UCL DEPARTMENT OF SPACE & CLIMATE PHYSICS
SPACE PLASMA PHYSICS GROUP
UCL

Group research
    Research
    Missions
About us
    People
    Contact Us
    Meetings
Know our science
Opportunities
    MSSL Jobs


Dec 2005 Sc1 Calendar sc2 sc3 sc4

Power on / Start

Mode

Power off

Orbit #

Planning period

date

time

date

time

29.12.05

22:05

At L=6 o/b all power on into 88m28-72m12-cplr (-cprl on sc2)

   

847

293

30.12.05

00:05

2 hours after L=6 all change to 88m28-66h36-cplr (-cprl on sc2)

   

847

293

 

07:45

At M+ o/b all change to 88h58-72m12-cplr (-cprl on sc2) and LEEA MCPs are lowered by one level

   

847

293

 

15:45

At B+ o/b sc2 changes to 88h58-76m16-cprl

   

847

293

31.12.05

15:30

At B+ i/b sc2 changes to 88h58-72m12-cplr

   

847

293

 

21:30

At M- i/b sc 1,3,4 power on into 88h58-72m12-cplr, LEEA MCP’s lowered by one level, and sc2 HEEA MCP is raised back up to operational

   

847

293

 

23:15

At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational, and sc 1,2,3 power off at L=6

01.01.06

05:05

847

293

01.01.06

06:15

At L=6 o/b sc2 powers on into 88m28-72m12-cprl

   

848

293

01.01.06

06:45

At L=6 i/b sc4 powers off

   

848

294

 

06:40

At L=6 o/b sc 1,3,4 power on into 88m28-72m12-cplr

   

848

294

 

17:15

At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level

   

848

294

 

19:20

At M- o/b + 1 hour sc2,3,4 power off

   

848

294

02.01.06

01:55

At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level

   

848

294

03.01.06

01:30

At B+ i/b sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off

   

848

294

 

06:45

At M- i/b sc 1,2 power on into 88h58-72m12-cplr, MCPs lowered by one level

   

848

294

 

07:15

At start of BM sc 1,3 change to 88h58-72m12-cplxt-apl-64w12, and sc2 changes to, and sc4 powers on into, 88h58-72m12-cplxy-apl-nw-aph-nw, MCPs lowered by one level for BM around i/b MP

   

848

294

 

08:45

At end of BM sc 1,2,3 change to 88m28-72m12-cplr and MCPs are raised back up to operational; sc4 changes to 88h58-72m12-cplr

   

848

294

 

10:10

At M+ i/b sc4 changes to 88m28-72m12-cplr and MCPs are raised back up to operational

   

848

294

 

10:39

MCP op level test performed, sensors in 68h38-68h38, 3hr 31 mins before L=6 i/b - sc1 at 10:39; sc2 at 10:14; sc3 at 10:59; sc4 at 12:29

   

848

294

 

11:10

At end of test all change to 88m28-72m12-cplr (-cprl on sc2) and all power off at L=6

03.01.06

14:10

848

294

03.01.06

16:05

At L=6 o/b all power on into 88m28-72m12-cplr (-cprl on sc2)

   

849

294

04.01.06

02:05

At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level

   

849

294

 

04:10

At M- o/b + 1 hour sc2,3,4 power off

   

849

294

 

10:15

At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level

   

849

294

 

10:55

At B- o/b sc 2,3,4 power off

   

849

294

05.01.06

08:00

At B- i/b sc 2,3 power on into off-76m16-cpls, LEEA MCP lowered by one level

   

849

294

 

09:35

At start of BM sc 1,3 change to off-72m12-cpxy-apl-64w12-tnl-nw; sc2 changes to, and sc4 powers on into, off-76m16-cplx-anl-nw for BM around i/b BS

   

849

294

 

11:05

At end of BM sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr; sc3,4 to off-76m16-cpls; sc2 powers off

   

849

294

 

11:20

At B+ i/b sc3,4 power off

   

