Apr 2005 Sc1 Calendar sc2 sc3 sc4

Power on / Start

Mode

Power off

Orbit #

Planning period

date

time

date

time

30.04.05

10:00

At L=6 all power on into 88m28-72m12-cplr (-cprl on sc2)

   

745

259

 

16:40

At end of o/b cusp all change to 88h58-72m12-cplr; MCPs at gain of as close to 0.5 as possible (-cprl on sc2)

   

745

259

 

17:35

Sc 2,3,4 power off at M- o/b

   

745

259

 

21:00

Sc1 power cycles to, and sc 2,3,4 power on into, single sensor mode off-76m16-cpls (-cpsl on sc2), MCPs still at gain of as close to 0.5 as possible at B+ o/b

   

745

259

 

23:20

Sc 2,3,4 power off at B- o/b

   

745

259

01.05.05

22:30

Sc 2,3,4 power on into single sensor mode off-76m16-cpls (-cpsl on sc2), MCPs still at gain of as close to 0.5 as possible at B- i/b

   

745

259

02.05.05

00:40

Sc 2,3,4 power off; sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs still set to gain of as close to 0.5 as possible at B+ i/b

   

745

259

 

06:55

Sc 2,3,4 power on into 88h58-72m12-cplr (-cprl on sc2), MCPs set to gain of as close to 0.5 as possible at M- i/b

   

745

259

 

08:05

All change to 88m28-72m12-cplr (-cprl on sc2) and MCPs are returned to operational levels at start of i/b cusp

   

745

259

 

12:49

MCP op level test performed, sensors in 68h38-68h38, performed at same time on all sc 4hrs 31 mins before sc1 L=6 

   

745

259

 

13:20

All change back to 88m28-72m12-cplr (-cprl on sc2) at end of test and all power off at L=6

02.05.05

17:20

745

259

02.05.05

19:00

At L=6 all power on into 88m28-72m12-cplr (-cprl on sc2)

   

746

259

03.05.05

01:10

At M+ o/b all change to 88h58-72m12-cplr; MCPs at gain of as close to 0.5 as possible (-cprl on sc2)

   

746

259

 

02:50

Sc 2,3,4 power off at M- o/b

   

746

259

 

06:15

Sc4 powers on into single sensor mode off-76m16-cpls, MCPs at gain of as close to 0.5 as possible at B+ o/b

   

746

259

 

06:35

Sc2 power cycles to, and sc4 changes to off-72m12-cplx-anl-nw; sc3 powers on into and sc1 power cycles to off-72m12-cpxy-apl-64w12-tnl-nw, MCPs at gain of as close to 0.5 as possible for BM through BS o/b

   

746

259

 

08:05

All change to off-76m16-cpls (-cpsl on sc2) at end of BM

   

746

259

 

08:50

Sc 2,3,4 power off at B- o/b

   

746

259

04.05.05

07:00

Sc 2,3,4 power on into single sensor mode off-76m16-cpls (-cpsl on sc2), MCPs still at gain of as close to 0.5 as possible at B- i/b

   

746

259

 

09:20

Sc 2,3,4 power off; sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs still set to gain of as close to 0.5 as possible at B+ i/b

   

746

259

 

15:55

Sc 2,3,4 power on into 88h58-72m12-cplr (-cprl on sc2), MCPs set to gain of as close to 0.5 as possible at M- i/b

   

746

259

 

17:05

All change to 88m28-72m12-cplr (-cprl on sc2) and MCPs are returned to operational levels at start of i/b cusp and all power off at L=6

05.05.05

02:05

746

259

05.05.05

03:50

At L=6 all power on into 88m28-72m12-cplr (-cprl on sc2)

   

747

259

 

10:00

Sc 1,3 change to 88m28-72m12-cplxt-apl-64w12, sc 2,4 to 88m28-72m12-cplxy-apl-nw-aph-nw for BM through MP

   

747

259

 

11:00

MCPs are set to gain of as close to 0.5 as possible at end of o/b cusp

   

747

259

 

13:00

Sc 2,3,4 power off at end of BM, sc1 changes to 88h58-72m12-cplr

   

747

259

06.05.05

15:20

Sc 2,3,4 power on into single sensor mode off-76m16-cpls (-cpsl on sc2), MCPs still at gain of as close to 0.5 as possible at B- i/b

   

747

259

 

17:45

Sc 2,3,4 power off; sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs still set to gain of as close to 0.5 as possible at B+ i/b

