next up previous contents
Next: Load Code Up: Initial Switch On Procedure Previous: Initial Switch On Procedure

Turn on Power

Perform the ``Nominal Switch On Procedure'' (see Section 8.1). Note however that the high voltages must not be switched on until 2 days after launch.




1998-12-23