 68h38-68h38, 3hr 31 mins before L=6 i/b - sc1,2,3
at 23:59 on 31st; sc4 at 01:29 on 1st |
|
|
860 |
298 |
| 01.02.06 |
00:30 |
At end of test
all change to 88m28-72m12-cplr (-cprl on sc2) |
|
|
860 |
298 |
| |
03:30 |
At L=6 i/b sc1,2,3
power off; sc4 changes to 88m28-68m08-cplr, MCPs lowered by one level,
for WBD ops |
|
|
860 |
298 |
| 01.02.06 |
05:05 |
At L=6 o/b sc 1,2,3 power on into,
and sc4 changes to, 88m28-72m12-cplr with MCP levels back to operational |
|
|
861 |
298 |
| |
07:25 |
Sc4 power cycles to 88m28-72m12-cplr
at end of WBD ops |
|
|
861 |
298 |
| |
11:45 |
At end of cusp sc3 changes to 88h58-72m12-cplr
and MCPs are lowered by one level |
|
|
861 |
298 |
| |
10:50 |
At start of BM sc1 changes to 88m28-72m12-cplxt-apl-64w12,
sc3 to 88h58-72m12-cplxt-apl-64w12, sc2,4 to 88m28-72m12-cplxy-apl-nw-aph-nw
for BM around o/b cusp |
|
|
861 |
298 |
| |
11:50 |
At end of BM sc 1,2,3 change back
to 88h58-72m12-cplr with MCPs lowered by one level, sc4 to 88m28-72m12-cplr |
|
|
861 |
298 |
| |
12:55 |
At end of cusp sc4 changes to 88h58-72m12-cplr
and MCPs are lowered by one level |
|
|
861 |
298 |
| |
15:05 |
At M- o/b + 1 hour sc 2,3,4 power
off |
|
|
861 |
298 |
| |
17:45 |
At B+ o/b sc1
power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP
lowered by one level |
|
|
861 |
298 |
| |
19:35 |
At B- o/b sc
2,3,4 power off |
|
|
861 |
298 |
| |
23:40 |
At B- i/b sc 2,3,4 power on into
off-76m16-cpls, LEEA MCP lowered by one level |
|
|
861 |
298 |
| 03.02.06 |
01:45 |
At B+ i/b sc1 HEEA powers on and
instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc
2,3,4 power off |
|
|
861 |
298 |
| |
04:55 |
At M- i/b sc2,3,4 power on into
88h58-72m12-cplr, MCPs lowered by one level |
|
|
861 |
298 |
| |
06:50 |
At M+ i/b all change to 88m28-72m12-cplr
and LEEA MCPs are raised back up to operational and all power off at L=6 |
03.02.06 |
12:40 |
861 |
298 |
| 03.02.06 |
14:35 |
At L=6 o/b all power on into 88m28-72m12-cplr |
|
|
862 |
298 |
| |
22:10 |
At end of cusp sc 1,2,3 change
to 88h58-72m12-cplr and MCPs are lowered by one level |
|
|
862 |
298 |
| |
23:30 |
At start of BM sc1,3 change to
88h58-72m12-cplxt-apl-64w12, sc2,4 to 88h58-72m12-cplxy-apl-nw-aph-nw,
all MCPs lowered by one level for BM in o/b sheath |
|
|
862 |
298 |
| 04.02.06 |
01:30 |
At end of BM sc 2,3,4 power off,
sc 1 changes back to 88h58-72m12-cplr |
|
|
862 |
298 |
| |
02:40 |
At B+ o/b sc1
power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP
lowered by one level |
|
|
862 |
298 |
| |
03:45 |
At B- o/b sc
2,3,4 power off |
|
|
862 |
298 |
| 05.02.06 |
08:50 |
At B- i/b sc 2,3,4 power on into
off-76m16-cpls, LEEA MCP lowered by one level |
|
|
862 |
298 |
| |
10:55 |
At B+ i/b sc1 HEEA powers on and
instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc
2,3,4 power off |
|
|
862 |
298 |
| |
14:00 |
At M- i/b sc2,3,4 power on into