   

747

259

07.05.05

00:45

Sc 2,3,4 power on into 88h58-72m12-cplr (-cprl on sc2), MCPs set to gain of as close to 0.5 as possible at M- i/b

   

747

259

 

02:40

All change to 88m28-72m12-cplr (-cprl on sc2) and MCPs are returned to operational levels at M+ i/b and all power off at L=6

07.05.05

11:40

747

259

07.05.05

13:20

At L=6 all power on into 88m28-72m12-cplr (-cprl on sc2)

   

748

260

 

20:05

At end of o/b cusp all change to 88h58-72m12-cplr; MCPs at gain of as close to 0.5 as possible (-cprl on sc2)

   

748

260

 

21:00

Sc 1,3,4 power off at M- o/b

   

748

260

08.05.05

01:15

Sc2 power cycles to, and sc 1,3,4 power on into, single sensor mode off-76m16-cpls (-cpsl on sc2), MCPs still at gain of as close to 0.5 as possible at B+ o/b

   

748

260

 

03:55

Sc 1,3,4 power off at B- o/b

   

748

260

 

23:40

Sc 1,3,4 power on into single sensor mode off-76m16-cpls (-cpsl on sc2), MCPs still at gain of as close to 0.5 as possible at B- i/b

   

748

260

09.05.05

02:15

Sc 1,3,4 power off; sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs still set to gain of as close to 0.5 as possible at B+ i/b

   

748

260

 

09:40

Sc 1,3,4 power on into 88h58-72m12-cplr (-cprl on sc2), MCPs set to gain of as close to 0.5 as possible at M- i/b

   

748

260

 

10:50

All change to 88m28-72m12-cplr (-cprl on sc2) and MCPs are returned to operational levels at start of i/b cusp

   

748

260

 

15:54

MCP op level test performed, sensors in 68h38-68h38, performed at same time on all sc 4hrs 31 mins before sc1 L=6 

   

748

260

 

16:25

All change back to 88m28-72m12-cplr (-cprl on sc2) at end of test and all power off at L=6

09.05.05

20:25

748

260

09.05.05

22:00

At L=6 all power on into 88m28-72m12-cplr (-cprl on sc2)

   

749

260

10.05.05

04:25

At M+ o/b all change to 88h58-72m12-cplr; MCPs at gain of as close to 0.5 as possible (-cprl on sc2)

   

749

260

 

06:10

Sc 1,3,4 power off at M- o/b

   

749

260

 

10:40

Sc2 power cycles to, and sc 1,3,4 power on into, single sensor mode off-76m16-cpls (-cpsl on sc2), MCPs still at gain of as close to 0.5 as possible at B+ o/b

   

749

260

 

11:05

Sc 1,3 change to off-72m12-cpxy-apl-64w12-tnl-nw, sc 2,4 to off-72m12-cplx-anl-nw, MCPs at gain of as close to 0.5 as possible for BM through BS o/b

   

749

260

 

12:35

All change to off-76m16-cpls (-cpsl on sc2) at end of BM

   

749

260

 

13:30

Sc 2,3,4 power off at B- o/b

   

749

260

11.05.05

07:45

Sc 1,3,4 power on into single sensor mode off-76m16-cpls (-cpsl on sc2), MCPs still at gain of as close to 0.5 as possible at B- i/b

   

749

260

 

10:30

Sc 1,3,4 power off; sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs still set to gain of as close to 0.5 as possible at B+ i/b

   

749

260

 

18:25

Sc 1,3,4 power on into 88h58-72m12-cplr (-cprl on sc2), MCPs set to gain of as close to 0.5 as possible at M- i/b

   

749

260

 

19:40

All change to 88m28-72m12-cplr (-cprl on sc2) and MCPs are returned to operational levels at start of i/b cusp and all power off at L=6

12.05.05

05:25

749

260

12.05.05

07:20

At L=6 all power on into 88m28-72m12-cplr (-cprl on sc2)

   

750

260

 

14:20

At end of o/b cusp all change to 88h58-72m12-cplr; MCPs at gain of as close to 0.5 as possible (-cprl on sc2)

   

750

260

 

15:25

Sc 1,3,4 power off at M- o/b

   

750

260

 

20:10

Sc2 power cycles to, and sc 1,3,4 power on into, single sensor mode off-76m16-cpls (-cpsl on sc2), MCPs still at gain of as close to 0.5 as possible at B+ o/b

