UCL DEPARTMENT OF SPACE & CLIMATE PHYSICS
SPACE PLASMA PHYSICS GROUP
UCL

Group research
    Research
    Missions
About us
    People
    Contact Us
    Meetings
Know our science
Opportunities
    MSSL Jobs


Nov 2005 Sc1 Calendar sc2 sc3 sc4

Power on / Start

Mode

Power off

Orbit #

Planning period

date

time

date

time

28.11.05

23:50

At L=6 o/b all power on into 88m28-72m12-cplr (-cprl on sc2)

   

834

289

29.11.05

01:50

2 hours after L=6 all change to 88m28-66h36-cplr (-cprl on sc2)

   

834

289

 

16:50

At M+ o/b all change to 88h58-76m16-cplr (-cprl on sc2) and LEEA MCPs are lowered by one level

   

834

289

 

16:58

At start of BM sc1,3 change to 88h58-76m16-cplxt-apl-68w16, sc2,4 to 88h58-76m16-cplxy-apl-nw-aph-nw for BM through MP

   

834

289

 

17:52

At end of BM all change back to 88h58-76m16-cplr (-cprl on sc2)

   

834

289

 

20:30

At M- o/b sc1,3,4 power off and sc2 HEEA MCP is lowered by one level

   

834

289

30.11.05

21:55

At M- i/b sc1,3,4 power on into 88h58-76m16-cplr (-cprl on sc2), LEEA MCP lowered by one level, and sc2 HEEA MCP is raised back up to operational

   

834

289

01.12.05

00:30

At M+ i/b all LEEA MCPs are raised back up to operational

   

834

289

 

04:15

At start of i/b cusp all change to 88m28-72m12-cplr (-cprl on sc2)

   

834

289

 

07:36

At start of eclipse sc4 changes to 88m28-60m00-cplr with internal sunpulse

   

834

289

 

08:00

At end of eclipse sc4 changes back to 88m28-72m12-cplr with external sunpulse

   

834

289

 

06:55

At L=6 i/b all power off

   

834

289

01.12.05

08:25

At L=6 o/b sc1,2 power on into 88m28-72m12-cplr (-cprl on sc2), sc3 into 88m28-68m08-cplxs-aph-80w28

   

835

289

 

08:50

At start of BM sc1 changes to 88m28-68m08-cplxt-apl-60w08, sc2 to 88m28-68m08-cplxy-apl-nw-aph-nw

   

835

289

 

09:20

Sc3 changes to 88m28-68m08-cplxt-apl-60w08 at start of cusp

   

835

289

 

09:44

At end of BM sc 1,2,3 change back to 88m28-72m12-cplr (-cprl on sc2)

   

835

289

 

10:10

At L=6 o/b sc4 powers on into 88m28-72m12-cplr

   

835

289

 

10:25

2 hours after L=6 all change to 88m28-66h36-cplr (-cprl on sc2)

   

835

289

02.12.05

01:05

At M+ o/b all change to 88h58-76m16-cplr (-cprl on sc2) and LEEA MCPs are lowered by one level

   

835

289

 

04:30

At M- o/b sc1,3,4 power off and sc2 HEEA MCP is lowered by one level

   

835

289

03.12.05

07:05

At M- i/b sc1,3,4 power on into 88h58-76m16-cplr (-cprl on sc2), LEEA MCP lowered by one level, and sc2 HEEA MCP is raised back up to operational

   

835

289

 

09:35

At M+ i/b all LEEA MCPs are raised back up to operational

   

835

289

 

12:05

At start of i/b cusp all change to 88m28-72m12-cplr (-cprl on sc2) and sc 1,2,3 power off at L=6

03.12.05

15:50

835

289

03.12.05

17:10

At L=6 o/b sc2 powers on into 88m28-72m12-cprl

   

836

289

   

From pp290 onwards, CL4 MCP levels re-set to:  HEEA 28, LEEA 27

       

03.12.05

17:55

At L=6 i/b sc4 powers off

   

835

290

 

17:45

At L=6 o/b sc1,3,4 power on into 88m28-72m12-cplr

   

836

290

 

19:45

2 hours after L=6 all change to 88m28-66h36-cplr (-cprl on sc2)

   

836

290

04.12.05

07:15

At M+ o/b sc2,3 change to 88h58-76m16-cplr (-cprl on sc2) and LEEA MCPs are lowered by one level

   

836

290

 

