All cleanroom data updated as of: July 6, 2004 11:26

    • Cleanroom Status: Operational
    • Air changes per hour: 100
    • Cleanroom temperature: 19.50°C
    • Cleanroom Humidity: 50.14%
    • NVR level classification (MIL-STD 1246):Level A5
    • Particle fallout classification (MIL-STD 1246): Level 106.6 (avg)
    • Cleanroom classification (ISO ):Class 100
    • Airborne molecular contamination rate: 2Å/month

Short and medium term service activities for cleanroom:

    • 22 Sep 2004 - Six monthly service and validation. Cleanroom will be out of action for the day.Recommend all sensitive hardware be draped/covered. Assembly activities should not take place over this period.
    • 27th & 28th April 2004 - Cleanroom antroom floor replacement. No access to cleanroom for these two days as Dycem lay a new workzone cleanroom floor in the anteroom.
    • 21 Apr 2004 - Six monthly service and validation. Cleanroom will be out of action for the day.Recommend all sensitive hardware be draped/covered. Assembly activities should not take place over this period.
    • 24 Feb 2004 - Cleanroom humidity and temperature controls remedial work, including condensor units - Cleanroom will be out of action for the day.Recommend all sensitive hardware be draped/covered. Assembly activities should not take place over this period.
    • 16 Feb 2004 to 18 Feb 2004 - Installation of chiller water supply pipes for laser facility. Activity will last 2 days. Recommend all sensitive hardware be draped/covered. Assembly activities should not take place over this period.

 