   

750

260

 

23:15

Sc 1,3,4 power off at B- o/b

   

750

260

13.05.05

15:45

Sc 1,3,4 power on into single sensor mode off-76m16-cpls (-cpsl on sc2), MCPs still at gain of as close to 0.5 as possible at B- i/b

   

750

260

 

18:45

Sc 1,3,4 power off; sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs still set to gain of as close to 0.5 as possible at B+ i/b

   

750

260

14.05.05

03:15

Sc 1,3,4 power on into 88h58-72m12-cplr (-cprl on sc2), MCPs set to gain of as close to 0.5 as possible at M- i/b

   

750

260

 

04:30

All change to 88m28-72m12-cplr (-cprl on sc2) and MCPs are returned to operational levels at start of i/b cusp and all power off at L=6

14.05.05

14:45

750

260

14.05.05

16:25

At L=6 all power on into 88m28-72m12-cplr (-cprl on sc2)

   

751

261

 

22:45

At M+ o/b all change to 88h58-72m12-cplr; MCPs at gain of as close to 0.5 as possible (-cprl on sc2)

   

751

261

15.05.05

00:35

Sc 2,3,4 power off at M- o/b

   

751

261

 

05:50

Sc1 power cycles to, and sc 2,3,4 power on into, single sensor mode off-76m16-cpls (-cpsl on sc2), MCPs still at gain of as close to 0.5 as possible at B+ o/b

   

751

261

 

06:50

Sc 1,3 change to off-72m12-cpxy-apl-64w12-tnl-nw, sc 2,4 to off-72m12-cplx-anl-nw, MCPs at gain of as close to 0.5 as possible for BM through BS o/b

   

751

261

 

09:20

Sc1 changes back to off-76m16-cpls, sc 2,3,4 power off, at end of BM

   

751

261

 

23:35

Sc 2,3,4 power on into single sensor mode off-76m16-cpls (-cpsl on sc2), MCPs still at gain of as close to 0.5 as possible at B- i/b

   

751

261

16.05.05

02:55

Sc 2,3,4 power off; sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs still set to gain of as close to 0.5 as possible at B+ i/b

   

751

261

 

11:55

Sc 2,3,4 power on into 88h58-72m12-cplr (-cprl on sc2), MCPs set to gain of as close to 0.5 as possible at M- i/b

   

751

261

 

13:15

All change to 88m28-72m12-cplr (-cprl on sc2) and MCPs are returned to operational levels at start of i/b cusp

   

751

261

 

18:54

MCP op level test performed, sensors in 68h38-68h38, performed at same time on all sc 4hrs 31 mins before sc1 L=6 

   

751

261

 

19:25

All change back to 88m28-72m12-cplr (-cprl on sc2) at end of test and all power off at L=6

16.05.05

23:25

751

261

17.05.05

01:05

At L=6 all power on into 88m28-72m12-cplr (-cprl on sc2)

   

752

261

 

08:48

At end of o/b cusp all change to 88h58-72m12-cplr; MCPs at gain of as close to 0.5 as possible (-cprl on sc2)

   

752

261

 

09:45

Sc 2,3,4 power off at M- o/b

   

752

261

 

15:35

Sc1 power cycles to, and sc 2,3,4 power on into, single sensor mode off-76m16-cpls (-cpsl on sc2), MCPs still at gain of as close to 0.5 as possible at B+ o/b

   

752

261

 

19:30

Sc 2,3,4 power off at B- o/b

   

752

261

18.05.05

07:05

Sc 2,3,4 power on into single sensor mode off-76m16-cpls (-cpsl on sc2), MCPs still at gain of as close to 0.5 as possible at B- i/b

   

752

261

 

10:55

Sc 2,3,4 power off; sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs still set to gain of as close to 0.5 as possible at B+ i/b

   

752

261

 

20:40

Sc 2,3,4 power on into 88h58-72m12-cplr (-cprl on sc2), MCPs set to gain of as close to 0.5 as possible at M- i/b

   

752

261

 

22:55

All change to 88m28-72m12-cplr (-cprl on sc2) and MCPs are returned to operational levels at M+ i/b and all power off at L=6

19.05.05

08:55

752

261

19.05.05

10:40

At L=6 all power on into 88m28-72m12-cplr (-cprl on sc2)

   

753

261

 

17:50

At end of o/b cusp all change to 88h58-72m12-cplr; MCPs at gain of as close to 0.5 as possible (-cprl on sc2)