88h58-72m12-cplr, MCPs lowered by one level |
|
|
862 |
298 |
| |
15:55 |
At M+ i/b all change to 88m28-72m12-cplr
and LEEA MCPs are raised back up to operational and sc 1,2,3 power off
at L=6 |
05.02.06 |
22:00 |
862 |
298 |
| |
23:30 |
At L=6 i/b sc4 powers off |
|
|
862 |
299 |
| 05.02.06 |
23:40 |
At L=6 o/b all power on into 88m28-72m12-cplr |
|
|
863 |
299 |
| 06.02.06 |
02:30 |
Sc 1,3 change to 88m28-72m12-cplxt-apl-64w12,
sc2,4 to 88m28-72m12-cplxy-apl-nw-aph-nw for BM through o/b cusp |
|
|
863 |
299 |
| |
04:12 |
At end of BM all change back to
88m28-72m12-cplr |
|
|
863 |
299 |
| |
05:10 |
At end of cusp all change to 88h58-72m12-cplr
and MCPs are lowered by one level |
|
|
863 |
299 |
| |
09:05 |
At M- o/b + 1 hour sc 1,3,4 power
off |
|
|
863 |
299 |
| |
11:30 |
At B+ o/b sc2 power cycles to,
and sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level |
|
|
863 |
299 |
| |
08:05 |
At B- o/b sc
1,3,4 power off |
|
|
863 |
299 |
| 07.02.06 |
18:15 |
At B- i/b sc 1,3,4 power on into
off-76m16-cpls, LEEA MCP lowered by one level |
|
|
863 |
299 |
| |
20:00 |
At B+ i/b sc2 HEEA powers on and
instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc
1,3,4 power off |
|
|
863 |
299 |
| |
23:35 |
At M- i/b sc1,3,4 power on into
88h58-72m12-cplr, MCPs lowered by one level |
|
|
863 |
299 |
| 08.02.06 |
01:00 |
At M+ i/b all change to 88m28-72m12-cplr
and LEEA MCPs are raised back up to operational |
|
|
863 |
299 |
| |
03:09 |
MCP op level
test performed, sensors in 68h38-68h38, 3hr 31 mins before L=6 i/b - sc1,2,3
at 03:09; sc4 at 04:44 |
|
|
863 |
299 |
| |
03:40 |
At end of test
all change to 88m28-72m12-cplr (-cprl on sc2) and all power off
at L=6 i/b |
08.02.06 |
06:40 |
863 |
299 |
| 08.02.06 |
08:20 |
At L=6 o/b all power on into 88m28-72m12-cplr |
|
|
864 |
299 |
| |
13:00 |
Sc 1,3 change to 88m28-72m12-cplxt-apl-64w12,
sc2,4 to 88m28-72m12-cplxy-apl-nw-aph-nw for BM through o/b cusp |
|
|
864 |
299 |
| |
14:18 |
At end of BM all change back to
88m28-72m12-cplr |
|
|
864 |
299 |
| |
16:10 |
At end of cusp all change to 88h58-72m12-cplr
and MCPs are lowered by one level |
|
|
864 |
299 |
| |
18:00 |
At M- o/b + 1 hour sc 1,3,4 power
off |
|
|
864 |
299 |
| |
20:20 |
At B+ o/b sc2 power cycles to,
and sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level |
|
|
864 |
299 |
| |
22:10 |
At B- o/b sc
1,3,4 power off |
|
|
864 |
299 |
| 10.02.06 |
03:25 |
At B- i/b sc 1,3,4 power on into
off-76m16-cpls, LEEA MCP lowered by one level |
|
|
864 |
299 |
| |
05:05 |
At B+ i/b sc2 HEEA powers on and
instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc
1,3,4 power off |
|
|
864 |
299 |
| |
08:40 |
At M- i/b sc1,3,4 power on into
88h58-72m12-cplr, MCPs lowered by one level |
|
|
864 |
299 |
| |
10:05 |
At M+ i/b all change to 88m28-72m12-cplr
and LEEA MCPs are raised back up to operational and sc1,2,3 power off
