UCL DEPARTMENT OF SPACE & CLIMATE PHYSICS
SPACE PLASMA PHYSICS GROUP
UCL

Group research
    Research
    Missions
About us
    People
    Contact Us
    Meetings
Know our science
Opportunities
    MSSL Jobs


Jun 2005 Sc1 Calendar sc2 sc3 sc4

Power on / Start

Mode

Power off

Orbit #

Planning period

date

time

date

time

30.06.05

03:16

At end of firings all power on into 88h58-72m12-cplr (-cprl on sc2), MCPs at gain of as close to 0.5 as possible

 

 

770

267

 

04:40

All power off for firings

 

 

770

267

 

 

Firings on all sc

 

 

 

 

 

17:06

At end of firings all power on into 88h58-72m12-cplr (-cprl on sc2), MCPs at gain of as close to 0.5 as possible

 

 

770

267

 

18:18

All power off for firings

 

 

770

267

 

 

Firings on all sc

 

 

 

 

01.07.05

06:23

At end of firings all power on into 88h58-72m12-cplr (-cprl on sc2), MCPs at gain of as close to 0.5 as possible

 

 

770

267

 

07:55

All power off for firings

 

 

770

267

 

 

Firings on all sc

 

 

 

 

 

19:41

At end of firings sc 1,2 power on into 88m28-72m12-cplr (-cprl on sc2), MCPs at operational levels; sc 3,4 power on into 88h58-72m12-cplr, MCPs at gain of as close to 0.5 as possible

 

 

770

267

 

21:20

Sc1,3 change to 88m28-68m08-cplxs-aph-80w28, sc 2,4 change to 88m28-68m08-cplxy-apl-nw-aph-nw; MCPs on sc 3,4 raised back up to operational for BM through i/b auroral zone

 

 

770

267

 

23:20

Sc 1,2 power off at L=6 i/b

 

 

770

267

 

23:55

Sc 3,4 change to 88m28-72m12-cplr at end of BM

 

 

770

267

02.07.05

00:00

At L=6 o/b sc2 powers on into 88m28-72m12-cprl

 

 

771

267

02.07.05

01:05

At L=6 o/b sc1 powers on into 88m28-72m12-cplr

 

 

771

268

 

01:35

Sc 3,4 power off at L=6 i/b

 

 

771

268

 

03:10

At end of o/b cusp sc1,2 change to 88h58-72m12-cplr (-cprl on sc2), and MCPs are set to a gain of as close to 0.5 as possible

 

 

771

268

 

03:25

At L=6 o/b sc 3,4 power on into 88m28-72m12-cplr

 

 

771

268

 

20:35

Sc1,3 change to 88m28-72m12-cplxt-apl-64w12, sc 2,4 change to 88m28-72m12-cplxy-apl-nw-aph-nw; MCPs at gain of as close to 0.5 as possible for BM through possible MP

 

 

771

268

 

22:05

All change back to 88h58-72m12-cplr (-cprl on sc2) at end of BM

 

 

771

268

04.07.05

04:24

MCP op level test performed, sensors in 68h38-68h38, 4hrs 31 mins before L=6

 

 

771

268

 

04:55

At end of test all change back to 88h58-72m12-cplr (-cprl on sc2), MCPs are set to a gain of as close to 0.5 as possible

 

 

771

268

 

05:50

All change to 88m28-72m12-cplr (-cprl on sc2) and MCPs are returned to operational levels at start of i/b cusp, and all power off at L=6

04.07.05

08:55

771

268

04.07.05

10:35

At L=6 o/b sc2 powers on into 88m28-72m12-cplr (-cprl on sc2)

 

 

772

268

 

12:20

At end of o/b cusp sc1,2 change to 88h58-72m12-cplr (-cprl on sc2), and MCPs are set to a gain of as close to 0.5 as possible

 

 

772

268

06.07.05

13:50

Sc2 changes to 88m28-72m12-cprl and MCP’s are returned to operational levels at start of i/b cusp

 

 

772

268

 

14:45

Sc1,3 change to 88m28-72m12-cplxt-apl-64w12, sc 2,4 change to 88m28-72m12-cplxy-apl-nw-aph-nw; MCPs on sc 3,4 at gain of as close to 0.5 as possible and on sc 1,2 at operational for BM through i/b cusp

 

 

772

268

 

15:50

At start of i/b cusp sc 3,4 MCPs are returned to operational levels

 