   

753

261

 

18:55

Sc 2,3,4 power off at M- o/b

   

753

261

20.05.05

01:30

Sc1 power cycles to, and sc 2,3,4 power on into, single sensor mode off-76m16-cpls (-cpsl on sc2), MCPs still at gain of as close to 0.5 as possible at B+ o/b

   

753

261

 

02:40

Sc 1,3 change to off-72m12-cpxy-apl-64w12-tnl-nw, sc 2,4 to off-72m12-cplx-anl-nw, MCPs at gain of as close to 0.5 as possible for BM through BS o/b

   

753

261

 

04:40

All change to off-76m16-cpls (-cpsl on sc2) at end of BM

   

753

261

 

06:20

Sc 2,3,4 power off at B- o/b

   

753

261

 

13:50

Sc 2,3,4 power on into single sensor mode off-76m16-cpls (-cpsl on sc2), MCPs still at gain of as close to 0.5 as possible at B- i/b

   

753

261

 

18:40

Sc 2,3,4 power off; sc1 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs still set to gain of as close to 0.5 as possible at B+ i/b

   

753

261

21.05.05

05:25

Sc 2,3,4 power on into 88h58-72m12-cplr (-cprl on sc2), MCPs set to gain of as close to 0.5 as possible at M- i/b

   

753

261

 

06:55

All change to 88m28-72m12-cplr (-cprl on sc2) and MCPs are returned to operational levels at start of i/b cusp and all power off at L=6

21.05.05

17:50

753

261

21.05.05

19:30

At L=6 all power on into 88m28-72m12-cplr (-cprl on sc2)

   

754

262

22.05.05

01:40

Sc1,3 change to 88m28-72m12-cplxt-apl-64w12, sc 2,4 to 88m28-72m12-cplxy-apl-nw-aph-nw for BM through o/b MP

   

754

262

 

02:15

At M+ MCPs are set to gain of as close to 0.5 as possible

   

754

262

 

04:10

Sc2 changes to 88h58-72m12-cprl, sc 1,3,4 power off at end of BM / M- o/b

   

754

262

 

11:35

Sc2 power cycles to, and sc 1,3,4 power on into, single sensor mode off-76m16-cpls (-cpsl on sc2), MCPs still at gain of as close to 0.5 as possible at B+ o/b

   

754

262

23.05.05

02:15

Sc 1,3,4 power off; sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs still set to gain of as close to 0.5 as possible at B+ i/b

   

754

262

 

14:10

Sc 1,3,4 power on into 88h58-72m12-cplr (-cprl on sc2), MCPs set to gain of as close to 0.5 as possible at M- i/b

   

754

262

 

15:40

All change to 88m28-72m12-cplr (-cprl on sc2) and MCPs are returned to operational levels at start of i/b cusp

   

754

262

 

22:09

MCP op level test performed, sensors in 68h38-68h38, performed at same time on all sc 4hrs 31 mins before sc1 L=6 

   

754

262

 

22:40

All change back to 88m28-72m12-cplr (-cprl on sc2) at end of test and all power off at L=6

24.05.05

02:40

754

262

24.05.05

04:30

At L=6 all power on into 88m28-72m12-cplr (-cprl on sc2)

   

755

262

 

12:10

At end of o/b cusp all change to 88h58-72m12-cplr; MCPs at gain of as close to 0.5 as possible (-cprl on sc2)

   

755

262

 

13:20

Sc 1,3,4 power off at M- o/b

   

755

262

 

22:30

Sc2 power cycles to, and sc 1,3,4 power on into, single sensor mode off-76m16-cpls (-cpsl on sc2), MCPs still at gain of as close to 0.5 as possible at B+ o/b

   

755

262

25.05.05

05:25

Sc 1,3 change to off-72m12-cpxy-apl-64w12-tnl-nw, sc 2,4 to off-72m12-cplx-anl-nw, MCPs at gain of as close to 0.5 as possible for BM through BS o/b

   

755

262

 

07:25

All change to off-76m16-cpls (-cpsl on sc2) at end of BM

   

755

262

 

08:55

Sc 1,3,4 power off; sc2 HEEA powers on and instrument changes to 88h58-72m12-cplr, MCPs still set to gain of as close to 0.5 as possible at B+ i/b

   

755

262

 

22:45

Sc 1,3,4 power on into 88h58-72m12-cplr (-cprl on sc2), MCPs set to gain of as close to 0.5 as possible at M- i/b