08:56

At start of BM sc1,3 change to 88h58-76m16-cplxt-apl-68w16, sc2,4 to 88h58-76m16-cplxy-apl-nw-aph-nw, and sc 1,4 LEEA MCPs are lowered by one level for BM through o/b MP

   

836

290

 

10:44

At end of BM sc1,3,4 change back to 88h58-76m16-cplr;  sc2 powers off

   

836

290

 

12:30

At M- o/b sc3,4 power off and sc1 HEEA MCP is lowered by one level

   

836

290

05.12.05

16:30

At M- i/b sc2,3,4 power on into 88h58-76m16-cplr (-cprl on sc2), LEEA MCP lowered by one level, and sc1 HEEA MCP is raised back up to operational

   

836

290

 

18:50

At M+ i/b all LEEA MCPs are raised back up to operational

   

836

290

 

21:34

MCP op level test performed, sensors in 68h38-68h38, 1hr 31 mins before start of cusp - sc1,3 at 21:34; sc2 at 21:04; sc4 at 22:59

   

836

290

 

22:05

At end of test all change to 88h58-76m16-cplr (-cprl on sc2)

   

836

290

 

23:05

At start of i/b cusp all change to 88m28-72m12-cplr (-cprl on sc2) and all power off at L=6

06.12.05

01:20

836

290

06.12.05

03:00

At L=6 o/b all power on into 88m28-72m12-cplr (-cprl on sc2)

   

837

290

 

05:00

2 hours after L=6 all change to 88m28-66h36-cplr (-cprl on sc2)

   

837

290

 

17:45

At M+ o/b all change to 88h58-76m16-cplr (-cprl on sc2) and LEEA MCPs are lowered by one level

   

837

290

 

20:45

At M- o/b sc2,3,4 power off and sc1 HEEA MCP is lowered by one level

   

837

290

08.12.05

01:45

At M- i/b sc2,3,4 power on into 88h58-76m16-cplr (-cprl on sc2), LEEA MCP lowered by one level, and sc1 HEEA MCP is raised back up to operational

   

837

290

 

04:05

At M+ i/b all LEEA MCPs are raised back up to operational

   

837

290

 

06:55

At start of i/b cusp all change to 88m28-72m12-cplr (-cprl on sc2) and all power off at L=6

08.12.05

10:00

837

290

08.12.05

11:40

At L=6 o/b all power on into 88m28-72m12-cplr (-cprl on sc2)

   

838

290

 

13:40

2 hours after L=6 all change to 88m28-66h36-cplr (-cprl on sc2)

   

838

290

09.12.05

02:05

At M+ o/b all change to 88h58-76m16-cplr (-cprl on sc2) and LEEA MCPs are lowered by one level

   

838

290

 

04:55

At M- o/b sc2,3,4 power off and sc1 HEEA MCP is lowered by one level

   

838

290

10.12.05

11:05

At M- i/b sc2,3,4 power on into 88h58-76m16-cplr (-cprl on sc2), LEEA MCP lowered by one level, and sc1 HEEA MCP is raised back up to operational

   

838

290

 

13:20

At M+ i/b all LEEA MCPs are raised back up to operational

   

838

290

 

15:40

At start of i/b cusp all change to 88m28-72m12-cplr (-cprl on sc2)

   

838

290

 

18:23

At start of BM sc1 changes to 88m28-68m08-cplxs-aph-80w28, sc2,4 to 88m28-68m08-cplxy-apl-nw-aph-nw, and sc3 to 88m28-68m08-cplxt-apl-60w08 for BM in i/b cusp/auroral zone

   

838

290

 

18:40

Sc3 changes to 88m28-68m08-cplxs-aph-80w28 at end of cusp

   

838

290

 

19:00

At L=6 i/b sc2 powers off

   

838

290

 

19:17

At end of BM sc 1,3,4 change back to 88m28-72m12-cplr (-cprl on sc2) and sc 1,3 power off at L=6

10.12.05

19:35

838

290

10.12.05

21:25

At L=6 i/b sc4 powers off

   

838

291

 

21:20

At L=6 o/b all power on into 88m28-72m12-cplr

   

839

291

 

23:20

2 hours after L=6 all change to 88m28-66h36-cplr (-cprl on sc2)

   

839

291

11.12.05

08:45

At M+ o/b sc2,3 change to 88h58-76m16-cplr (-cprl on sc2) and LEEA MCPs are lowered by one level

   

839

291

 

10:38

At start of BM sc1,3 change to 88h58-76m16-cplxt-apl-68w16, sc2,4 to 88h58-76m16-cplxy-apl-nw-aph-nw, and sc 1,4 LEEA MCPs are lowered by one level for BM through o/b MP