at L=6 i/b |
10.02.06 |
16:15 |
864 |
299 |
| 10.02.06 |
17:50 |
At L=6 i/b sc4 powers off |
|
|
864 |
300 |
| |
18:00 |
At L=6 o/b all power on into 88m28-72m12-cplr |
|
|
865 |
300 |
| 11.02.06 |
01:15 |
At end of cusp all change to 88h58-72m12-cplr
and MCPs are lowered by one level |
|
|
865 |
300 |
| |
02:40 |
At M- o/b + 1 hour sc 2,3,4 power
off |
|
|
865 |
300 |
| |
05:15 |
At B+ o/b sc1 power cycles to,
and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level |
|
|
865 |
300 |
| |
21:45 |
Sc 1,3 change to off-72m12-cpxy-apl-64w12-tnl-nw,
sc2,4 to off-72m12-cplx-anl-nw for BM in wind at apogee |
|
|
865 |
300 |
| 12.02.06 |
00:45 |
All change back to off-76m16-cpls
at end of BM |
|
|
865 |
300 |
| |
14:15 |
At B+ i/b sc1 HEEA powers on and
instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc
2,3,4 power off |
|
|
865 |
300 |
| |
17:25 |
At M- i/b sc2,3,4 power on into
88h58-72m12-cplr, MCPs lowered by one level |
|
|
865 |
300 |
| |
19:10 |
At M+ i/b all change to 88m28-72m12-cplr
and LEEA MCPs are raised back up to operational |
|
|
865 |
300 |
| |
21:39 |
MCP op level
test performed, sensors in 68h38-68h38, 3hr 31 mins before L=6 i/b - sc1,2,3
at 21:39; sc4 at 23:04 |
|
|
865 |
300 |
| |
22:10 |
At end of test
all change to 88m28-72m12-cplr |
|
|
865 |
300 |
| 13.02.06 |
01:10 |
At L=6 i/b sc1,2,3 power off, sc4
changes to 88m28-68m08-cplr and MCPs are lowered by one level for perigee
pass with WBD ops |
|
|
865 |
300 |
| 13.02.06 |
02:45 |
At L=6 o/b sc
1,2,3 power on into, and sc4 changes to, 88m28-72m12-cplr, and sc4 MCPs
are raised back up to operational level |
|
|
866 |
300 |
| |
05:00 |
At end of WBD ops sc4 power cycles
to 88m28-72m12-cplr |
|
|
866 |
300 |
| |
08:10 |
At end of cusp all change to 88h58-72m12-cplr
and MCPs are lowered by one level |
|
|
866 |
300 |
| |
11:35 |
Sc 1,3 change to 88h58-72m12-cplxt-apl-64w12,
sc2,4 to 88h58-72m12-cplxy-apl-nw-aph-nw for BM in wind at apogee |
|
|
866 |
300 |
| |
13:05 |
Sc 2,3 power off, sc1,4 change
back to 88h58-72m12-cplr at end of BM |
|
|
866 |
300 |
| |
13:30 |
At M- o/b + 1 hour sc4 powers off |
|
|
866 |
300 |
| |
13:35 |
At B+ o/b sc1 power cycles to,
and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level |
|
|
866 |
300 |
| |
15:25 |
At B- o/b sc
2,3,4 power off |
|
|
866 |
300 |
| 14.02.06 |
07:40 |
IEL to FGM
is shut on sc1 while they perform calibration |
|
|
866 |
300 |
| |
07:50 |
IEL to FGM
on sc1 is re-opened |
|
|
866 |
300 |
| |
21:25 |
At B- i/b sc 2,3,4 power on into
off-76m16-cpls, LEEA MCP lowered by one level |
|
|
866 |
300 |
| |
23:20 |
At B+ i/b sc1 HEEA powers on and
instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc
2,3,4 power off |
|
|
866 |
300 |
| 15.02.06 |
02:25 |
At M- i/b sc2,3,4 power on into
88h58-72m12-cplr, MCPs lowered by one level |
|
|
866 |
300 |
| |
04:10 |
At M+ i/b all change to 88m28-72m12-cplr