   

755

262

26.05.05

01:20

All change to 88m28-72m12-cplr (-cprl on sc2) and MCPs are returned to operational levels at M+ i/b and all power off at L=6

26.05.05

12:10

755

262

   

Manoeuvres from now on until July 1st to change separation from 1300km to the multiscale 1000km/10,000km. Spacecraft event times now spaced widely apart, unless otherwise stated sc1 times only will be written in these tables

   

755

262

26.05.05

21:00

All power on into 88h58-72m12-cplr (-cprl on sc2), MCPs set to gain of as close to 0.5 as possible after manoeuvre firings

   

756

262

 

22:15

Sc1,3 change to 88m28-72m12-cplxt-apl-64w12, sc 2,4 to 88m28-72m12-cplxy-apl-nw-aph-nw for BM through o/b MP

   

756

262

27.05.05

00:15

Sc2 changes to 88h58-72m12-cprl, sc 1,3,4 power off at end of BM

   

756

262

28.05.05

07:20

Sc 1,3,4 power on into 88h58-72m12-cplr (-cprl on sc2), MCPs set to gain of as close to 0.5 as possible at M- i/b

   

756

262

 

09:00

All change to 88m28-72m12-cplr (-cprl on sc2) and MCPs are returned to operational levels at start of i/b cusp and all power off at L=6

28.05.05

20:50

756

262

28.05.05

22:25

At L=6 all power on into 88m28-72m12-cplr (-cprl on sc2)

   

757

263

29.05.05

01:40

At end of o/b cusp sc 2,3,4 change to 88h58-72m12-cplr; MCPs at gain of as close to 0.5 as possible (-cprl on sc2)

   

757

263

 

05:00

Sc1,3 change to 88m28-72m12-cplxt-apl-64w12, sc 2,4 to 88m28-72m12-cplxy-apl-nw-aph-nw; MCPs at gain of as close to 0.5 as possible for BM through o/b MP

   

757

263

 

08:00

Sc2 changes to 88h58-72m12-cprl, sc 1,3,4 power off at end of BM / M- o/b

   

757

263

   

Firings on sc1

   

757

263

30.05.05

14:35

Sc 3,4 power on into 88h58-72m12-cplr (-cprl on sc2), MCPs set to gain of as close to 0.5 as possible at M- i/b

   

757

263

 

17:45

Sc 2,3,4 change to 88m28-72m12-cplr (-cprl on sc2) and MCPs are returned to operational levels at start of i/b cusp

   

757

263

31.05.05

01:49

MCP op level test performed, sensors in 68h38-68h38, performed at same time on all sc 4hrs 31 mins before sc1 L=6  note this will now be in different places in the orbits of the four spacecraft

   

757

263

 

02:20

All change back to 88m28-72m12-cplr (-cprl on sc2) at end of test and all power off at L=6

31.05.05

06:20

757

263

31.05.05

08:10

At L=6 all power on into 88m28-72m12-cplr (-cprl on sc2)

   

758

263

 

16:00

At end of o/b cusp sc 2,3,4 change to 88h58-72m12-cplr; MCPs at gain of as close to 0.5 as possible (-cprl on sc2)

   

758

263

 

17:20

Sc 2,3,4 power off at M- o/b

   

758

263

 

20:00

Sc1 changes to, and sc3 powers on into, 88m28-72m12-cplxt-apl-64w12, sc 2,4 power on into 88m28-72m12-cplxy-apl-nw-aph-nw; MCPs at gain of as close to 0.5 as possible for BM through o/b MP

   

758

263

01.06.05

00:00

Sc1 changes back to 88h58-72m12-cplr, sc 1,3,4 power off at end of BM

   

758

263

 

01:43

Sc1 powers off for firings

   

758

263

   

Firings

   

758

263

 

13:45

Sc1 powers on into 88h58-72m12-cplr, MCPs at gain of as close to 0.5 as possible after firings end

   

758

263

 

20:30

Sc2 powers on into 88h58-72m12-cplr (-cprl on sc2), MCPs set to gain of as close to 0.5 as possible at M- i/b

   

758

263

 

21:42

Sc 1,2 power off for firings

   

758

263

   

Firings

   

758

263

02.06.05

12:20

Sc 1,3,4 power on into 88m28-72m12-cplr (-cprl on sc2) after firings, then all power off at L=6

02.06.05

16:30

758

263