| Dec 2005 | Sc1 Calendar | sc2 | sc3 | sc4 |
| Power on / Start |
Mode |
Power off |
Orbit # |
Planning period |
||
| date |
time |
date |
time |
|||
| 29.12.05 |
22:05 |
At L=6 o/b all power on into 88m28-72m12-cplr (-cprl on sc2) |
847 |
293 |
||
| 30.12.05 |
00:05 |
2
hours after L=6 all change to 88m28-66h36-cplr (-cprl on sc2) |
847 |
293 |
||
| 07:45 |
At
M+ o/b all change to 88h58-72m12-cplr (-cprl on sc2) |
847 |
293 |
|||
| 15:45 |
At B+ o/b sc2 changes to 88h58-76m16-cprl |
847 |
293 |
|||
| 31.12.05 |
15:30 |
At B+ i/b sc2 changes to 88h58-72m12-cplr |
847 |
293 |
||
| 21:30 |
At M- i/b sc 1,3,4 power on into 88h58-72m12-cplr, LEEA MCP’s lowered by one level, and sc2 HEEA MCP is raised back up to operational |
847 |
293 |
|||
| 23:15 |
At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational, and sc 1,2,3 power off at L=6 |
01.01.06 |
05:05 |
847 |
293 |
|
| 01.01.06 |
06:15 |
At L=6 o/b sc2 powers on into 88m28-72m12-cprl |
848 |
293 |
||
| 01.01.06 |
06:45 |
At L=6 i/b sc4 powers off |
848 |
294 |
||
| 06:40 |
At L=6 o/b sc 1,3,4 power on into 88m28-72m12-cplr |
848 |
294 |
|||
| 17:15 |
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level |
848 |
294 |
|||
| 19:20 |
At M- o/b + 1 hour sc2,3,4 power off |
848 |
294 |
|||
| 02.01.06 |
01:55 |
At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level |
848 |
294 |
||
| 03.01.06 |
01:30 |
At B+ i/b sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off |
848 |
294 |
||
| 06:45 |
At M- i/b sc 1,2 power on into 88h58-72m12-cplr, MCPs lowered by one level |
848 |
294 |
|||
| 07:15 |
At start of BM sc 1,3 change to 88h58-72m12-cplxt-apl-64w12, and sc2 changes to, and sc4 powers on into, 88h58-72m12-cplxy-apl-nw-aph-nw, MCPs lowered by one level for BM around i/b MP |
848 |
294 |
|||
| 08:45 |
At end of BM sc 1,2,3 change to 88m28-72m12-cplr and MCPs are raised back up to operational; sc4 changes to 88h58-72m12-cplr |
848 |
294 |
|||
| 10:10 |
At M+ i/b sc4 changes to 88m28-72m12-cplr and MCPs are raised back up to operational |
848 |
294 |
|||
| 10:39 |
MCP op level test performed, sensors in 68h38-68h38, 3hr 31 mins before L=6 i/b - sc1 at 10:39; sc2 at 10:14; sc3 at 10:59; sc4 at 12:29 |
848 |
294 |
|||
| 11:10 |
At
end of test all change to 88m28-72m12-cplr
(-cprl on sc2) |
03.01.06 |
14:10 |
848 |
294 |
|
| 03.01.06 |
16:05 |
At L=6 o/b all power on into 88m28-72m12-cplr (-cprl on sc2) |
849 |
294 |
||
| 04.01.06 |
02:05 |
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level |
849 |
294 |
||
| 04:10 |
At M- o/b + 1 hour sc2,3,4 power off |
849 |
294 |
|||
| 10:15 |
At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level |
849 |
294 |
|||
| 10:55 |
At B- o/b sc 2,3,4 power off |
849 |
294 |
|||
| 05.01.06 |
08:00 |
At B- i/b sc 2,3 power on into off-76m16-cpls, LEEA MCP lowered by one level |
849 |
294 |
||
| 09:35 |
At start of BM sc 1,3 change to off-72m12-cpxy-apl-64w12-tnl-nw; sc2 changes to, and sc4 powers on into, off-76m16-cplx-anl-nw for BM around i/b BS |
849 |
294 |
|||
| 11:05 |
At end of BM sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr; sc3,4 to off-76m16-cpls; sc2 powers off |
849 |
294 |
|||
| 11:20 |
At B+ i/b sc3,4 power off |
849 |
294 |
|||
| 15:55 |
At M- i/b sc 2,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level |
849 |
294 |
|||
| 17:40 |
At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational, and all power off at L=6 |
05.01.06 |
23:40 |
849 |
294 |
|
| 06.01.06 |
01:15 |
At L=6 o/b all power on into 88m28-72m12-cplr (-cprl on sc2) |
850 |
294 |
||
| 07:10 |
