May 2005 Sc1 Calendar sc2 sc3 sc4

Power on / Start

Mode

Power off

Orbit #

Planning period

date

time

date

time

31.05.05

08:10

At L=6 all power on into 88m28-72m12-cplr (-cprl on sc2)

 

 

758

263

 

16:00

At end of o/b cusp sc 2,3,4 change to 88h58-72m12-cplr; MCPs at gain of as close to 0.5 as possible (-cprl on sc2)

 

 

758

263

 

17:20

Sc 2,3,4 power off at M- o/b

 

 

758

263

 

20:00

Sc1 changes to, and sc3 powers on into, 88m28-72m12-cplxt-apl-64w12, sc 2,4 power on into 88m28-72m12-cplxy-apl-nw-aph-nw; MCPs at gain of as close to 0.5 as possible for BM through o/b MP

 

 

758

263

01.06.05

00:00

Sc1 changes back to 88h58-72m12-cplr, sc 1,3,4 power off at end of BM

 

 

758

263

 

01:43

Sc1 powers off for firings

 

 

758

263

 

 

Firings

 

 

758

263

 

13:45

Sc1 powers on into 88h58-72m12-cplr, MCPs at gain of as close to 0.5 as possible after firings end

 

 

758

263

 

20:30

Sc2 powers on into 88h58-72m12-cplr (-cprl on sc2), MCPs set to gain of as close to 0.5 as possible at M- i/b

 

 

758

263

 

21:42

Sc 1,2 power off for firings

 

 

758

263

 

 

Firings

 

 

758

263

02.06.05

12:20

Sc 1,3,4 power on into 88m28-72m12-cplr (-cprl on sc2) after firings, then all power off at L=6

02.06.05

16:30

758

263

02.06.05

18:05

At L=6 all power on into 88m28-72m12-cplr (-cprl on sc2)

 

 

759

263

03.06.05

02:15

At end of o/b cusp all change to 88h58-72m12-cplr; MCPs at gain of as close to 0.5 as possible (-cprl on sc2)

 

 

759

263

 

03:40

Sc 2,3,4 power off at M- o/b

 

 

759

263

04.06.05

05:30

Sc 2,4 power on into 88h58-72m12-cplr (-cprl on sc2), MCPs set to gain of as close to 0.5 as possible at M- i/b

 

 

759

263

 

07:30

Sc2 changes to 88m28-72m12-cplr (-cprl on sc2) and MCPs are returned to operational levels at start of i/b cusp

 

 

759

263

 

09:00

Sc1 changes to, and sc3 powers on into, 88m28-72m12-cplxt-apl-64w12, sc 2,4 change to 88m28-72m12-cplxy-apl-nw-aph-nw; MCPs at gain of as close to 0.5 as possible on sc 1,3,4 and at operational on sc2, for BM through i/b MP/cusp

 

 

759

263

 

11:30

Sc 3,4 MCPs are returned to operational levels at start of i/b cusp

 

 

759

263

 

12:00

Sc 2,3,4 change to 88m28-72m12-cplr with MCPs at operational levels; sc1 changes back to 88h58-72m12-cplr with MCPs at gain of as close to 0.5 as possible at end of BM

 

 

759

263

 

13:15

Sc1 changes to 88m28-72m12-cplr (-cprl on sc2) and MCPs are returned to operational levels at start of i/b cusp, and all power off at L=6

05.06.05

02:50

759

263

05.06.05

04:40

At L=6 all power on into 88m28-72m12-cplr (-cprl on sc2)

 

 

760

264

 

07:00

At end of o/b cusp sc2 changes to 88h58-72m12-cprl; MCPs at gain of as close to 0.5 as possible

 

 

760

264

 

08:45

All power off for firings

 

 

760

264

 

 

Firings on sc 1,2

 

 

760

264

 

19:23

At end of firings sc2 powers on into 88h58-72m12-cprl; MCPs at gain of as close to 0.5 as possible

 

 

760

264

 

20:00

Sc1,3 power on into, 88m28-72m12-cplxt-apl-64w12; sc2 changes to, and sc4 changes to 88m28-72m12-cplxy-apl-nw-aph-nw; MCPs at gain of as close to 0.5 as possible on sc 1,3,4 and at operational on sc2, for BM in o/b sheath

 

 

760

264

 

22:48

Sc2 changes back to 88h58-72m12-cprl, sc 1,3,4 power off at end of BM

 

 

760

264

06.06.05

05:39

Sc2 powers off for firings

 