849

294

 

15:55

At M- i/b sc 2,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level

   

849

294

 

17:40

At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational, and all power off at L=6

05.01.06

23:40

849

294

06.01.06

01:15

At L=6 o/b all power on into 88m28-72m12-cplr (-cprl on sc2)

   

850

294

 

07:10

At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level until all power off for manoeuvre firings

06.01.06

11:00

850

294

   

Manoeuvre firings on all spacecraft (attitude slews)

       

06.01.06

22:00

At end of firings sc1 powers on into off-76m16-cpls, LEEA MCP lowered by one level

   

850

294

07.01.06

17:03

At start of BM sc1 changes to, and sc3 powers on into, off-72m12-cpxy-apl-64w12-tnl-nw; sc2,4 change to off-76m16-cplx-anl-nw for BM around i/b BS

   

850

294

 

20:45

At end of BM sc2 changes to 88h58-72m12-cplr; sc4 to off-76m16-cpls; sc1,3 power off

   

850

294

 

22:00

At B+ i/b sc4 powers off

   

850

294

08.01.06

01:05

At M- i/b sc 1,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level

   

850

294

 

02:45

At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational, and all power off at L=6

08.01.06

08:20

850

294

08.01.06

09:30

At L=6 o/b sc2 powers on into 88m28-72m12-cprl

   

851

294

08.01.06

09:55

At L=6 o/b sc 1,3,4 power on into 88m28-72m12-cplr

   

851

295

 

18:50

At end of cusp sc2 changes to 88h58-72m12-cplr and MCPs are lowered by one level

   

851

295

 

19:20

At start of BM sc 1,3 change to 88h58-72m12-cplxt-apl-64w12, sc2,4 change to 88h58-72m12-cplxy-apl-nw-aph-nw, all MCPs lowered by one level, and sc4 changes to 88m28-72m12-cplxy-apl-nw-aph-nw for BM around o/b cusp/MP

   

851

295

 

20:20

At end of BM sc 1,2,3 change to 88h58-72m12-cplr; sc4 changes to 88m28-72m12-cplr

   

851

295

 

21:00

At end of cusp sc4 changes to 88h58-72m12-cplr and MCPs are lowered by one level

   

851

295

 

21:55

At M- o/b + 1 hour sc1,3,4 power off

   

851

295

09.01.06

03:00

At B+ o/b sc2 power cycles to, and sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level

   

851

295

 

05:15

At B- o/b sc1,3,4 power off

   

851

295

10.01.06

03:25

At B- i/b sc1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level

   

851

295

 

05:40

At B+ i/b sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 1,3,4 power off

   

851

295

 

10:10

At M- i/b 1,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level

   

851

295

 

11:50

At M+ i/b all change to 88m28-72m12-cplr and MCPs are raised back up to operational

   

851

295

 

14:19

MCP op level test performed, sensors in 68h38-68h38, 3hr 31 mins before L=6 i/b - sc1,3 at 14:19; sc2 at 13:49; sc4 at 15:59

   

851

295

 

14:50

At end of test all change to 88m28-72m12-cplr (-cprl on sc2)

   

851

295

 

17:50

At L=6 i/b sc 3,4 power off; sc 2,4 change to 88m28-68m08-cplr (-cprl on sc2) with MCP's lowered by one level for WBD ops through perigee

   

851

295

 

19:07

Sc 1,2 power off at end of WBD ops

   

851

295

10.01.06

19:35

At L=6 o/b all power on into 88m28-72m12-cplr (-cprl on sc2)

   

852

295

11.01.06

03:00

At end of cusp sc3 changes to 88h58-72m12-cplr and MCPs are lowered by one level

   

852

295

 

03:30

At start of BM sc 1,3 change to 88h58-72m12-cplxt-apl-64w12, sc2,4 change to 88h58-72m12-cplxy-apl-nw-aph-nw, all MCPs lowered by one level for BM around o/b MP

   