   

839

291

 

11:32

At end of BM all change back to 88h58-76m16-cplr and sc2 HEEA MCP is lowered by one level

   

839

291

 

13:10

At M- o/b sc1,3,4 power off

   

839

291

12.12.05

20:15

At M- i/b sc1,3,4 power on into 88h58-76m16-cplr (-cprl on sc2), LEEA MCP lowered by one level, and sc2 HEEA MCP is raised back up to operational

   

839

291

 

22:20

At M+ i/b all LEEA MCPs are raised back up to operational

   

839

291

13.12.05

00:29

MCP op level test performed, sensors in 68h38-68h38, 1hr 31 mins before start of cusp - sc1,3 at 00:29; sc2 at 00:04; sc4 at 01:39

   

839

291

 

01:00

At end of test all change to 88h58-76m16-cplr (-cprl on sc2)

   

839

291

 

02:05

At start of i/b cusp all change to 88m28-72m12-cplr (-cprl on sc2) and all power off at L=6

13.12.05

04:30

839

291

13.12.05

06:05

At L=6 o/b all power on into 88m28-72m12-cplr (-cprl on sc2)

   

840

291

 

08:05

2 hours after L=6 all change to 88m28-66h36-cplr (-cprl on sc2)

   

840

291

 

19:00

At M+ o/b all change to 88h58-76m16-cplr (-cprl on sc2) and LEEA MCPs are lowered by one level

   

840

291

 

21:30

At M- o/b sc1,3,4 power off and sc2 HEEA MCP is lowered by one level

   

840

291

14.12.05

12:30

At B+ o/b (centroid) sc1 powers on into 88h58-76m16-cplr with MCPs lowered by one level

   

840

291

 

18:40

At B+ i/b sc1 powers off

   

840

291

15.12.05

05:30

At M- i/b sc1,3,4 power on into 88h58-76m16-cplr (-cprl on sc2), LEEA MCP lowered by one level, and sc2 HEEA MCP is raised back up to operational

   

840

291

 

07:30

At M+ i/b all LEEA MCPs are raised back up to operational

   

840

291

 

09:45

At start of i/b cusp all change to 88m28-72m12-cplr (-cprl on sc2) and all power off at L=6

15.12.05

13:15

840

291

15.12.05

15:05

At L=6 o/b all power on into 88m28-72m12-cplr (-cprl on sc2)

   

841

291

 

17:05

2 hours after L=6 all change to 88m28-66h36-cplr (-cprl on sc2)

   

841

291

16.12.05

03:30

At M+ o/b all change to 88h58-76m16-cplr (-cprl on sc2) and LEEA MCPs are lowered by one level

   

841

291

 

05:55

At M- o/b sc1,3,4 power off and sc2 HEEA MCP is lowered by one level

   

841

291

 

18:35

At B+ o/b sc1,3,4 power on into 88h58-76m16-cplr with MCPs lowered by one level

   

841

291

 

23:01

Sc 1,3 change to 88m28-72m12-cplxt-apl-64w12, sc 2,4 to 88m28-72m12-cplxy-apl-nw-aph-nw for possible BS-skimming BM

   

841

291

17.12.05

01:25

All change back to 88h58-76m16-cplr (-cprl on sc2) at end of BM

   

841

291

 

05:05

At B+ i/b sc1,3,4 power off

   

841

291

 

14:40

At M- i/b sc1,3,4 power on into 88h58-76m16-cplr (-cprl on sc2), LEEA MCP lowered by one level, and sc2 HEEA MCP is raised back up to operational

   

841

291

 

16:40

At M+ i/b all LEEA MCPs are raised back up to operational

   

841

291

 

20:15

At start of i/b cusp all change to 88m28-72m12-cplr (-cprl on sc2) and sc 1,2,3 power off at L=6 i/b

17.12.05

22:50

841

291

18.12.05

00:00

At L=6 o/b sc2 powers on into 88m28-72m12-cprl

   

842

291

17.12.05

00:35

At L=6 i/b sc4 powers off

   

841

292

18.12.05

00:30

At L=6 o/b all power on into 88m28-72m12-cplr

   

842

292

 

02:30

2 hours after L=6 all change to 88m28-66h36-cplr (-cprl on sc2)

   

842

292

 

10:40

At M+ o/b sc2 changes to 88h58-76m16-cprl and LEEA MCP is lowered by one level

   

842

292

 