 

772

268

 

16:39

Sc 1,3,4 change to 88m28-72m12-cplr, sc2 powers off at end of BM (L=6 for sc2)

 

 

772

268

 

17:04

Sc 1,3,4 power off for firings

 

 

772

268

 

 

Last firings. After this spacecraft separation is multiscale 1000km/10,000km

 

 

 

 

07.07.05

05:05

All power on into 88h58-72m12-cplr (-cprl on sc2), MCPs at gain of as close to 0.5 as possible at end of firings

 

 

773

268

 

18:15

Sc1,3 change to 88m28-72m12-cplxt-apl-64w12, sc 2,4 change to 88m28-72m12-cplxy-apl-nw-aph-nw; MCPs at gain of as close to 0.5 as possible for BM through possible MP

 

 

773

268

 

21:39

All change back to 88h58-72m12-cplr (-cprl on sc2) at end of BM

 

 

773

268

08.07.05

22:45

All change to 88m28-72m12-cplr (-cprl on sc2) and MCPs are returned to operational levels at start of i/b cusp

 

 

773

268

09.07.05

02:50

Sc 1,2 power off at L=6 i/b

 

 

773

268

09.07.05

03:40

At L=6 o/b sc2 powers on into 88m28-72m12-cprl

 

 

774

268

09.07.05

05:10

Sc 3,4 power off at L=6 i/b

 

 

774

269

 

04:40

At L=6 o/b sc1 powers on into 88m28-72m12-cplr

 

 

774

269

 

06:40

At end of o/b cusp sc1,2 change to 88m28-66h36-cplr (-cprl on sc2)

 

 

774

269

 

06:55

At L=6 o/b sc 3,4 power on into 88m28-72m12-cplr

 

 

774

269

 

08:45

At end of o/b cusp sc3,4 change to 88m28-66h36-cplr

 

 

774

269

10.07.05

10:00

Sc1,3 change to 88m28-76m16-cplxs-aph-80w28, sc 2,4 change to 88m28-76m16-cplxy-apl-nw-aph-nw for BM through lobe/plasmasheet

 

 

774

269

 

12:24

At end of BM all change back to 88m28-66h36-cplr (-cprl on sc2)

 

 

774

269

11.07.05

07:39

MCP op level test performed, sensors in 68h38-68h38, 4hrs 31 mins before L=6- sc1: 07:39, sc2: 06:39, sc 3,4: 09:44

 

 

774

269

 

08:10

At end of test all change back to 88m28-66h36-cplr (-cprl on sc2)

 

 

774

269

 

09:40

All change to 88m28-72m12-cplr (-cprl on sc2) at start of i/b cusp and all power off at L=6

11.07.05

12:10

774

269

11.07.05

13:40

At L=6 o/b all power on into 88m28-72m12-cplr (-cprl on sc2)

 

 

775

269

 

15:20

At end of o/b cusp all change to 88m28-66h36-cplr (-cprl on sc2)

 

 

775

269

12.07.05

12:50

Sc1,3 change to 88m28-76m16-cplxs-aph-80w28, sc 2,4 change to 88m28-76m16-cplxy-apl-nw-aph-nw for BM through lobe/plasmasheet

 

 

775

269

 

14:20

At end of BM all change back to 88m28-66h36-cplr (-cprl on sc2)

 

 

775

269

13.07.05

17:20

All change to 88m28-72m12-cplr (-cprl on sc2) at start of i/b cusp

 

 

775

269

 

19:50

At L=6 i/b sc2 powers off

 

 

775

269

 

20:17

Sc 1,3,4 power off for firings

 

 

775

269

14.07.05

08:24

At end of firings all power on into 88m28-66h36-cplr (-cprl on sc2)

 

 

776

269

 

20:30

Sc1,3 change to 88m28-76m16-cplxs-aph-80w28, sc 2,4 change to 88m28-76m16-cplxy-apl-nw-aph-nw for BM through lobe/plasmasheet

 

 

776

269

 

23:24

At end of BM all change back to 88m28-66h36-cplr (-cprl on sc2)

 

 

776

269

16.07.05

02:30

All change to 88m28-72m12-cplr (-cprl on sc2) at start of i/b cusp

 

 

776

269

 

06:20

At L=6 i/b sc 1,2 power off

 

 