 

760

264

 

 

Firings on sc 1,2

 

 

760

264

 

11:38

Sc2 powers on into 88h58-72m12-cprl, MCPs at gain of as close to 0.5 as possible after firings end

 

 

760

264

 

17:55

Sc4 powers on into 88h58-72m12-cplr, MCPs set to gain of as close to 0.5 as possible at M- i/b

 

 

760

264

 

16:30

Sc2 changes to 88m28-72m12-cprl and MCPs are returned to operational levels at start of i/b cusp

 

 

760

264

 

19:00

Sc1,3 power on into, 88m28-72m12-cplxt-apl-64w12, sc 2,4 change to 88m28-72m12-cplxy-apl-nw-aph-nw; MCPs at gain of as close to 0.5 as possible on sc 1,3,4 and at operational on sc2, for BM through i/b MP/cusp

 

 

760

264

 

20:05

Sc4 MCPs are returned to operational levels at start of i/b cusp

 

 

760

264

 

21:00

Sc 2,4 change to 88m28-72m12-cplr (-cprl on sc2) with MCPs at operational levels; sc1,3 change to 88h58-72m12-cplr with MCPs at gain of as close to 0.5 as possible at end of BM

 

 

760

264

 

23:20

Sc1,3 change to 88m28-72m12-cplr and MCPs are returned to operational levels at start of i/b cusp

 

 

760

264

07.06.05

09:14

MCP op level test performed, sensors in 68h38-68h38, performed 4hrs 31 mins before L=6  - note for first time test carried out at different times as spacecraft are so far apart

 

 

760

264

 

09:45

All change back to 88m28-72m12-cplr (-cprl on sc2) at end of test and all power off at L=6

07.06.05

13:45

760

264

07.06.05

15:25

At L=6 all power on into 88m28-72m12-cplr (-cprl on sc2)

 

 

761

264

 

16:50

At end of o/b cusp sc2,3,4 change to 88h58-72m12-cplr (-cprl on sc2), MCPs at gain of as close to 0.5 as possible

 

 

761

264

 

21:32

Sc1,3 change to 88m28-72m12-cplxt-apl-64w12, sc 2,4 change to 88m28-72m12-cplxy-apl-nw-aph-nw for BM through o/b MP/cusp

 

 

761

264

 

23:08

Sc2,3,4 change back to 88h58-72m12-cplr (-cprl on sc2), sc1 to 88m28-72m12-cplr at end of BM

 

 

761

264

 

23:50

At end of o/b cusp sc1 changes to 88h58-72m12-cplr, MCPs at gain of as close to 0.5 as possible

 

 

761

264

08.06.05

01:25

Sc 1,3,4 power off at M- o/b

 

 

761

264

09.06.05

07:00

Sc 1,3,4 power on into 88h58-72m12-cplr, MCPs set to gain of as close to 0.5 as possible at M- i/b

 

 

761

264

 

08:33

Sc3 powers off for firings

 

 

761

264

 

 

Firings on sc3

 

 

761

264

 

09:20

Sc1,2,4 change to 88m28-72m12-cplr (-cprl on sc2) and MCPs are returned to operational levels at start of i/b cusp and power off at L=6

09.06.05

23:55

761

264

10.06.05

01:40

At L=6 sc 1,2,4 power on into 88m28-72m12-cplr (-cprl on sc2)

 

 

762

264

 

05:19

After firings sc3 powers on into 88m28-72m12-cplr

 

 

762

264

 

06:51

Sc1 powers off for firings

 

 

762

264

 

 

Firings on sc1

 

 

762

264

 

22:40

At end of o/b cusp sc 2,3,4 change to 88h58-72m12-cplr (-cprl on sc2), MCPs at gain of as close to 0.5 as possible

 

 

762

264

 

12:55

Sc 3,4 power off at M- o/b

 

 

762

264

 

15:20

Sc2 powers off for firings

 

 

762

264

 

 

Firings on sc2

 

 

762

264

11.06.05

16:45

Sc 1,3,4 power on into 88h58-72m12-cplr, MCPs set to gain of as close to 0.5 as possible at M- i/b

 

 

762

264

 

19:08

Sc1 powers off for firings

 

 

762

264

 

 

Firings on sc1

 

 

762

264

 

16:00

Sc2 powers on into 88m28-72m12-cprl after firings

 

 

762

264

 

18:45

Sc 3,4 change to 88m28-72m12-cplr and MCPs are returned to operational levels at start of i/b cusp