and LEEA MCPs are raised back up to operational |
|
|
866 |
300 |
| |
10:05 |
At L=6 i/b sc1,3 power off, sc2,4
change to 88m28-68m08-cplr and MCPs are lowered by one level for perigee
pass with WBD ops |
|
|
866 |
300 |
| |
10:15 |
Sc2 powers off at end of WBD ops |
|
|
866 |
300 |
| |
12:00 |
At L=6 o/b sc
1,2,3 power on into, and sc4 power cycles to, 88m28-72m12-cplr |
|
|
867 |
300 |
| |
19:20 |
At end of cusp all change to 88h58-72m12-cplr
and MCPs are lowered by one level |
|
|
867 |
300 |
| |
20:45 |
At M- o/b + 1 hour sc2,3,4 power
off |
|
|
867 |
300 |
| |
23:10 |
At B+ o/b sc1 power cycles to,
and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level |
|
|
867 |
300 |
| 16.02.06 |
00:20 |
At B- o/b sc 2,3,4 power off |
|
|
867 |
300 |
| 17.02.06 |
06:35 |
At B- i/b sc 2,3,4 power on into
off-76m16-cpls, LEEA MCP lowered by one level |
|
|
867 |
300 |
| |
08:30 |
At B+ i/b sc1 HEEA powers on and
instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc
2,3,4 power off |
|
|
867 |
300 |
| |
11:30 |
At M- i/b sc2,3,4
power on into 88h58-72m12-cplr, MCPs lowered by one level |
|
|
867 |
300 |
| |
13:15 |
At M+ i/b all change to 88m28-72m12-cplr
and LEEA MCPs are raised back up to operational |
|
|
867 |
300 |
| |
19:40 |
Sc 1,2,3 power off at L=6 i/b |
|
|
867 |
300 |
| 17.02.06 |
21:05 |
At L=6 i/b sc4 powers off |
|
|
867 |
301 |
| 17.02.06 |
21:20 |
At L=6 o/b all power on into 88m28-72m12-cplr |
|
|
868 |
301 |
| 18.02.06 |
03:20 |
At end of cusp all change to 88h58-72m12-cplr
and MCPs are lowered by one level |
|
|
868 |
301 |
| |
06:20 |
At M- o/b + 1 hour sc 1,3,4 power
off |
|
|
868 |
301 |
| |
08:10 |
At B+ o/b sc2 power cycles to,
and sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level |
|
|
868 |
301 |
| |
09:55 |
At B- o/b sc 1,3,4 power off |
|
|
868 |
301 |
|
19.02.06 |
15:55 |
At B- i/b sc 1,3,4 power on into
off-76m16-cpls, LEEA MCP lowered by one level |
|
|
868 |
301 |
| |
17:35 |
At B+ i/b sc2 HEEA powers on and
instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc
1,3,4 power off |
|
|
868 |
301 |
| |
20:55 |
At M- i/b sc1,3 power on into 88h58-72m12-cplr,
MCPs lowered by one level |
|
|
868 |
301 |
| |
21:40 |
At start of BM sc 1,3 change to
88h58-72m12-cplxt-apl-64w12; sc2 changes to, and sc4 powers on into 88h58-72m12-cplxy-apl-nw-aph-nw
for BM through MP/cusp |
|
|
868 |
301 |
| |
23:10 |
At end of BM sc 1,2,3 change to
88m28-72m12-cplr and MCPs are raised back up to operational, sc4 changes
back to 88h58-72m12-cplr |
|
|
868 |
301 |
| |
23:35 |
At M+ i/b sc4 changes to 88m28-72m12-cplr
and LEEA MCP is raised back up to operational |
|
|
868 |
301 |
|
20.02.06 |
00:49 |
MCP op level
test performed, sensors in 68h38-68h38, 3hr 31 mins before L=6 i/b - sc1,2,3
at 00:49; sc4 at 02:14 |
|
|
868 |
301 |
| |
01:20 |
At end of test
all change to 88m28-72m12-cplr |
|
|
868 |
301 |
| |