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level until all power off for manoeuvre firings |
06.01.06 |
11:00 |
850 |
294 |
|
| Manoeuvre firings on all spacecraft (attitude slews) |
||||||
| 06.01.06 |
22:00 |
At end of firings sc1 powers on into off-76m16-cpls, LEEA MCP lowered by one level |
850 |
294 |
||
| 07.01.06 |
17:03 |
At start of BM sc1 changes to, and sc3 powers on into, off-72m12-cpxy-apl-64w12-tnl-nw; sc2,4 change to off-76m16-cplx-anl-nw for BM around i/b BS |
850 |
294 |
||
| 20:45 |
At end of BM sc2 changes to 88h58-72m12-cplr; sc4 to off-76m16-cpls; sc1,3 power off |
850 |
294 |
|||
| 22:00 |
At B+ i/b sc4 powers off |
850 |
294 |
|||
| 08.01.06 |
01:05 |
At M- i/b sc 1,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level |
850 |
294 |
||
| 02:45 |
At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational, and all power off at L=6 |
08.01.06 |
08:20 |
850 |
294 |
|
| 08.01.06 |
09:30 |
At L=6 o/b sc2 powers on into 88m28-72m12-cprl |
851 |
294 |
||
| 08.01.06 |
09:55 |
At L=6 o/b sc 1,3,4 power on into 88m28-72m12-cplr |
851 |
295 |
||
| 18:50 |
At end of cusp sc2 changes to 88h58-72m12-cplr and MCPs are lowered by one level |
851 |
295 |
|||
| 19:20 |
At start of BM sc 1,3 change to 88h58-72m12-cplxt-apl-64w12, sc2,4 change to 88h58-72m12-cplxy-apl-nw-aph-nw, all MCPs lowered by one level, and sc4 changes to 88m28-72m12-cplxy-apl-nw-aph-nw for BM around o/b cusp/MP |
851 |
295 |
|||
| 20:20 |
At end of BM sc 1,2,3 change to 88h58-72m12-cplr; sc4 changes to 88m28-72m12-cplr |
851 |
295 |
|||
| 21:00 |
At end of cusp sc4 changes to 88h58-72m12-cplr and MCPs are lowered by one level |
851 |
295 |
|||
| 21:55 |
At M- o/b + 1 hour sc1,3,4 power off |
851 |
295 |
|||
| 09.01.06 |
03:00 |
At B+ o/b sc2 power cycles to, and sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level |
851 |
295 |
||
| 05:15 |
At B- o/b sc1,3,4 power off |
851 |
295 |
|||
| 10.01.06 |
03:25 |
At B- i/b sc1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level |
851 |
295 |
||
| 05:40 |
At B+ i/b sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 1,3,4 power off |
851 |
295 |
|||
| 10:10 |
At M- i/b 1,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level |
851 |
295 |
|||
| 11:50 |
At M+ i/b all change to 88m28-72m12-cplr and MCPs are raised back up to operational |
851 |
295 |
|||
| 14:19 |
MCP op level test performed, sensors in 68h38-68h38, 3hr 31 mins before L=6 i/b - sc1,3 at 14:19; sc2 at 13:49; sc4 at 15:59 |
851 |
295 |
|||
| 14:50 |
At end of test all change to 88m28-72m12-cplr (-cprl on sc2) |
851 |
295 |
|||
|
|
17:50 |
At L=6 i/b sc 3,4 power off; sc 2,4 change to 88m28-68m08-cplr (-cprl on sc2) with MCP's lowered by one level for WBD ops through perigee |
851 |
295 |
||
|
|
19:07 |
Sc 1,2 power off at end of WBD ops |
851 |
295 |
||
| 10.01.06 |
19:35 |
At L=6 o/b all power on into 88m28-72m12-cplr (-cprl on sc2) |
852 |
295 |
||
| 11.01.06 |
03:00 |
At end of cusp sc3 changes to 88h58-72m12-cplr and MCPs are lowered by one level |
852 |
295 |
||
| 03:30 |
At start of BM sc 1,3 change to 88h58-72m12-cplxt-apl-64w12, sc2,4 change to 88h58-72m12-cplxy-apl-nw-aph-nw, all MCPs lowered by one level for BM around o/b MP |
852 |
295 |
|||
| 06:00 |
At end of BM all change to 88h58-72m12-cplr |
852 |
295 |
|||
| 06:40 |
At M- o/b + 1 hour sc 1,3,4 power off |
852 |
295 |
|||
| 11:20 |
At B+ o/b sc2 power cycles to, and sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level |
852 |
295 |
|||
| 13:30 |
At B- o/b sc 1,3,4 power off |
852 |
295 |
|||
| 12.01.06 |
12:40 |