11:37

At start of BM sc1,3 change to 88h58-76m16-cplxt-apl-68w16, sc2,4 to 88h58-76m16-cplxy-apl-nw-aph-nw, and sc 1,3,4 LEEA MCPs are lowered by one level for BM through o/b MP

   

842

292

 

13:52

At end of BM sc1,2,4 change back to 88h58-76m16-cplr, sc3 powers off

   

842

292

 

14:30

At M- o/b sc1,4 power off; sc2 HEEA MCP is lowered by one level

   

842

292

19.12.05

23:50

At M- i/b sc1,3,4 power on into 88h58-76m16-cplr (-cprl on sc2), LEEA MCP lowered by one level, and sc2 HEEA MCP is raised back up to operational

   

842

292

20.12.05

01:45

At M+ i/b all LEEA MCPs are raised back up to operational

   

842

292

 

03:09

MCP op level test performed, sensors in 68h38-68h38, 1hr 31 mins before start of cusp - sc1 at 03:09; sc2 at 02:39; sc3 at 02:54; sc4 at 04:09

   

842

292

 

03:40

At end of test all change to 88h58-76m16-cplr (-cprl on sc2)

   

842

292

 

04:40

At start of i/b cusp all change to 88m28-72m12-cplr (-cprl on sc2) and all power off at L=6

20.12.05

07:35

842

292

20.12.05

09:05

At L=6 o/b all power on into 88m28-72m12-cplr (-cprl on sc2)

   

843

292

 

11:05

2 hours after L=6 all change to 88m28-66h36-cplr (-cprl on sc2)

   

843

292

 

20:50

At M+ o/b all change to 88h58-76m16-cplr (-cprl on sc2) and LEEA MCPs are lowered by one level

   

843

292

 

23:05

At M- o/b sc2,3,4 power off and sc1 HEEA MCP is lowered by one level

   

843

292

21.12.05

17:17

6 hours before start of BM sc2,3,4 power on into 88h58-76m16-cplr with MCPs lowered by one level

   

843

292

 

23:17

Sc1,3 change to 88h58-72m12-cplxt-apl-64w12, sc2,4 to 88h58-72m12-cplxy-apl-nw-aph-nw, and sc 1,3,4 LEEA MCPs are lowered by one level for BM through i/b BS

   

843

292

22.12.05

01:32

At end of BM sc1 changes to 88h58-76m16-cplr, sc2,3,4 power off

   

843

292

 

09:00

At M- i/b sc2,3,4 power on into 88h58-76m16-cplr (-cprl on sc2), LEEA MCP lowered by one level, and sc1 HEEA MCP is raised back up to operational

   

843

292

 

10:55

At M+ i/b all LEEA MCPs are raised back up to operational

   

843

292

 

12:55

At start of i/b cusp all change to 88m28-72m12-cplr (-cprl on sc2) and all power off at L=6

22.12.05

16:50

843

292

22.12.05

18:40

At L=6 o/b all power on into 88m28-72m12-cplr (-cprl on sc2)

   

844

292

 

20:40

2 hours after L=6 all change to 88m28-66h36-cplr (-cprl on sc2)

   

844

292

23.12.05

05:35

At M+ o/b all change to 88h58-76m16-cplr (-cprl on sc2) and LEEA MCPs are lowered by one level

   

844

292

 

07:45

At M- o/b sc2,3,4 power off and sc1 HEEA MCP is lowered by one level

   

844

292

24.12.05

18:05

At M- i/b sc2,3,4 power on into 88h58-76m16-cplr (-cprl on sc2), LEEA MCP lowered by one level, and sc1 HEEA MCP is raised back up to operational

   

844

292

 

20:00

At M+ i/b all LEEA MCPs are raised back up to operational

   

844

292

 

23:50

At start of i/b cusp all change to 88m28-72m12-cplr (-cprl on sc2) and sc 1,2,3 power off at L=6 i/b

25.12.05

02:05

844

292

25.12.05

03:10

At L=6 o/b sc2 powers on into 88m28-72m12-cprl

   

845

292

25.12.05

03:40

At L=6 i/b sc4 powers off

   

844

293

 

03:40

At L=6 o/b sc 1,3,4 power on into 88m28-72m12-cplr

   

845

293

 

05:40

2 hours after L=6 all change to 88m28-66h36-cplr (-cprl on sc2)

   

845

293

 

14:15

At M+ o/b sc1,2,3 change to 88h58-72m12-cplr (-cprl on sc2) and LEEA MCPs are lowered by one level

   

845

293

 