776

269

16.07.05

07:10

At L=6 o/b sc2 powers on into 88m28-72m12-cprl

 

 

777

269

16.07.05

08:05

At L=6 o/b sc1 powers on into 88m28-72m12-cplr

 

 

777

270

 

08:35

At L=6 i/b sc 3,4 power off

 

 

777

270

 

09:50

At end of o/b cusp sc 1,2 change to 88m28-66h36-cplr (-cprl on sc2)

 

 

777

270

 

10:15

At L=6 o/b sc3,4 power on into 88m28-72m12-cplr

 

 

777

270

 

12:00

At end of o/b cusp sc 3,4 change to 88m28-66h36-cplr

 

 

777

270

17.07.05

08:35

Sc1,3 change to 88m28-76m16-cplxs-aph-80w28, sc 2,4 change to 88m28-76m16-cplxy-apl-nw-aph-nw for BM through plasmasheet

 

 

777

270

 

10:05

At end of BM all change back to 88m28-66h36-cplr (-cprl on sc2)

 

 

777

270

18.07.05

10:44

MCP op level test performed, sensors in 68h38-68h38, 4hrs 31 mins before L=6- sc1: 10:44, sc2: 09:49, sc 3,4: 12:49

 

 

777

270

 

11:15

At end of test all change back to 88m28-66h36-cplr (-cprl on sc2)

 

 

777

270

 

12:30

All change to 88m28-72m12-cplr (-cprl on sc2) at start of i/b cusp and all power off at L=6

 

 

777

270

18.07.05

16:45

At L=6 o/b all power on into 88m28-72m12-cplr (-cprl on sc2)

 

 

778

270

 

18:15

At end of o/b cusp all change to 88m28-66h36-cplr (-cprl on sc2)

 

 

778

270

20.07.05

20:15

All change to 88m28-72m12-cplr (-cprl on sc2) at start of i/b cusp

 

 

778

270

21.07.05

00:10

Sc 1,2 power off at L=6 i/b

 

 

778

270

 

00:55

At L=6 o/b sc2 powers on into 88m28-72m12-cprl

 

 

779

270

 

01:55

At L=6 o/b sc1 powers on into 88m28-68m08-cplxs-aph-80w28 in preparation for BM through auroral zone and cusp

 

 

779

270

 

02:10

Sc 2,4 change to 88m28-68m08-cplxy-apl-nw-aph-nw, sc3 into 88m28-68m08-cplxs-aph-80w28 for BM through o/b cusp (sc2), i/b auroral zone (sc 3,4)

 

 

779

270

 

02:35

At L=6 i/b sc3 changes to 88m28-60m00-cplxs-aph-88w36, sc4 to 88m28-60m00-cplxy-apl-nw-aph-nw and MCP levels are lowered to gain of as close to 0.5 as possible for perigee pass in BM

 

 

778

270

 

02:50

At start of o/b cusp sc1 changes to 88m28-68m08-cplxt-apl-60w08

 

 

779

270

 

04:20

At L=6 i/b sc3 changes to 88m28-68m08-cplxs-aph-80w28, sc4 to 88m28-68m08-cplxy-apl-nw-aph-nw and MCP levels are raised back up to operational for rest of BM in o/b auroral zone

 

 

779

270

 

05:10

At end of BM sc 1,2 change to 88m28-66h36-cplr (-cprl on sc2); sc 3,4 power cycle to 88m28-72m12-cplr

 

 

779

270

 

06:10

At end of o/b cusp sc3,4 change to 88m28-66h36-cplr

 

 

779

270

23.07.05

07:05

All change to 88m28-72m12-cplr (-cprl on sc2) at start of i/b cusp

 

 

779

270

 

09:40

At L=6 i/b sc 1,2 power off

 

 

779

270

23.07.05

10:20

At L=6 o/b sc2 powers on into 88m28-72m12-cprl

 

 

780

270

23.07.05

11:15

At L=6 o/b sc1 powers on into 88m28-72m12-cplr

 

 

780

271

 

11:45

At L=6 i/b sc 3,4 power off

 

 

779

271

 

12:55

At end of o/b cusp sc 1,2 change to 88m28-66h36-cplr (-cprl on sc2)

 

 

780

271

 

13:15

At L=6 o/b sc3,4 power on into 88m28-72m12-cplr

 

 

780

271

 

14:55

At end of o/b cusp sc 3,4 change to 88m28-66h36-cplr

 