 

 

762

264

12.06.05

01:25

Sc2 powers off at L=6 i/b

 

 

762

264

 

03:15

Sc2 powers on into 88m28-72m12-cprl at L=6 o/b, orbit 763

 

 

762

264

 

07:24

Sc1 powers on into 88m28-72m12-cprl after firings

 

 

762

264

 

08:58

Sc1,3 change to 88m28-72m12-cplxt-apl-64w12, sc 2,4 change to 88m28-72m12-cplxy-apl-nw-aph-nw for BM through auroral zones

 

 

762

264

 

10:34

All change back to 88m28-72m12-cplr (-cprl on sc2) at end of BM and sc1,3,4 power off at L=6 i/b

12.06.05

11:15

762

264

12.06.05

12:55

At L=6 sc 2,3,4 power on into 88m28-72m12-cplr (-cprl on sc2)

 

 

763

265

 

 

Firings on sc1

 

 

763

265

 

16:12

Sc1 powers on into 88m28-72m12-cplr after firings

 

 

763

265

 

21:45

At end of o/b cusp / M+, which ever is later, all change to 88h58-72m12-cplr (-cprl on sc2), MCPs at gain of as close to 0.5 as possible

 

 

763

265

 

14:45

Sc 2,3,4 power off at M- o/b (sc2 time shown)

 

 

763

265

13.06.05

17:22

Sc1 changes to, and sc3 powers on into, 88m28-72m12-cplxt-apl-64w12, sc 2,4 power on into 88m28-72m12-cplxy-apl-nw-aph-nw; MCPs at gain of as close to 0.5 as possible for BM in sheath

 

 

763

265

 

21:04

Sc1 changes back to 88h58-72m12-cplr, others power off at end of BM

 

 

763

265

 

21:51

Sc1 powers off for firings

 

 

763

265

 

 

Firings on sc1,2,4

 

 

763

265

14.06.05

13:29

All power on at various times into 88m28-72m12-cplr (-cprl on sc2) after firings and all power off at L=6

14.06.05

22:05

763

265

14.06.05

23:35

At L=6 all power on into 88m28-72m12-cplr (-cprl on sc2)

 

 

764

265

15.06.05

00:35

At end of o/b cusp sc2 changes to 88h58-72m12-cplr (-cprl on sc2), MCPs at gain of as close to 0.5 as possible

 

 

764

265

 

09:08

Sc1,3 change to 88m28-72m12-cplxt-apl-64w12, sc 2,4 change to 88m28-72m12-cplxy-apl-nw-aph-nw; sc2 MCPs at gain of as close to 0.5 as possible for BM through o/b MP

 

 

764

265

 

09:15

At end of o/b cusp sc 1,3,4 MCPs are lowered to gain of as close to 0.5 as possible

 

 

764

265

 

11:38

Sc 1,3,4 change to 88h58-72m12-cplr, sc2 powers off at end of BM

 

 

764

265

 

12:25

Sc 3,4 power off at M- o/b (sc3 time shown)

 

 

764

265

 

15:25

Sc1 powers off for firings

 

 

764

265

 

 

Firings on all sc

 

 

764

265

16.06.05

09:20

Sc2 powers on into 88m28-72m12-cprl, MCPs at operational; sc1 powers on into 88h58-72m12-cplr, MCPs at gain of as close to 0.5 as possible after firings

 

 

764

265

 

12:00

Sc 3,4 power on into 88h58-72m12-cplr, MCPs at gain of as close to 0.5 as possible (sc3 time shown)

 

 

764

265

 

14:44

Sc1,3 change to 88m28-72m12-cplxt-apl-64w12; sc2,4 change to 88m28-72m12-cplxy-apl-nw-aph-nw, MCPs at gain of as close to 0.5 as possible on all but sc2 for BM through i/b MP

 

 

764

265

 

16:15

At start of i/b cusp sc1,3,4 MCPs are raised back up to operational

 

 

764

265

 

17:14

At end of BM all change to 88m28-72m12-cplr (-cprl on sc2)

 

 

764

265

17.06.05

05:34

MCP op level test performed, sensors in 68h38-68h38, performed 4hrs 31 mins before L=6  - sc1,3 use sc1 time, sc 2 and 4 use their own times

 

 

764

265

 

06:05

All change back to 88m28-72m12-cplr (-cprl on sc2) at end of test and all power off at L=6