04:20 |
At L=6 i/b sc1,2,3 power off, sc4
changes to 88m28-68m08-cplr and MCPs are lowered by one level for perigee
pass with WBD ops |
|
|
868 |
301 |
| |
07:00 |
Sc4 powers off
at end of WBD ops |
|
|
868 |
301 |
|
20.02.06 |
05:55 |
At L=6 o/b all
power on into 88m28-72m12-cplr |
|
|
869 |
301 |
| |
13:25 |
At end of cusp all change to 88h58-72m12-cplr
and MCPs are lowered by one level |
|
|
869 |
301 |
| |
15:20 |
At M- o/b + 1 hour sc 1,3,4 power
off |
|
|
869 |
301 |
| |
17:00 |
At B+ o/b sc2 power cycles to,
and sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level |
|
|
869 |
301 |
| |
18:50 |
At B- o/b sc 1,3,4 power off |
|
|
869 |
301 |
|
22.02.06 |
01:00 |
At B- i/b sc 1,3,4 power on into
off-76m16-cpls, LEEA MCP lowered by one level |
|
|
869 |
301 |
| |
02:40 |
At B+ i/b sc2 HEEA powers on and
instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc
1,3,4 power off |
|
|
869 |
301 |
| |
06:05 |
At M- i/b sc1,3,4 power on into
88h58-72m12-cplr, MCPs lowered by one level |
|
|
869 |
301 |
| |
07:30 |
At M+ i/b all change to 88m28-72m12-cplr
and LEEA MCPs are raised back up to operational, and all power off at L=6 |
22.02.06 |
13:45 |
869 |
301 |
|
22.02.06 |
15:35 |
At L=6 o/b all power on into 88m28-72m12-cplr |
|
|
870 |
301 |
| |
19:35 |
At start of BM sc 1,3 change to
88m28-72m12-cplxt-apl-64w12, sc2,4 to 88m28-72m12-cplxy-apl-nw-aph-nw
for BM through cusp/MP |
|
|
870 |
301 |
| |
22:35 |
At end of BM sc 1,2,3 change to
88h58-72m12-cplr and MCPs are lowered by one level, sc4 changes back to
88m28-72m12-cplr |
|
|
870 |
301 |
| |
23:50 |
At end of cusp sc4 changes to 88h58-72m12-cplr
and MCPs are lowered by one level |
|
|
870 |
301 |
|
23.02.06 |
00:20 |
At M- o/b + 1 hour sc 2,3,4 power
off |
|
|
870 |
301 |
| |
02:00 |
At B+ o/b sc2 power cycles to,
and sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level |
|
|
870 |
301 |
| |
03:50 |
At B- o/b sc 1,3,4 power off |
|
|
870 |
301 |
|
24.02.06 |
10:00 |
At B- i/b sc 1,3,4 power on into
off-76m16-cpls, LEEA MCP lowered by one level |
|
|
870 |
301 |
| |
11:35 |
At B+ i/b sc2 HEEA powers on and
instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc
1,3,4 power off |
|
|
870 |
301 |
| |
15:05 |
At M- i/b sc1,3,4 power on into
88h58-72m12-cplr, MCPs lowered by one level |
|
|
870 |
301 |
| |
16:30 |
At M+ i/b all change to 88m28-72m12-cplr
and LEEA MCPs are raised back up to operational, and all power off at
L=6 |
|
|
870 |
301 |
|
25.02.06 |
00:10 |
Sc2 powers on into 88m28-72m12-cplr
at L=6 o/b |
|
|
871 |
301 |
25.02.06 |
00:25 |
At L=6 o/b sc 1,3,4 power on into
88m28-72m12-cplr |
|
|
871 |
302 |
|
05:30 |
At end of cusp all change to 88h58-72m12-cplr
and MCPs are lowered by one level |
|
|
871 |
302 |
|
09:25 |
At M- o/b + 1 hour sc 2,3,4 power
off |
|
|
871 |
302 |
|
11:00 |
At B+ o/b sc1 power cycles to,
and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level |