14:25

At start of BM sc1,3 change to 88h58-72m12-cplxt-apl-64w12, sc2,4 to 88h58-72m12-cplxy-apl-nw-aph-nw, and sc4 LEEA MCP is lowered by one level for BM through o/b MP

   

845

293

 

15:25

At end of BM all change back to 88h58-72m12-cplr (-cprl on sc2), sc2 HEEA MCP is lowered by 1 level

   

845

293

 

16:20

At M- o/b sc1,3,4 power off

   

845

293

 

23:35

At B+ o/b sc2 changes to 88h58-76m16-cprl

   

845

293

26.12.05

20:25

At B+ i/b sc2 changes to 88h58-72m12-cplr

   

845

293

27.12.05

03:20

At M- i/b sc 1,3 power on into 88h58-72m12-cplr, LEEA MCP’s lowered by one level, and sc2 HEEA MCP is raised back up to operational

   

845

293

 

04:25

At start of BM sc 1,3 change to 88h58-72m12-cplxt-apl-64w12, and sc2 changes to, and sc4 powers on into, 88h58-72m12-cplxy-apl-nw-aph-nw for BM around i/b MP

   

845

293

 

05:10

All change back to 88h58-72m12-cplr, sc 1,2 LEEA MCP’s are raised back up to operational at end of BM

   

845

293

27.12.05

05:25

At M+ i/b sc3,4 LEEA MCPs are raised back up to operational

   

845

293

 

07:14

MCP op level test performed, sensors in 68h38-68h38, 3hr 31 mins before L=6 i/b - sc1 at 07:14; sc2 at 06:44; sc3 at 07:29; sc4 at 08:59

   

845

293

 

07:45

At end of test all change to 88m28-72m12-cplr (-cprl on sc2) and all power off at L=6

27.12.05

10:45

845

293

27.12.05

12:30

At L=6 o/b all power on into 88m28-72m12-cplr (-cprl on sc2)

   

846

293

 

14:30

2 hours after L=6 all change to 88m28-66h36-cplr (-cprl on sc2)

   

846

293

 

22:55

At M+ o/b all change to 88h58-72m12-cplr (-cprl on sc2) and LEEA MCPs are lowered by one level

   

846

293

28.12.05

00:55

At M- o/b sc1,3,4 power off and sc2 HEEA MCP is lowered by one level

   

846

293

 

07:35

At B+ o/b sc2 changes to 88h58-76m16-cprl

   

846

293

 

22:35

6 hours before start of BM sc 1,3,4 power on into 88h58-76m16-cplr, MCPs lowered by one level

   

846

293

29.12.05

04:35

At start of BM sc 1,3 change to 88m28-76m16-cplxt-apl-68w16, sc2,4 to, 88m28-76m16-cplxy-apl-nw-aph-nw for BM around i/b BS

   

846

293

 

07:05

Sc2 changes back to 88h58-72m12-cplr; sc1,3,4 power off at end of BM

   

846

293

 

12:30

At M- i/b sc 1,3,4 power on into 88h58-72m12-cplr, LEEA MCP’s lowered by one level, and sc2 HEEA MCP is raised back up to operational

   

846

293

 

14:15

At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational, and all power off at L=6

29.12.05

20:20

846

293

29.12.05

22:05

At L=6 o/b all power on into 88m28-72m12-cplr (-cprl on sc2)

   

847

293

30.12.05

00:05

2 hours after L=6 all change to 88m28-66h36-cplr (-cprl on sc2)

   

847

293

 

07:45

At M+ o/b all change to 88h58-72m12-cplr (-cprl on sc2) and LEEA MCPs are lowered by one level

   

847

293

 

15:45

At B+ o/b sc2 changes to 88h58-76m16-cprl

   

847

293

31.12.05

15:30

At B+ i/b sc2 changes to 88h58-72m12-cplr

   

847

293

 

21:30

At M- i/b sc 1,3,4 power on into 88h58-72m12-cplr, LEEA MCP’s lowered by one level, and sc2 HEEA MCP is raised back up to operational

   

847

293

 

23:15

At M+ i/b all change to 88m28-72m12-cplr and LEEA MCPs are raised back up to operational, and sc 1,2,3 power off at L=6

01.01.06

05:05

847

293

   

At L=6 o/b sc2 powers on into 88m28-72m12-cprl

   

848

293


Mullard Space Science Laboratory - Holmbury St. Mary - Dorking - Surrey - RH5 6NT - Telephone: +44 (0)1483 204100 - Copyright © 1999-2009 UCL


Search by Google