852

295

 

06:00

At end of BM all change to 88h58-72m12-cplr

   

852

295

 

06:40

At M- o/b + 1 hour sc 1,3,4 power off

   

852

295

 

11:20

At B+ o/b sc2 power cycles to, and sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level

   

852

295

 

13:30

At B- o/b sc 1,3,4 power off

   

852

295

12.01.06

12:40

At B- i/b sc1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level

   

852

295

 

14:50

At B+ i/b sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 1,3,4 power off

   

852

295

 

19:15

At M- i/b sc 1,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level

   

852

295

 

20:55

At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational, and sc2 powers off at L=6

13.01.06

02:20

852

295

13.01.06

02:37

Sc 1,3,4 power off for firings at perigee

   

852

295

   

Manoeuvre firings on all spacecraft (orbit trims)

       

13.01.06

13:13

At end of firings all power on into 88h58-72m12-cplr with MCPs lowered by one level

   

853

295

 

15:30

At M- o/b + 1 hour sc 1,3,4 power off

   

853

295

 

19:55

At B+ o/b sc2 power cycles to, and sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level

   

853

295

 

22:00

At B- o/b sc 1,3,4 power off

   

853

295

14.01.06

22:05

At start of BM sc1,3 power on into off-72m12-cpxy-apl-64w12-tnl-nw; sc2 changes to, and sc4 powers on into off-72m12-cplx-anl-nw, LEEA MCP lowered by one level for BM around BS

   

853

295

15.01.06

01:05

At end of BM sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr; sc4 to off-76m16-cpls; sc1,3 power off

   

853

295

 

01:40

At B+ i/b sc4 powers off

   

853

295

 

04:25

At M- i/b sc 1,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level

   

853

295

 

06:00

At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational, and sc 1,2,3 power off at L=6

15.01.06

11:35

853

295

15.01.06

13:00

At L=6 o/b sc2 powers on into 88m28-72m12-cprl

   

854

295

15.01.06

14:20

At L=6 i/b sc4 powers off

   

854

296

 

13:30

At L=6 o/b sc 1,3,4 power on into 88m28-72m12-cplr

   

854

296

 

22:25

At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level

   

854

296

 

23:40

At M- o/b + 1 hour sc 2,3,4 power off

   

854

296

16.01.06

03:20

At B+ o/b sc 2,3 power on into off-76m16-cpls, LEEA MCP lowered by one level

   

854

296

 

04:20

At start of BM sc1 power cycles to, and sc3 changes to off-72m12-cpxy-apl-64w12-tnl-nw; sc2 changes to and sc4 powers on into off-72m12-cplx-anl-nw, all LEEA MCPs lowered by one level for BM around BS

   

854

296

 

05:50

At end of BM all change to off-76m16-cpls

   

854

296

17.01.06

09:25

At B+ i/b sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off

   

854

296

 

12:55

At M- i/b sc 2,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level

   

854

296

 

15:05

At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational

   

854

296

 

17:39

MCP op level test performed, sensors in 68h38-68h38, 3hr 31 mins before L=6 i/b - sc1,3 at 17:39; sc2 at 17:14; sc4 at 19:14

   

854

296

 

18:10

At end of test all change to 88m28-72m12-cplr (-cprl on sc2) and all power off at L=6

17.01.06

21:10

854

296

17.01.06

22:50

At L=6 o/b all power on into 88m28-72m12-cplr (-cprl on sc2)

   

855

296

18.01.06

02:15

At start of BM sc 1,3 change to 88m28-72m12-cplxt-apl-64w12, sc2,4 change to 88m28-72m12-cplxy-apl-nw-aph-nw for BM around o/b cusp

   

855

296

 

05:15

At end of BM sc 1,3,4 change to 88h58-72m12-cplr and MCPs are lowered by one level, sc2 changes back to 88m28-72m12-cplr

   

855

296

 

06:00

At end of cusp sc2 changes to 88h58-72m12-cplr and MCPs are lowered by one level

   

