Next:
End of Tests
Up:
Calibration and PV
Previous:
Image Acquisition Test
Other Tests
1.
dark current
2.
pulse height distribution
3.
LUT update
4.
flatfield/fullframe
5.
flatfield/BPE binned
6.
run the other engineering mode tests if there is time
1998-12-23