At B- i/b sc1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level |
852 |
295 |
||
| 14:50 |
At B+ i/b sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 1,3,4 power off |
852 |
295 |
|||
| 19:15 |
At M- i/b sc 1,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level |
852 |
295 |
|||
| 20:55 |
At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational, and sc2 powers off at L=6 |
13.01.06 |
02:20 |
852 |
295 |
|
| 13.01.06 |
02:37 |
Sc 1,3,4 power off for firings at perigee |
852 |
295 |
||
| Manoeuvre firings on all spacecraft (orbit trims) |
||||||
| 13.01.06 |
13:13 |
At end of firings all power on into 88h58-72m12-cplr with MCPs lowered by one level |
853 |
295 |
||
| 15:30 |
At M- o/b + 1 hour sc 1,3,4 power off |
853 |
295 |
|||
| 19:55 |
At B+ o/b sc2 power cycles to, and sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level |
853 |
295 |
|||
| 22:00 |
At B- o/b sc 1,3,4 power off |
853 |
295 |
|||
| 14.01.06 |
22:05 |
At start of BM sc1,3 power on into off-72m12-cpxy-apl-64w12-tnl-nw; sc2 changes to, and sc4 powers on into off-72m12-cplx-anl-nw, LEEA MCP lowered by one level for BM around BS |
853 |
295 |
||
| 15.01.06 |
01:05 |
At end of BM sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr; sc4 to off-76m16-cpls; sc1,3 power off |
853 |
295 |
||
| 01:40 |
At B+ i/b sc4 powers off |
853 |
295 |
|||
| 04:25 |
At M- i/b sc 1,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level |
853 |
295 |
|||
| 06:00 |
At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational, and sc 1,2,3 power off at L=6 |
15.01.06 |
11:35 |
853 |
295 |
|
| 15.01.06 |
13:00 |
At L=6 o/b sc2 powers on into 88m28-72m12-cprl |
854 |
295 |
||
| 15.01.06 |
14:20 |
At L=6 i/b sc4 powers off |
854 |
296 |
||
| 13:30 |
At L=6 o/b sc 1,3,4 power on into 88m28-72m12-cplr |
854 |
296 |
|||
| 22:25 |
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level |
854 |
296 |
|||
| 23:40 |
At M- o/b + 1 hour sc 2,3,4 power off |
854 |
296 |
|||
| 16.01.06 |
03:20 |
At B+ o/b sc 2,3 power on into off-76m16-cpls, LEEA MCP lowered by one level |
854 |
296 |
||
| 04:20 |
At start of BM sc1 power cycles to, and sc3 changes to off-72m12-cpxy-apl-64w12-tnl-nw; sc2 changes to and sc4 powers on into off-72m12-cplx-anl-nw, all LEEA MCPs lowered by one level for BM around BS |
854 |
296 |
|||
| 05:50 |
At end of BM all change to off-76m16-cpls |
854 |
296 |
|||
| 17.01.06 |
09:25 |
At B+ i/b sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off |
854 |
296 |
||
| 12:55 |
At M- i/b sc 2,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level |
854 |
296 |
|||
| 15:05 |
At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational |
854 |
296 |
|||
| 17:39 |
MCP op level test performed, sensors in 68h38-68h38, 3hr 31 mins before L=6 i/b - sc1,3 at 17:39; sc2 at 17:14; sc4 at 19:14 |
854 |
296 |
|||
| 18:10 |
At
end of test all change to 88m28-72m12-cplr
(-cprl on sc2) |
17.01.06 |
21:10 |
854 |
296 |
|
| 17.01.06 |
22:50 |
At L=6 o/b all power on into 88m28-72m12-cplr (-cprl on sc2) |
855 |
296 |
||
| 18.01.06 |
02:15 |
At start of BM sc 1,3 change to 88m28-72m12-cplxt-apl-64w12, sc2,4 change to 88m28-72m12-cplxy-apl-nw-aph-nw for BM around o/b cusp |
855 |
296 |
||
| 05:15 |
At end of BM sc 1,3,4 change to 88h58-72m12-cplr and MCPs are lowered by one level, sc2 changes back to 88m28-72m12-cplr |
855 |
296 |
|||
| 06:00 |
At end of cusp sc2 changes to 88h58-72m12-cplr and MCPs are lowered by one level |
855 |
296 |
|||
| 09:25 |
At M- o/b + 1 hour sc 2,3,4 power off |
855 |
296 |
|||
| 13:15 |
At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level |