855

296

 

09:25

At M- o/b + 1 hour sc 2,3,4 power off

   

855

296

 

13:15

At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level

   

855

296

 

14:05

At B- o/b sc 2,3,4 power off

   

855

296

19.01.06

16:35

At B- i/b sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level

   

855

296

 

18:40

At B+ i/b sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off

   

855

296

 

22:40

At M- i/b sc 2,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level

   

855

296

20.01.06

00:15

At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational and all power off at L=6

20.01.06

05:55

855

296

20.01.06

07:25

At L=6 o/b all power on into 88m28-72m12-cplr

   

856

296

 

16:20

At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level

   

856

296

 

18:15

At M- o/b + 1 hour sc 2,3,4 power off

   

856

296

 

21:55

At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level

   

856

296

 

22:45

At B- o/b sc 2,3,4 power off

   

856

296

22.01.06

01:35

At B- i/b sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level

   

856

296

 

03:50

At B+ i/b sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off

   

856

296

 

07:15

At M- i/b sc 2,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level

   

856

296

 

09:20

At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational

   

856

296

 

15:15

At L=6 i/b sc3 powers off; sc1,2 change to 88m28-68m08-cplr, MCP’s one below operational, for WBD ops

   

856

296

 

16:40

Sc 1,2 power off at end of WBD ops

   

856

296

22.01.06

17:15

Sc4 changes to 88m28-68m08-cplr for WBD ops

   

857

297

 

18:15

Sc4 powers off at end of WBD ops

   

857

297

22.01.06

17:05

At L=6 o/b all power on into 88m28-72m12-cplr (-cprl on sc2)

   

857

297

 

21:40

At start of BM sc 1,3 change to 88m28-72m12-cplxt-apl-64w12, sc2,4 change to 88m28-72m12-cplxy-apl-nw-aph-nw for BM around o/b cusp

   

857

297

 

23:10

At end of BM all change back to 88m28-72m12-cplr

   

857

297

23.01.06

01:15

At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level

   

857

297

 

03:10

At M- o/b + 1 hour sc 1,3,4 power off

   

857

297

 

06:35

At B+ o/b sc2 power cycles to, and sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level

   

857

297

 

08:30

At B- o/b sc 1,3,4 power off

   

857

297

24.01.06

11:10

At B- i/b sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level

   

857

297

 

13:05

At B+ i/b sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 1,3,4 power off

   

857

297

 

16:55

At M- i/b sc 1,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level

   

857

297

 

18:30

At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational

   

857

297

 

20:54

MCP op level test performed, sensors in 68h38-68h38, 3hr 31 mins before L=6 i/b - sc1,3 at 20:54; sc2 at 20:29; sc4 at 22:24

   

857

297

 

21:25

At end of test all change to 88m28-72m12-cplr (-cprl on sc2) and all power off at L=6

25

00:25

857

297

25.01.06

02:00

At L=6 o/b all power on into 88m28-72m12-cplr (-cprl on sc2)

   

858

297

 

07:25

At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level

   

858

297

 

12:10

At M- o/b + 1 hour sc 1,3,4 power off

   

858

297

 

15:20

At B+ o/b sc2 power cycles to, and sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level

   

858

297

 

17:15

At B- o/b sc 1,3,4 power off

   

858

297

26.01.06

20:20

At B- i/b sc 1,3 power on into off-76m16-cpls, LEEA MCP lowered by one level

   

858

297

 

20:55

At start of BM sc 1,3 change to off-72m12-cpxy-apl-64w12-tnl-nw; sc2 changes to and sc4 powers on into off-72m12-cplx-anl-nw, all LEEA MCPs lowered by one level for BM around i/b BS

   

858

297

 

22:25

At end of BM sc 1,3 power off; sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; and sc4 changes to off-76m16-cpls

   

858

297

 

23:30

At B+ i/b sc4 powers off

   