17.06.05

10:05

764

265

17.06.05

04:25

At L=6 sc2 powers on into 88m28-72m12-cplr (-cprl on sc2)

 

 

765

265

 

11:45

Sc1,3 power on into 88m28-68m08-cplxs-aph-80w28, sc2 changes to 88m28-68m08-cplxy-apl-nw-aph-nw at start of BM through auroral zone (and L=6)

 

 

765

265

 

12:30

Sc4 powers on into 88m28-68m08-cplxy-apl-nw-aph-nw at L=6

 

 

765

265

 

13:15

At end of BM all change to 88m28-72m12-cplr (-cprl on sc2)

 

 

765

265

 

21:05

At end of o/b cusp all change to 88h58-72m12-cplr (-cprl on sc2), MCPs at gain of as close to 0.5 as possible

 

 

765

265

 

17:00

Sc 2,3,4 power off at M- o/b (sc2 time shown)

 

 

765

265

18.06.05

04:45

Sc1 powers off for firings

 

 

765

265

 

 

Firings on all sc

 

 

765

265

 

14:36

Sc1 powers on into 88h58-72m12-cplr after firings

 

 

765

265

 

18:30

At M- sc 2,3,4 power on into 88h58-72m12-cplr, MCPs at gain of as close to 0.5 as possible (sc2 time shown)

 

 

765

265

19.06.05

02:50

All change to 88m28-72m12-cplr (-cprl on sc2) and MCPs are returned to operational levels at start of i/b cusp

 

 

765

265

 

16:20

Sc2 powers off at L=6 i/b

 

 

765

265

 

17:50

Sc2 powers on into 88m28-72m12-cprl at L=6 o/b, orbit 766

 

 

766

265

 

20:12

Sc1,3 change to 88m28-68m08-cplxs-aph-80w28, sc 2,4 change to 88m28-68m08-cplxy-apl-nw-aph-nw for BM through auroral zones

 

 

765

265

 

21:05

Sc1 powers off at L=6

 

 

765

265

 

21:54

Sc 2,4 change back to 88m28-72m12-cplr, sc3 powers off at end of BM

 

 

765

265

 

22:25

Sc4 powers off at L=6

 

 

765

265

 

22:45

Sc1 powers on into 88m28-72m12-cplr at L=6 o/b, orbit 766

 

 

766

265

19.06.05

23:20

At L=6 sc 3,4 power on into 88m28-72m12-cplr

 

 

766

266

20.06.05

04:45

All power off for firings

 

 

766

266

 

 

Firings on all sc

 

 

766

266

 

15:35

Sc2 powers on into to 88h58-72m12-cprl, MCPs at gain of as close to 0.5 as possible

 

 

766

266

 

23:00

Sc1,3 power on into 88m28-72m12-cplxt-apl-64w12, sc4 powers on into, and sc2 changes to 88m28-72m12-cplxy-apl-nw-aph-nw at start of BM in sheath

 

 

766

266

21.06.05

02:06

At end of BM sc2 changes back to 88m28-72m12-cprl; sc 1,3,4 power off

 

 

766

266

 

09:10

At M- i/b sc 1,3,4 power on into 88h58-72m12-cplr, MCPs at gain of as close to 0.5 as possible

 

 

766

266

 

13:10

All change to 88m28-72m12-cplr (-cprl on sc2) and MCPs are returned to operational levels at start of i/b cusp

 

 

766

266

22.06.05

04:34

MCP op level test performed, sensors in 68h38-68h38, performed 4hrs 31 mins before L=6  - different times on all sc

 

 

766

266

 

05:05

All change back to 88m28-72m12-cplr (-cprl on sc2) at end of test and all power off at L=6

22.06.05

09:05

766

266

22.06.05

10:45

At L=6 all power on into 88m28-72m12-cplr (-cprl on sc2)

 

 

767

266

 

21:00

At end of o/b cusp sc2 changes to 88h58-72m12-cplr (-cprl on sc2), MCPs at gain of as close to 0.5 as possible

 

 

767

266

 

23:19

Sc1,3 change to 88m28-72m12-cplxt-apl-64w12, sc 2,4 change to 88m28-72m12-cplxy-apl-nw-aph-nw; sc2 MCPs at gain of as close to 0.5 as possible for BM through o/b MP

 

 

767

266

23.06.05

01:28

Sc 2,3,4 change to 88h58-72m12-cplr (-cprl on sc2), sc1 powers off at end of BM

 

 

767

266

 

04:25

At M- o/b sc 3,4 power off

 