855 |
296 |
|||
| 14:05 |
At B- o/b sc 2,3,4 power off |
855 |
296 |
|||
| 19.01.06 |
16:35 |
At B- i/b sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level |
855 |
296 |
||
| 18:40 |
At B+ i/b sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off |
855 |
296 |
|||
| 22:40 |
At M- i/b sc 2,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level |
855 |
296 |
|||
| 20.01.06 |
00:15 |
At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational and all power off at L=6 |
20.01.06 |
05:55 |
855 |
296 |
| 20.01.06 |
07:25 |
At L=6 o/b all power on into 88m28-72m12-cplr |
856 |
296 |
||
| 16:20 |
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level |
856 |
296 |
|||
| 18:15 |
At M- o/b + 1 hour sc 2,3,4 power off |
856 |
296 |
|||
| 21:55 |
At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level |
856 |
296 |
|||
| 22:45 |
At B- o/b sc 2,3,4 power off |
856 |
296 |
|||
| 22.01.06 |
01:35 |
At B- i/b sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level |
856 |
296 |
||
| 03:50 |
At B+ i/b sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off |
856 |
296 |
|||
| 07:15 |
At M- i/b sc 2,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level |
856 |
296 |
|||
| 09:20 |
At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational |
856 |
296 |
|||
| 15:15 |
At L=6 i/b sc3 powers off; sc1,2 change to 88m28-68m08-cplr, MCP’s one below operational, for WBD ops |
856 |
296 |
|||
| 16:40 |
Sc 1,2 power off at end of WBD ops |
856 |
296 |
|||
| 22.01.06 |
17:15 |
Sc4 changes to 88m28-68m08-cplr for WBD ops |
857 |
297 |
||
| 18:15 |
Sc4 powers off at end of WBD ops |
857 |
297 |
|||
| 22.01.06 |
17:05 |
At L=6 o/b all power on into 88m28-72m12-cplr (-cprl on sc2) |
857 |
297 |
||
| 21:40 |
At start of BM sc 1,3 change to 88m28-72m12-cplxt-apl-64w12, sc2,4 change to 88m28-72m12-cplxy-apl-nw-aph-nw for BM around o/b cusp |
857 |
297 |
|||
| 23:10 |
At end of BM all change back to 88m28-72m12-cplr |
857 |
297 |
|||
| 23.01.06 |
01:15 |
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level |
857 |
297 |
||
| 03:10 |
At M- o/b + 1 hour sc 1,3,4 power off |
857 |
297 |
|||
| 06:35 |
At B+ o/b sc2 power cycles to, and sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level |
857 |
297 |
|||
| 08:30 |
At B- o/b sc 1,3,4 power off |
857 |
297 |
|||
| 24.01.06 |
11:10 |
At B- i/b sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level |
857 |
297 |
||
| 13:05 |
At B+ i/b sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 1,3,4 power off |
857 |
297 |
|||
| 16:55 |
At M- i/b sc 1,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level |
857 |
297 |
|||
| 18:30 |
At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational |
857 |
297 |
|||
| 20:54 |
MCP op level test performed, sensors in 68h38-68h38, 3hr 31 mins before L=6 i/b - sc1,3 at 20:54; sc2 at 20:29; sc4 at 22:24 |
857 |
297 |
|||
| 21:25 |
At
end of test all change to 88m28-72m12-cplr
(-cprl on sc2) |
25 |
00:25 |
857 |
297 |
|
| 25.01.06 |
02:00 |
At L=6 o/b all power on into 88m28-72m12-cplr (-cprl on sc2) |
858 |
297 |
||
| 07:25 |
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level |
858 |
297 |
|||
| 12:10 |
At M- o/b + 1 hour sc 1,3,4 power off |
858 |
297 |
|||
| 15:20 |
At B+ o/b sc2 power cycles to, and sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level |
858 |
297 |
|||
| 17:15 |
At B- o/b sc 1,3,4 power off |
858 |
297 |
|||
| 26.01.06 |
20:20 |
At B- i/b sc 1,3 power on into off-76m16-cpls, LEEA MCP lowered by one level |
858 |
297 |
||
| 20:55 |