 

780

271

24.07.05

10:15

Sc1,3 change to 88m28-76m16-cplxs-aph-80w28, sc 2,4 change to 88m28-76m16-cplxy-apl-nw-aph-nw for BM through plasmasheet

 

 

780

271

 

13:15

At end of BM all change back to 88m28-66h36-cplr (-cprl on sc2)

 

 

780

271

25.07.05

13:49

MCP op level test performed, sensors in 68h38-68h38, 4hrs 31 mins before L=6- sc1: 10:44, sc2: 09:49, sc 3,4: 12:49

 

 

780

271

 

14:20

At end of test sc 1,2 change back to 88m28-66h36-cplr (-cprl on sc2); sc 3,4 change back to 88m28-72m12-cplr

 

 

780

271

 

15:05

Sc 1,2 change to 88m28-72m12-cplr (-cprl on sc2) at start of i/b cusp and all power off at L=6

25.07.05

18:20

780

271

25.07.05

19:50

At L=6 o/b all power on into 88m28-72m12-cplr (-cprl on sc2)

 

 

781

271

 

21:35

At end of o/b cusp all change to 88m28-66h36-cplr (-cprl on sc2)

 

 

781

271

27.07.05

23:35

All change to 88m28-72m12-cplr (-cprl on sc2) at start of i/b cusp and all power off at L=6

28.07.05

03:45

781

271

28.07.05

05:35

At L=6 o/b sc 1,2 power on into 88m28-72m12-cplr (-cprl on sc2)

 

 

782

271

 

07:25

At end of o/b cusp sc 1,2 change to 88m28-66h36-cplr (-cprl on sc2)

 

 

782

271

 

07:45

Sc3 powers on into 88m28-68m08-cplxs-aph-80w28, sc4 into 88m28-68m08-cplxy-apl-nw-aph-nw for BM through auroral zone and cusp

 

 

782

271

 

08:00

Sc1 changes to 88m28-76m16-cplxs-aph-80w28; sc2 changes to 88m28-76m16-cplxy-apl-nw-aph-nw for BM through o/b lobe

 

 

782

271

 

08:30

Sc3 changes to 88m28-68m08-cplxt-apl-60w08 for cusp part of BM

 

 

782

271

 

09:30

At end of BM all change back to 88m28-66h36-cplr (-cprl on sc2)

 

 

782

271

30.07.05

10:15

All change to 88m28-72m12-cplr (-cprl on sc2) at start of i/b cusp

 

 

782

271

 

12:50

At L=6 i/b sc 1,2 power off

 

 

782

271

30.07.05

13:10

At L=6 o/b sc2 powers on into 88m28-72m12-cprl

 

 

783

271

30.07.05

14:20

At L=6 o/b sc1 powers on into 88m28-72m12-cplr

 

 

783

272

 

14:55

At L=6 i/b sc 3,4 power off

 

 

782

272

 

15:50

At end of o/b cusp sc 1,2 change to 88m28-66h36-cplr (-cprl on sc2)

 

 

783

272

 

16:20

At L=6 o/b sc3,4 power on into 88m28-72m12-cplr

 

 

783

272

 

17:50

At end of o/b cusp sc 3,4 change to 88m28-66h36-cplr

 

 

783

272

31.07.05

14:00

Sc1,3 change to 88m28-76m16-cplxs-aph-80w28, sc 2,4 change to 88m28-76m16-cplxy-apl-nw-aph-nw for BM through plasmasheet

 

 

783

272

 

17:00

At end of BM all change back to 88m28-66h36-cplr (-cprl on sc2)

 

 

783

272

01.08.05

17:04

MCP op level test performed, sensors in 68h38-68h38, 4hrs 31 mins before L=6- sc1: 10:44, sc2: 09:49, sc 3,4: 12:49

 

 

783

272

 

17:35

At end of test sc 1,2 change back to 88m28-66h36-cplr (-cprl on sc2); sc 3,4 change back to 88m28-72m12-cplr

 

 

783

272

 

17:50

Sc 1,2 change to 88m28-72m12-cplr (-cprl on sc2) at start of i/b cusp and all power off at L=6

01.08.05

21:35

783

272

 


Mullard Space Science Laboratory - Holmbury St. Mary - Dorking - Surrey - RH5 6NT - Telephone: +44 (0)1483 204100 - Copyright © 1999-2009 UCL


Search by Google