 

767

266

 

18:30

At M- i/b sc 1,3,4 power on into 88h58-72m12-cplr, MCPs at gain of as close to 0.5 as possible

 

 

767

266

 

23:20

All change to 88m28-72m12-cplr (-cprl on sc2) and MCPs are returned to operational levels at start of i/b cusp

 

 

767

266

24.06.05

17:40

All power off for firings

 

 

767

266

 

 

Firings on all sc

 

 

 

 

25.06.05

06:06

At end of firings all power on into 88h58-72m12-cplr (-cprl on sc2), MCPs at gain of as close to 0.5 as possible

 

 

768

267

 

20:54

Sc1,3 change to 88m28-72m12-cplxt-apl-64w12, sc 2,4 change to 88m28-72m12-cplxy-apl-nw-aph-nw; MCPs at gain of as close to 0.5 as possible for BM through sheath

 

 

768

267

 

23:12

All change back to 88h58-72m12-cplr (-cprl on sc2) at end of BM

 

 

768

267

26.06.05

06:00

Sc1,3 change to 88m28-72m12-cplxt-apl-64w12, sc 2,4 change to 88m28-72m12-cplxy-apl-nw-aph-nw; sc2 MCPs at gain of as close to 0.5 as possible for BM through i/b MP

 

 

768

267

 

06:48

All change back to 88h58-72m12-cplr (-cprl on sc2) at end of BM

 

 

768

267

27.06.05

00:59

MCP op level test performed, sensors in 68h38-68h38, performed 4hrs 31 mins before L=6  - sc1: 00:59, sc2: 23:59, sc 3,4: 03:14

 

 

768

267

 

01:30

All change to 88m28-72m12-cplr (-cprl on sc2), MCPs at operational levels at end of test and all power off at L=6

27.06.05

05:30

768

267

27.06.05

07:20

At L=6 all power on into 88m28-72m12-cplr (-cprl on sc2)

 

 

769

267

 

09:10

At end of o/b cusp all change to 88h58-72m12-cplr (-cprl on sc2), and MCPs are set to a gain of as close to 0.5 as possible

 

 

769

267

28.06.05

14:00

Sc1,3 change to 88m28-72m12-cplxt-apl-64w12, sc 2,4 change to 88m28-72m12-cplxy-apl-nw-aph-nw; MCPs at gain of as close to 0.5 as possible for BM through i/b MP

 

 

769

267

 

18:00

All change back to 88h58-72m12-cplr (-cprl on sc2) at end of BM

 

 

769

267

 

12:05

Sc 1,2 change to 88m28-72m12-cplr (-cprl on sc2) and MCPs are returned to operational levels at start of i/b cusp

 

 

769

267

29.06.05

12:20

All power off for firings

 

 

769

267

 

 

Firings on all sc

 

 

 

 

30.06.05

03:16

At end of firings all power on into 88h58-72m12-cplr (-cprl on sc2), MCPs at gain of as close to 0.5 as possible

 

 

770

267

 

04:40

All power off for firings

 

 

770

267

 

 

Firings on all sc

 

 

 

 

 

17:06

At end of firings all power on into 88h58-72m12-cplr (-cprl on sc2), MCPs at gain of as close to 0.5 as possible

 

 

770

267

 

18:18

All power off for firings

 

 

770

267

 

 

Firings on all sc

 

 

 

 

01.07.05

06:23

At end of firings all power on into 88h58-72m12-cplr (-cprl on sc2), MCPs at gain of as close to 0.5 as possible

 

 

770

267

 

07:55

All power off for firings

 

 

770

267

 

 

Firings on all sc

 

 

 

 

 

19:41

At end of firings sc 1,2 power on into 88m28-72m12-cplr (-cprl on sc2), MCPs at operational levels; sc 3,4 power on into 88h58-72m12-cplr, MCPs at gain of as close to 0.5 as possible

 

 

770

267

 

21:20

Sc1,3 change to 88m28-68m08-cplxs-aph-80w28, sc 2,4 change to 88m28-68m08-cplxy-apl-nw-aph-nw; MCPs on sc 3,4 raised back up to operational for BM through i/b auroral zone

 

 

770

267

 

23:20

Sc 1,2 power off at L=6 i/b

 

 

770

267

 

23:55

Sc 3,4 change to 88m28-72m12-cplr at end of BM

 

 

770

267

02.07.05

00:00

At L=6 sc2 powers on into 88m28-72m12-cprl

 

 

771

267

 