At start of BM sc 1,3 change to off-72m12-cpxy-apl-64w12-tnl-nw; sc2 changes to and sc4 powers on into off-72m12-cplx-anl-nw, all LEEA MCPs lowered by one level for BM around i/b BS |
858 |
297 |
|||
| 22:25 |
At end of BM sc 1,3 power off; sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; and sc4 changes to off-76m16-cpls |
858 |
297 |
|||
| 23:30 |
At B+ i/b sc4 powers off |
858 |
297 |
|||
| 27.01.06 |
01:55 |
At M- i/b sc 1,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level |
858 |
297 |
||
| 03:30 |
At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational |
858 |
297 |
|||
| 09:05 |
At L=6 i/b sc3 powers off; sc 1,2,4 change to 88m28-68m08-cplr for WBD ops, MCPs lowered by one level |
858 |
297 |
|||
| 10:25 |
Sc1,2 power off at end of WBD ops |
858 |
297 |
|||
| 27.01.06 |
10:50 |
At L=6 o/b sc 1,2,3 power on into, and sc4 changes to, 88m28-72m12-cplr |
859 |
297 |
||
| 13:40 |
Sc4 power cycles to 88m28-72m12-cplr at end of WBD ops |
859 |
297 |
|||
| 18:05 |
At start of BM sc 1,3 change to 88h58-72m12-cplxt-apl-64w12, sc2 changes to 88h58-72m12-cplxy-apl-nw-aph-nw, all MCPs lowered by one level, and sc4 changes to 88m28-72m12-cplxy-apl-nw-aph-nw for BM around o/b cusp/MP |
859 |
297 |
|||
| 19:35 |
At end of BM sc 1,2,3 change to 88h58-72m12-cplr and MCPs are lowered by one level, sc4 changes back to 88m28-72m12-cplr |
859 |
297 |
|||
| 20:30 |
At end of cusp sc4 changes to 88h58-72m12-cplr and MCPs are lowered by one level |
859 |
297 |
|||
| 21:05 |
At M- o/b + 1 hour sc 1,3,4 power off |
859 |
297 |
|||
| 28.01.06 |
00:05 |
At B+ o/b sc2 power cycles to, and sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level |
859 |
297 |
||
| 01:55 |
At B- o/b sc 1,3,4 power off |
859 |
297 |
|||
| 29.01.06 |
05:35 |
At B- i/b sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level |
859 |
297 |
||
| 07:25 |
At B+ i/b sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 1,3,4 power off |
859 |
297 |
|||
| 11:00 |
At M- i/b sc 1,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level |
859 |
297 |
|||
| 12:35 |
At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational and sc 1,2,3 power off at L=6 |
29.01.06 |
18:40 |
859 |
297 |
|
| 29.01.06 |
20:15 |
At L=6 i/b sc4 powers off |
859 |
298 |
||
| 29.01.06 |
20:25 |
At L=6 o/b all power on into 88m28-72m12-cplr |
860 |
298 |
||
| 30.01.06 |
04:10 |
At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level |
860 |
298 |
||
| 05:30 |
At M- o/b + 1 hour sc 2,3,4 power off |
860 |
298 |
|||
| 08:55 |
At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level |
860 |
298 |
|||
| 31.01.06 |
16:30 |
At B+ i/b sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off |
860 |
298 |
||
| 19:20 |
At start of BM Sc1 changes to, and sc3 powers on into, 88h58-72m12-cplxt-apl-64w12; sc2,4 power on into 88h58-72m12-cplxy-apl-nw-aph-nw, MCPs lowered by one level for BM just before i/b MP |
860 |
298 |
|||
| 20:50 |
At end of BM sc 1,2,3 change to 88h58-72m12-cplr, sc4 changes back to 88m28-72m12-cplr |
860 |
298 |
|||
| 21:35 |
At M- i/b sc4 powers on into 88h58-72m12-cplr, MCPs lowered by one level |
860 |
298 |
|||
| 21:40 |
At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational |
860 |
298 |
|||
| 23:59 |
MCP op level test performed, sensors in 68h38-68h38, 3hr 31 mins before L=6 i/b - sc1,2,3 at 23:59 on 31st; sc4 at 01:29 on 1st |
860 |
298 |
|||
| 01.02.06 |
00:30 |
At
end of test all change to 88m28-72m12-cplr
(-cprl on sc2) |
860 |
298 |
||
| 03:30 |
At L=6 i/b sc1,2,3 power off; sc4 changes to 88m28-68m08-cplr, MCPs lowered by one level, for WBD ops |
860 |
298 |
|||