858

297

27.01.06

01:55

At M- i/b sc 1,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level

   

858

297

 

03:30

At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational

   

858

297

 

09:05

At L=6 i/b sc3 powers off; sc 1,2,4 change to 88m28-68m08-cplr for WBD ops, MCPs lowered by one level

   

858

297

 

10:25

Sc1,2 power off at end of WBD ops

   

858

297

27.01.06

10:50

At L=6 o/b sc 1,2,3 power on into, and sc4 changes to, 88m28-72m12-cplr

   

859

297

 

13:40

Sc4 power cycles to 88m28-72m12-cplr at end of WBD ops

   

859

297

 

18:05

At start of BM sc 1,3 change to 88h58-72m12-cplxt-apl-64w12, sc2 changes to 88h58-72m12-cplxy-apl-nw-aph-nw, all MCPs lowered by one level, and sc4 changes to 88m28-72m12-cplxy-apl-nw-aph-nw for BM around o/b cusp/MP

   

859

297

 

19:35

At end of BM sc 1,2,3 change to 88h58-72m12-cplr and MCPs are lowered by one level, sc4 changes back to 88m28-72m12-cplr

   

859

297

 

20:30

At end of cusp sc4 changes to 88h58-72m12-cplr and MCPs are lowered by one level

   

859

297

 

21:05

At M- o/b + 1 hour sc 1,3,4 power off

   

859

297

28.01.06

00:05

At B+ o/b sc2 power cycles to, and sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level

   

859

297

 

01:55

At B- o/b sc 1,3,4 power off

   

859

297

29.01.06

05:35

At B- i/b sc 1,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level

   

859

297

 

07:25

At B+ i/b sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 1,3,4 power off

   

859

297

 

11:00

At M- i/b sc 1,3,4 power on into 88h58-72m12-cplr, MCPs lowered by one level

   

859

297

 

12:35

At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational and sc 1,2,3 power off at L=6

29.01.06

18:40

859

297

29.01.06

20:15

At L=6 i/b sc4 powers off

   

859

298

29.01.06

20:25

At L=6 o/b all power on into 88m28-72m12-cplr

   

860

298

30.01.06

04:10

At end of cusp all change to 88h58-72m12-cplr and MCPs are lowered by one level

   

860

298

 

05:30

At M- o/b + 1 hour sc 2,3,4 power off

   

860

298

 

08:55

At B+ o/b sc1 power cycles to, and sc 2,3,4 power on into off-76m16-cpls, LEEA MCP lowered by one level

   

860

298

31.01.06

16:30

At B+ i/b sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs lowered by one level; sc 2,3,4 power off

   

860

298

 

19:20

At start of BM Sc1 changes to, and sc3 powers on into, 88h58-72m12-cplxt-apl-64w12; sc2,4 power on into 88h58-72m12-cplxy-apl-nw-aph-nw, MCPs lowered by one level for BM just before i/b MP

   

860

298

 

20:50

At end of BM sc 1,2,3 change to 88h58-72m12-cplr, sc4 changes back to 88m28-72m12-cplr

   

860

298

 

21:35

At M- i/b sc4 powers on into 88h58-72m12-cplr, MCPs lowered by one level

   

860

298

 

21:40

At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational

   

860

298

 

23:59

MCP op level test performed, sensors in 68h38-68h38, 3hr 31 mins before L=6 i/b - sc1,2,3 at 23:59 on 31st; sc4 at 01:29 on 1st

   

860

298

01.02.06

00:30

At end of test all change to 88m28-72m12-cplr (-cprl on sc2)

   

860

298

 

03:30

At L=6 i/b sc1,2,3 power off; sc4 changes to 88m28-68m08-cplr, MCPs lowered by one level, for WBD ops

   

860

298


Mullard Space Science Laboratory - Holmbury St. Mary - Dorking - Surrey - RH5 6NT - Telephone: +44 (0)1483 204100 - Copyright © 1999-2009 UCL


Search by Google