|
|
871 |
302 |
26.02.06 |
20:45 |
At B+ i/b sc1 HEEA powers on and
instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc
2,3,4 power off |
|
|
871 |
302 |
|
23:55 |
At M- i/b sc 2,3,4 power on into
88h58-72m12-cplr, MCPs lowered by one level |
|
|
871 |
302 |
27.02.06 |
01:35 |
At M+ i/b all change to 88m28-72m12-cplr
and LEEA MCP is raised back up to operational |
|
|
871 |
302 |
|
04:04 |
MCP op level
test performed, sensors in 68h38-68h38, 3hr 31 mins before L=6 i/b - sc1,2,3
at 04:04; sc4 at 05:39 |
|
|
871 |
302 |
|
04:35 |
At end of test all change to 88m28-72m12-cplr |
|
|
871 |
302 |
|
07:35 |
At L=6 i/b sc1,2,3 power off, sc4
changes to 88m28-68m08-cplr and MCPs are lowered by one level for perigee
pass with WBD ops |
|
|
871 |
302 |
|
09:59 |
5 mins before
start of eclipse sc4 changes to 88m28-60m00-cplr, LEEA MCP lowered by
one level, with internal sunpulse |
|
|
871 |
302 |
|
10:40 |
5 mins after end of eclipse sc4
changes back to 88m28-68m08-cplr, LEEA MCP lowered by one level, with
external sunpulse |
|
|
871 |
302 |
27.02.06 |
09:25 |
At L=6 o/b sc 1,2,3 power on into,
and sc4 changes to, 88m28-72m12-cplr; sc4 MCP's are also raised back up
to operational |
|
|
872 |
302 |
|
11:30 |
At end of WBD
ops sc4 power cycles to 88m28-72m12-cplr |
|
|
872 |
302 |
|
16:35 |
At end of cusp all change to 88h58-72m12-cplr
and MCPs are lowered by one level |
|
|
872 |
302 |
|
18:05 |
At M- o/b + 1 hour sc 2,3,4 power
off |
|
|
872 |
302 |
|
20:00 |
At B+ o/b sc1 power cycles to, and
sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level |
|
|
872 |
302 |
|
21:50 |
At B- o/b sc 2,3,4 power off |
|
|
872 |
302 |
28.02.06 |
05:15 |
5 mins before
start of eclipse sc1 changes to off-60m00-cpls, LEEA MCP lowered by one
level, with internal sunpulse |
|
|
872 |
302 |
|
06:04 |
5 mins after end of eclipse sc1
changes back to off-76m16-cpls, LEEA MCP lowered by one level, with external
sunpulse |
|
|
872 |
302 |
01.03.06 |
04:10 |
At B- i/b sc 2,3,4 power on into
off-76m16-cpls, LEEA MCP lowered by one level |
|
|
872 |
302 |
|
05:45 |
At B+ i/b sc1 HEEA powers on and
instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc
2,3,4 power off |
|
|
872 |
302 |
|
09:05 |
At M- i/b sc2 powers on into 88h58-72m12-cplr,
MCPs lowered by one level |
|
|
872 |
302 |
|
09:20 |
At start of BM sc1 changes to,
and sc3 powers on into, 88h58-72m12-cplxt-apl-64w12; sc2 changes to, and
sc4 powers on into 88h58-72m12-cplxy-apl-nw-aph-nw, MCPs lowered by one
levelon all, for BM through MP |
|
|
872 |
302 |
|
11:20 |
At end of BM sc 1,2,3 change to
88m28-72m12-cplr and MCPs are raised back up to operational, sc4 changes
back to 88h58-72m12-cplr |
|
|
872 |
302 |
|
11:55 |
At M+ i/b sc4 changes to 88m28-72m12-cplr
and LEEA MCPs are raised back up to operational, and all power off at
L=6 |
01.03.06 |
17:15 |
872 |
302 |